Central Water Commission Tender
With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.
Costs
EMD
₹ 37,865Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of Brick Wall Boundry At Hathidah(gdsq) Site
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CWC_839587_1Tender No
LGD-2/PAT/HQ-75/CIVIL WORK/2024/ 10Tender Authority
Central Water Commission ViewPurchaser Address
-Website
http://http://cwc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of brick wall boundry at Hathidah(GDSQ) site under Lower Ganga Division-2, Central Water Commission, Patna
Construction of brick wall boundry at Hathidah(GDSQ) site under Lower Ganga Division-2, Central Water Commission, Patna
Construction of brick wall boundry at Hathidah(GDSQ) site under Lower Ganga Division-2, Central Water Commission, Patna
BOQ Items
... More
Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
231.1
-
-
... More
Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete
5.01
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources
7.52
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
22
-
-
... More
Providing and laying in position specified grade of reinforced cement concrete (M20), excluding the cost of centering, shuttering, finishing and reinforced For Footing, For Column (above footing up to plinth)& Tie-Beam at ground level
33.69
-
-
... More
Reinforced cement concrete work in beam,suspended floors,roofs having slope upto 15 degree landings, balconies,s helves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level upto, up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement with 1:1.5:3(1 cement :1.5 coarse sand (zone 111)derived from natural sources :3 graded stone aggregate 20mm nominal size derived from natural sources ) for columan
7.22
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level of grade FE 500D or more for, footing T-beam , column
3498.6
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level of grade FE 500D or more for column
627.23
-
-
... More
Form Work: Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
127.88
-
-
... More
Form Work: Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
120.23
-
-
... More
Columns, Pillars, Piers, Abutments, Posts and Struts
115.5
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
56.67
-
-
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. for Gate
224.86
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%