BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date13 Sep 2023
Closing Date20 Oct 2023
Tender Amount₹ 21,00,00,000 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of specified silt from flood plain or adjacent chars, within a distance of 2000m of the work site and filling geo-bags of size 1.03M x 0.70M with silt, Weighing the same, for each silt filled bags to weigh 126 kg after filling, stitching the mouth of the filled bags with polypropylene or polyester thread by power driven double needle machine as per drawing and technical specification, stockpiling the same in batches of 100 for easy counting and carrying the same and unloading in the work site or in the dumping pontoon / barge stationed in the work site by engine boat including all loading and unloading, handling charges and any local carriage within a distance of 250m including all lead and lift etc. complete as directed. (Geo bags and polypropylene thread will be supplied by the Dept. free of cost)

1548387

-

-

... More
Dumping of sand/silt filled type-A Geo-bags from properly positioned and anchored flat top pontoop / barge over an area specified by bathymetric survey for uniform area coverage along the bank line upto the designed length towards making a provisional falling apron at the end of the section away from bank line including loading, unloading, sequential stacking on the pontoon / barge including mobilisation of all necessary equipment etc. complete as per technical specification and approved design and contractor's method statement, the pontoon (minimum length-30m) position shall be monitored by RTK-GPS or Total Station upto a accuracy of + 10cm and a minimum 30m long barge / pontoon and should cover at least an area of 30m x 20m per working day including the provisional falling apron as per design and technical specification and direction of engineer-in-charge, as per the Specification.

1548387

-

-

... More
Filling and laying of Geo bags of size 1.03 m × 0.70 m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling, double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly as directed. (Sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) With Engine Boat

387097

-

-

... More
Items for Temporary Protection Measures of Bank as Directed by the Engineer

-

-

-

... More
Carriage of Geo Bags of size 1.03 x 0.70 m including loading & unloading, Stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. (Carriage from Goalpara Water Resources. Godown, Goalpara Town Protection Area, Near Bara Bazaar to Stackyard for an average distance of 60.00 km)

75270

-

-

... More
Filling and laying of Geo bags of size 1.03 m × 0.70 m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling, double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly as directed. (Sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) Without Boat

75270

-

-

... More
Collection and supply of River silt by truck carriage free from debries and other foreign material, etc. complete as directed. By mechanical Means For initial up to 1.00 Km & for all lifts.

6322.68

-

-

... More
SECTION 2 - Above water works with permanent riverbank revetment works and construction of a new earthen flood embankment with RCC box culvert Above water works with permanent riverbank revetment works

-

-

-

... More
Earthwork in bank trimming to the designed section/slope by mechanical means including removing the trimmed soils to a minimum distance of 30 m, complete as directed.

194500

-

-

... More
Carriage of Geo Bags of size 1.03 x 0.70 m including loading & unloading, Stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. (Carriage from Goalpara Water Resources. Godown, Goalpara Town Protection Area, Near Bara Bazaar to Stackyard for an average distance of 60.00 km)

729622

-

-

... More
Carriage of 300 gsm Geo sheet of including loading & unloading, Stacking cost of P.O.L., etc. complete and including hire charge of truck with driver and handyman completed as directed. (Carriage from Goalpara Water Resources. Godown, Goalpara Town Protection Area, Near Bara Bazaar to Stackyard for an average distance of 60.00 km)

126525

-

-

... More
Labour charge for laying Geo fabric sheet as filter bellow pitching including carrying, lapping, wrapping & stitching as directed by the Engineer-in-Charge.

120500

-

-

... More
Collection and supply of River silt by truck carriage free from debries and other foreign material, etc. complete as directed. By mechanical Means For initial up to 1.00 Km & for all lifts.

61288

-

-

... More
Filling and laying in cage with sand/silt filled Geo bags of size 1.03 m × 0.70 m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling, double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly. in cages made of wire netting sheets of size 2.57 × 1.66 m of 8 G galvanized wire making the cage from 2 nos. of wire netting sheet by tying the projected wires complete as directed. (Geo Bag, Wire Netting Sheets and Polypropylene thread will be supplied by the department free of cost) Without Boat

192000

-

-

... More
Filling and laying of Geo bags of size 1.03 m × 0.70 m excluding excavation of sand/silt of size more than 80 micron from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly as directed. (Sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) Without Boat

460970

-

-

... More
Construction and supply of Wire -netting box of size 1.50m × 1.50 m × 0.45 m made with mechanically woven, double twisted, hexagonal shaped wire mesh with wire made of low carbon, high ductile MS wire with heavy class of galvanization with an additional layer of PVC coating with mesh type of 10 × 12 as per EN 10223 & ASTM A975, mesh wire of 2.70 mm (I.D) /3.70 mm (OD) tensile strength of 450-500/mm2, edge wire selvedge around it at least 2.5 times, lacing wire (zinc PVC coated ) of 2.20mm (I.D) /3.20mm (OD), VC coating thickness of 0.50mm nominal, 0.38 mm minimum, Mesh opening size 150mm × 150mm and with average weight per unit being 12 kg with additional 3% of the weight of box for lacing wire supplied separately, supporting the facing of the box with zinc coated steel wire of required length as directed, complying with ASTM and European norms

16000

-

-

... More
Earth work in excavation of drainage channel to the proper grade and slopes as required including depositing the excavated debris/soil to a safe distance of minimum 50 m distance as directed. For lead up to 50 m and all lifts. Normal Soil

7425

-

-

... More
B. ENVIRONMENTAL MITIGATION AND MONITORING MEASURES

-

-

-

... More
Provision for compensatory plantation (1:10) measures, monitoring and maintenance during construction period

3500

-

-

... More
Obtaining and submission of copies to Engineer all consents, permits, clearances, no objection clearances or NOCs, tree cutting permissions, and other relevant permits from various authorities before the start of construction

1

-

-

... More
Disposal of existing old geo-bags and other materials used as temporary anti-erosion and flood protection measures, and disposal of all solid wastes during construction to designated locations and/or use of local municipal services (payable at completion of works)

1

-

-

... More
Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection & disposal, fuel supply etc.) at construction camps.

36

-

-

... More
Rehabilitation of borrow areas and other impacted lands in line with WRD guidelines, and decommissioning of construction camp before handling over the subproject (payable at completion of works).

1

-

-

... More
Traffic management at work sites (i.e. pavement markings, channelizing devices, arrow panels and warning lights) along with construction and/or strengthening of landing ghats for barges

36

-

-

... More
Water sprinkling for dust suppression, barricading, temporary noise barriers, and provision of personal protective equipment (such as boots, life-saving-jackets, etc.)

36

-

-

... More
Air quality monitoring for PM2.5, PM10, SO2, NOX, CO, Pb

40

-

-

... More
Noise levels monitoring for Noise levels in dB (A) for day, night, L10, L90, Lmax, Lmin

10

-

-

... More
Surface water quality monitoring for pH, BOD, COD, TDS, TSS, DO, Oil and grease and other physio-chemical and biological parameters

10

-

-

... More
Drinking water monitoring for pH, BOD, TDS, DO, Fl, Cl, As, Cd, MG, Mn, total coliform and other physio-chemical and biological parameters

10

-

-

... More
Groundwater monitoring for pH, BOD, TDS, DO, Fl, Cl, As, Cd, MG, Mn, total coliform and other physio-chemical and biological parameters

10

-

-

... More
Soil quality monitoring for NPK & heavy metals, grease and other baseline parameters

6

-

-

... More
C. PROVISIONAL SUMS

-

-

-

... More
Provisional sum amount for various activities, Implementation of biodiversity action plan and other biodiversity conservation and mitigation measures and others

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.