Urban Development Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 19,43,194Document Cost
₹ 19,000Tender Fee
Refer Documents
Summary
Design, Supply, Construction, Installation, Testing And Commissioning Of Sewage Treatment Plant At Sibsagar Town
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UDD_38957_1Bid Award Id
ViewTender No
SBM-U 271/2024/5 Dt. 06-09- 2024Tender Authority
Urban Development Department ViewPurchaser Address
-Website
http://https://udd.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Design, Supply, Construction, Installation, Testing and Commissioning of Sewage Treatment Plant at Sibsagar Town
BOQ Items
LAND DEVOLOPMENT WORK
1
-
-
TRANSFORMER SHED
1
-
-
AIR BLOWER SHED
1
-
-
TUBE WELL
1
-
-
CPR AND ELECTRICAL ROOM
1
-
-
Civil Works for STP
-
-
-
RECEIVING CHAMBER, COARSE SCREEN
1
-
-
WET WELL
1
-
-
FINE SCREEN, OIL & GREASE TANK AND GRIT CHAMBER
1
-
-
U.A.S.B REACTOR
1
-
-
SETTELING TANK WITH TUBE SETTLER
1
-
-
CCT TANK
1
-
-
HYPO TANK
1
-
-
SLUDGE DRYING BED
1
-
-
ELECTROMECHANICAL WORKS for STP
1
-
-
ELECTRICAL WORKS for STP
1
-
-
COMMON CONVEY SYSTEM
-
-
-
PIPE LAYING FOR I & D
1
-
-
Intermidiate Sewage Pumping Station
1
-
-
PUMP ROOM FOR PUMPING STATION
1
-
-
COARSE SCREEN&INLET CHAMBER FOR PUMPING
1
-
-
Pen stock gate/sluice gate valve for inlet sewage
-
-
-
Supply, Fitting and Fixing as per latest BIS Code along with all tools and tackles of Thimble mounted pen stock gate/sluice gate valve with required rising spindle of 5.5m. Size: 450 mmx 450 mm, MOC: CI, , Make: Jash/W2P/approved equivalent.
1
-
-
Coarse Screen-Manual
-
-
-
Supply, Fitting and Fixing as per latest BIS Code along with all tools and tackles of MSEP, Manual screen, Liquid depth 400mm with 20 mm clear spacing . Frame 50 mm x 10 mm for screen guides and tooth rack for cleaning the trash . Lifting Arrangement ( galvanised chain & hook attached to screen for facility of lifting Upstream of the screen to be provided) , Size of the chamber- 4.0m (L) X 1.0m(W)x 0.4m LD) make - W2Por approved equivalent
1
-
-
Submersible Pupms
-
-
-
Supply, Fitting and Fixing as per latest BIS Code along with all tools and tackles of non clog submersible type pumps, having CI casing & CI impeller complete with all accessories and motor of required capacity. Delivery header with isolation valve and single plate NRV and by-pass arrangement, liftng arrangement (1 MT. Capacity,Manual operated chain pully block with trolly) pressure gauge, motor protection-IP68 with level controller and transmitter, dry run protection with wiring to control panel,etc. Drain arrangement with same dia valve shall be provided to delivery header.
1
-
-
Raw Sewage Transfer pumps for STP
-
-
-
(Minimum Solid handling cap. 40 mm)`, Quantity:4 (3 Working + 1 Standby) , Flow rate (each) : 175 m3/hr , Head (TDH) : 15.00 Mtr , Motor HP : 50 , Make‐KSB/Wilo/ Xylem/Grundfos
4
-
-
Civil Works of WEIR (Concrete weir, Length = 3m , Height = 1.5m thick = 0.4m)
6
-
-
COMMUNITY SOAK PIT ( ward 14.) (Made of brick , Length = 4.0m , Breadth = 2.0m Height = 1.0m )
4
-
-
Operation and maintenance (O&M ) for 5 years
-
-
-
Operation, maintenance, excluding APDCL charges for Power Consumption, but including required Manpower, chemicals and material, repairing of all components as required, repair to pipeline leakages, road restoration for the repairing works, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of Sewerage Treatment plants ( proposed)pumps and motors, pumping stations including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. and all works related to plant operation as per scope of work, specification , performance indicator and other relevant works for 5(Five) years. Sewage Treatment Plant must comply each and every point of CPCB SOP https://cpcb.nic.in/NGTMC/sop_ocems_stp.pdf and to comply all SOP points during commissioning and Operation & Maintenance of OCEMS system and any other works as directed by Engineer in charge/ employer (APDCL Energy Charges will be borne by the ULB)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements