Water Resources Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 46,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WREAP_32451_1Bid Award Id
ViewTender No
WRD/ADB/OCB-Works/03Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://assamtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Collection and carriage of specified selected silt available from the riverbed beyond 500m and upto 2000m from the work site including loading, unloading and stacking within 90m from the geobag dumping site with 10 HP engine boat including cost of POL etc complete as directed.
214704.42
-
-
Filling and laying of Geo-bags of size 1.03m X 0.70m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90m of the work site, filling Geo-bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150m and laying properly as directed. (sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) With engine Boat
2556005
-
-
Items for Temporary Protection Measures of Bank as Directed by the Engineer
-
-
-
Carriage of Geo-bags of size 1.03 x 0.70 m including loading & unloading, Stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. (Carriage from Morigaon Water Resource Godown, Balidunga, P.O. Bhuragaon, Dt. Morigaon, Pin 782121, Assam, India to Stackyard for an average distance of 14.00 km)
80335
-
-
Filling and laying of Geo-bags of size 1.03m X 0.70m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90m of the work site, filling Geo-bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150m and laying properly as directed. (sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost)
Without Boat
80335
-
-
Collection and supply of River silt by truck carriage free from debris and other foreign material, etc. complete as directed. By mechanical Means. For initial upto 1.00 km & for all lifts.
6748.14
-
-
Collection and supply of River silt by truck carriage free from debries and other foreign material, etc. complete as directed. By mechanical Means. For initial upto 1.00 km & for all lifts.
For beyond initial 1 km & upto 10.00 km & for all lifts. (for 1Km)
6748.14
-
-
SECTION 2: Above water works with permanent riverbank revetment works
-
-
-
Earthwork in bank trimming to the designed section/slope by mechanical means including removing the soils at safe distance, complete as directed.
352359.75
-
-
Earth work in excavation by hydraulic excavator, to proper grade and slopes as required including utilizing the spoils for filling works in the vicinity including removing roots & vegetation, dressing to design section etc. complete as directed. Ordinary Soil, For depth up to 3.00m
17685.5
-
-
Earth work in embankment by manual means by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4cm cube, dressing as per design section, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage).For initial lead upto 1 Km and for all lifts
35663
-
-
Earth work in embankment by manual means by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debris, breaking clods up to 4cm cube, dressing as per design section, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage).For every Km extra lead beyond initial lead of 1 km & upto 10 kms
35663
-
-
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pagging with Jati bamboo split, watering till the grass grows for a lead up to 90m and all lifts, etc. complete as directed.
13617
-
-
Carriage of Geo-bags of size 1.03 x 0.70 m including loading & unloading, Stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. (Carriage from Morigaon Water Resource Godown, Balidunga, P.O. Bhuragaon, Dt. Morigaon, Pin 782121, Assam, India to Stackyard for an average distance of 14.00 km)
945114
-
-
Carriage of 300 gsm Geo sheet of including loading & unloading , Stacking cost of P.O.L., etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed.
(Carriage from Morigaon Water Resource Godown, Balidunga, P.O. Bhuragaon, Dt. Morigaon, Pin 782121, Assam, India to Stackyard for an average distance of 14.00 km)
177568.13
-
-
Supply of Galvanized Wire Netting Sheet made of 8 SWG wire 152mm square mesh in sheet 2.57m x 1.66m with longitudinal wire at 152 mm center and 76mm projection of each wire on all sides beyong the net size of 2.42m x 1.5m having knots of 12 SWG at every joints, weight of each sheet should not be less than 6.3 kg/ sheet.
43632
-
-
Carriage of wire netting sheets of size 2.57 X 1.67 m made of 8 G wire of 152mm Sq. mesh including loading & unloading, Stacking cost of P.O.L., etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (distance to be calculated from Guwahati) Dist=105km
43632
-
-
Collection and supply of River silt by truck carriage free from debries and other foreign material, etc. complete as directed. By mechanical Means. For initial upto 1.00 km & for all lifts.
57399.05
-
-
Collection and supply of River silt by truck carriage free from debries and other foreign material, etc. complete as directed. By mechanical Means. For beyond initial 1 km & upto 10.00 km & for all lifts. (for 1Km)
57399.05
-
-
Collection and carriage of specified selected silt available from the river bed beyond 500m and upto 2000m from the work site including loading, unloading and stacking within 90m from the geobag dumping site with 10 HP engine boat including cost of POL etc complete as directed.
21990.52
-
-
Labour charge for laying Geo fabric sheet as filter bellow pitching including carrying, lapping, wrapping & stitching as directed by the Engineer-in-Charge.
169112.5
-
-
Filling and laying of Geo-bags of size 1.03m X 0.70m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90m of the work site, filling Geo-bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150m and laying properly as directed. (sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) Without Boat
683322
-
-
Filling and laying in cage with sand/silt filled Geo-bags of size 1.03m X 0.70m excluding excavation of specified sand/silt from flood plain or adjacent chars within a distance of 90m of the work site, filling Geo-bags with sand having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling ,double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150m and laying properly. in cages made of wire netting sheets of size 2.57x1.66m of 8G galvanized wire making the cage from 2 nos. of wire netting sheet by tying the projected wires complete as directed. (Geo Bag , Wire Netting Sheets and Polypropylene thread will be supplied by the department free of cost) Without Boat
261792
-
-
B. ENVIRONMENTAL MITIGATION AND MONITORING MEASURES
-
-
-
Provision for compensatory plantation (1:10) measures, monitoring and maintenance during construction period
3500
-
-
Obtaining and submission of copies to Engineer all consents, permits, clearances, no objection clearances or NOCs, tree cutting permissions, and other relevant permits from various authorities before the start of construction
1
-
-
Disposal of existing old geo-bags and other materials used as temporary anti-erosion and flood protection measures, and disposal of all solid wastes during construction to designated locations and/or use of local municipal services (payable at completion of works)
1
-
-
Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection & disposal, fuel supply etc.) at construction camps.
36
-
-
Rehabilitation of borrow areas and other impacted lands in line with WRD guidelines, and decommissioning of construction camp before handling over the subproject (payable at completion of works).
1
-
-
Traffic management at work sites (i.e. pavement markings, channelizing devices, arrow panels and warning lights) along with construction and/or strengthening of landing ghats for barges
36
-
-
Water sprinkling for dust suppression, barricading, temporary noise barriers, and provision of personal protective equipment (such as boots, life-saving-jackets, etc.)
36
-
-
Air quality monitoring for PM2.5, PM10, SO2, NOX, CO, Pb
40
-
-
Noise levels monitoring for Noise levels in dB (A) for day, night, L10, L90, Lmax, Lmin
10
-
-
Surface water quality monitoring for pH, BOD, COD, TDS, TSS, DO, Oil and grease and other physio-chemical and biological parameters
10
-
-
Drinking water monitoring for pH, BOD, TDS, DO, Fl, Cl, As, Cd, MG, Mn, total coliform and other physio-chemical and biological parameters
10
-
-
Groundwater monitoring for pH, BOD, TDS, DO, Fl, Cl, As, Cd, MG, Mn, total coliform and other physio-chemical and biological parameters
10
-
-
Soil quality monitoring for NPK & heavy metals, grease and other baseline parameters
6
-
-
C. PROVISIONAL SUMS
-
-
-
Provisional sum amount for various activities, Implementation of biodiversity action plan and other biodiversity conservation and mitigation measures and others
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements