Water Resources Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date13 Sep 2023
Closing Date17 Oct 2023
Tender Amount₹ 25,00,00,000 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of specified silt from flood plain or adjacent chars, within a distance of 1000M of the work site and filling geo-bags of size 1.03M x 0.70M with silt, Weighing the same, for each silt filled bags to weigh 126 kg after filling, stitching the Mouth of the filled bags with polypropylene thread by power driven double needle machine as per drawing and technical specification, stockpiling the same in batches of 100 for easy counting and carrying the same and unloading in the work site or in the dumping pantoon/ barge stationed in the work site by engine boat including all loading and unloading, handling charges and any local carriage within a distance of 250m including all lead and lift etc complete as directed. (Geo-bags to be supplied by the Dept.)

2352150

-

-

... More
Dumping of sand filled Geo-bags from properly positioned and anchored flat top pontoon/barge over an area specified by bathymetric survey for uniform area coverage along the bank line up to the designed length towards river, making a provisional falling apron at the end of the section away from bank line including loading unloading, sequential stacking on the pontoon/barge, carrying from stack yard to dumping place by power driven flat top country boat including mobilization of all necessary equipment etc. complete as per technical specification and approved design and contractor's method statement. The pontoon (minimum length 30 (M) position shall be monitored by RTK-GPS or Total Station up to an accuracy of ± 10 cm and a minimum 30 M Berge/pontoon should cover at least an area of 30m x 20 m per working day including the provisional falling apron as per design, technical specification and direction of the Engineer-in-charge.

2352150

-

-

... More
Items for Temporary Protection Measures of Bank as Directed by the Engineer

-

-

-

... More
Carriage of Geo-bags of size 1.03 x 0.70 m including loading & unloading, Stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. (Carriage from Morigaon Water Resource Godown, Balidunga, P.O. Bhuragaon, Dt. Morigaon, Pin 782121, Assam, India to Stackyard for an average distance of 6.00 km)

73926

-

-

... More
Filling and laying of Geo-bags of size 1.03m X 0.70m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90m of the work site, filling geo-bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150m and laying properly as directed. (sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) Without Boat

73926

-

-

... More
Collection and supply of River silt by truck carriage free from debris and other foreign material, etc. complete as directed. By mechanical Means. For initial upto 1.00 km & for all lifts.

6209.78

-

-

... More
Collection and supply of River silt by truck carriage free from debris and other foreign material, etc. complete as directed. By mechanical Means. For initial upto 1.00 km & for all lifts. For beyond initial 1 km & upto 10.00 km & for all lifts. (for 1Km)

6209.78

-

-

... More
SECTION 2: Above water works with permanent riverbank revetment works

-

-

-

... More
Earthwork in bank trimming to the designed section/slope by mechanical means including removing the soils at safe distance, complete as directed

324622.5

-

-

... More
Earthwork in excavation by hydraulic excavator, to proper grade and slopes as required including utilizing the spoils for filling works in the vicinity including removing roots & vegetation, dressing to design section etc. complete as directed. Ordinary Soil, For depth up to 3.00m

16275

-

-

... More
Earthwork in embankment by manual means by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debris, breaking clods up to 4cm cube, dressing as per design section, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage). For initial lead upto 1 Km and for all lifts

25024

-

-

... More
Earthwork in embankment by manual means by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4cm cube, dressing as per design section, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage) For every Km extra lead beyond initial lead of 1 km & upto 10 kms

25024

-

-

... More
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pagging with Jati bamboo split, watering till the grass grows for a lead up to 90m and all lifts, etc. complete as directed.

10165

-

-

... More
Carriage of Geo-bags of size 1.03 x 0.70 m including loading & unloading, Stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. (Carriage from Morigaon Water Resource Godown, Balidunga, P.O. Bhuragaon, Dt. Morigaon, Pin 782121, Assam, India to Stackyard for an average distance of 6.00 km)

869535

-

-

... More
Carriage of 300 gsm Geo-sheet of including loading & unloading , Stacking cost of P.O.L., etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (Carriage from Morigaon Water Resource Godown, Balidunga, P.O. Bhuragaon, Dt. Morigaon, Pin 782121, Assam, India to Stackyard for an average distance of 6.00 km)

163406.25

-

-

... More
Supply of Galvanized Wire Netting Sheet made of 8 SWG wire 152mm square mesh in sheet 2.57m x 1.66m with longitudinal wire at 152 mm center and 76mm projection of each wire on all sides beyond the net size of 2.42m x 1.5m having knots of 12 SWG at every joints, weight of each sheet should not be less than 6.3 kg/ sheet.

40080

-

-

... More
Carriage of wire netting sheets of size 2.57 X 1.67 m made of 8 G wire of 152mm Sq. mesh including loading & unloading, Stacking cost of P.O.L., etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (distance to be calculated from Guwahati) Dist=105km

40080

-

-

... More
Collection and supply of River silt by truck carriage free from debris and other foreign material, etc. complete as directed. By mechanical Means. For initial upto 1.00 km & for all lifts.

73040.94

-

-

... More
Collection and supply of River silt by truck carriage free from debris and other foreign material, etc. complete as directed. By mechanical Means. For beyond initial 1 km & upto 10.00 km & for all lifts. (for 1Km)

73040.94

-

-

... More
Labour charge for laying Geo-fabric sheet as filter bellow pitching including carrying, lapping, wrapping & stitching as directed by the Engineer-in-Charge.

155625

-

-

... More
Filling and laying of Geo-bags of size 1.03m X 0.70m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90m of the work site, filling geo-bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150m and laying properly as directed. (sand/silt, Geo-bag and Polypropylene thread will be supplied by the department free of cost) Without boat

629055

-

-

... More
Filling and laying in cage with sand/silt filled Geo-bags of size 1.03m X 0.70m excluding excavation of specified sand/silt from flood plain or adjacent chars within a distance of 90m of the work site, filling geo-bags with sand having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling ,double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150m and laying properly. in cages made of wire netting sheets of size 2.57x1.66m of 8G galvanized wire making the cage from 2 nos. of wire netting sheet by tying the projected wires complete as directed. (Geo-bag, Wire Netting Sheets and Polypropylene thread will be supplied by the department free of cost) Without Boat

240480

-

-

... More
B. ENVIRONMENTAL MITIGATION AND MONITORING MEASURES

-

-

-

... More
Provision for compensatory plantation (1:10) measures, monitoring and maintenance during construction period

3500

-

-

... More
Obtaining and submission of copies to Engineer all consents, permits, clearances, no objection clearances or NOCs, tree cutting permissions, and other relevant permits from various authorities before the start of construction

1

-

-

... More
Disposal of existing old geo-bags and other materials used as temporary anti-erosion and flood protection measures, and disposal of all solid wastes during construction to designated locations and/or use of local municipal services (payable at completion of works)

1

-

-

... More
Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection & disposal, fuel supply etc.) at construction camps.

36

-

-

... More
Rehabilitation of borrow areas and other impacted lands in line with WRD guidelines, and decommissioning of construction camp before handling over the subproject (payable at completion of works).

1

-

-

... More
Traffic management at work sites (i.e. pavement markings, channelizing devices, arrow panels and warning lights) along with construction and/or strengthening of landing ghats for barges

36

-

-

... More
Water sprinkling for dust suppression, barricading, temporary noise barriers, and provision of personal protective equipment (such as boots, life-saving-jackets, etc.)

36

-

-

... More
Air quality monitoring for PM2.5, PM10, SO2, NOX, CO, Pb

40

-

-

... More
Noise levels monitoring for Noise levels in dB (A) for day, night, L10, L90, Lmax, Lmin

10

-

-

... More
Surface water quality monitoring for pH, BOD, COD, TDS, TSS, DO, Oil and grease and other physio-chemical and biological parameters

10

-

-

... More
Drinking water monitoring for pH, BOD, TDS, DO, Fl, Cl, As, Cd, MG, Mn, total coliform and other physio-chemical and biological parameters

10

-

-

... More
Groundwater monitoring for pH, BOD, TDS, DO, Fl, Cl, As, Cd, MG, Mn, total coliform and other physio-chemical and biological parameters

10

-

-

... More
Soil quality monitoring for NPK & heavy metals, grease and other baseline parameters

6

-

-

... More
C. PROVISIONAL SUMS

-

-

-

... More
Provisional sum amount for various activities, Implementation of biodiversity action plan and other biodiversity conservation and mitigation measures and others

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.