Water Resources Department Tender
... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WREAP_44377_1Tender No
568378/298BTender Authority
Water Resources Department ViewPurchaser Address
-Website
http://assamtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Sediment monitoring: SS sampling for particle size distribution measurement in mainstream 3 Transects *3 locations * 3 depths *3 times * 3 years
243
1
243
... More
Sediment monitoring: SS sampling for particle size distribution measurement in tributaries. 10Transects * 3 locations * 3 depths * 3 times * 3 years
810
1
810
... More
Sediment monitoring: Bed sediment sampling for particle size distribution in mainstream. 5 Transects * 3 location * 2 times * 3 years
90
1
90
... More
Sediment monitoring: Bed sediment sampling for particle size distribution in tributaries. 10 Transects * 3 Location * 2 times * 3 years
180
1
180
... More
River survey: Cross-section measurements (SBES + Total Station) in mainstream
(Specification: Each cross section to be surveyed annually during the receding flood season for 3 years) 347 km (total length of 36 cross sections) * 3 years
1041
1
1041
... More
River survey: Cross-section measurements (SBES + Total Station) in tributaries
(Specification: Each cross section to be surveyed annually during the receding flood season for 3 years) 3 km (total length of 10 cross sections) * 3 years
9
1
9
... More
River survey: Near-field bathymetric/ topographic measurement
(Specification: At each location Near-field bathymetric/ topographic measurement shall cover length of ongoing civil works + one km extra coverage considering 500m upstream and 500m downstream; survey shall take place three times in year for 3 years) [33 km (length of civil works at 18 locations) + 18 km (1 km in each site)] *300 m transect / at 50 m interval * 3 times in a year * 3 years
2754
1
2754
... More
Hydraulics: Discharge, velocity and water level without sediment measurement in mainstream
(Specification: Each cross section to be surveyed 3 times annually during June, August, and October for 3 years) 100 km (total length of 10 cross sections) *3 times a year * 3 year
900
1
900
... More
Hydraulics: Discharge, velocity and water level with sediment measurement in mainstream
(Specification: Each cross section to be surveyed 13 times a year for 3 years) 18 km (length of 3 cross sections) * 13 times a year * 3 years
702
1
702
... More
Hydraulics: Discharge, velocity and water level with sediment measurement in tributaries
(Specification: Each cross section to be surveyed 13 times a year for 3 years) 3 km (length of 10 cross sections) * 13 times a year * 3 years
117
1
117
... More
Float tracking in mainstream 4 tracks (35 km + 34 km + 40 km + 57 km) * 2 times a year * 3 years
996
1
996
... More
Site (underwater work) monitoring surveys: MBES measurement
(Specification: At each location MBES measurement shall cover the length of ongoing civil works; survey shall take place annually around October month for 3 years) 33 km (length of civil works at 18 locations) *0.15 km * 3 years
14.85
1
14.85
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%