Urban Development Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 78,960Document Cost
₹ 900Tender Fee
Refer Documents
Summary
Construction Of Clock Tower At Barpeta Road Town
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UDD_36458_1Bid Award Id
ViewTender No
BRMB/02/2023-24Tender Authority
Urban Development Department ViewPurchaser Address
-Website
http://https://udd.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying chemical emulsion in sealed containers including delivery as specified
Chlorpyriphos/ Lindane emulsifiable concentrate of 20%
25
-
-
Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration
25
-
-
Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
3.72
-
-
Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns
17.84
-
-
Retaining walls, return walls, walls (any thickness) including
attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
134.59
-
-
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size)
14.13
-
-
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
All works upto plinth level
28.33
-
-
Concrete of M25 grade with minimum cement content of 330 kg /cum
All works above plinth level upto floor V level
Concrete of M25 grade with minimum cement content of 330 kg /cum
23.26
-
-
Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
0.28
-
-
Centering and shuttering including strutting, propping etc. and removal of form for all heights :
Suspended floors, roofs, landings, balconies and access platform
4.98
-
-
Lintels, beams, plinth beams, girders, bressumers and cantilevers
38.01
-
-
Columns, Pillars, Piers, Abutments, Posts and Struts
105.24
-
-
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
5670.58
-
-
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500 D or more
3237.34
-
-
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand)
1.6
-
-
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.
Cement mortar 1:4 (1 cement :4 coarse sand)
28.93
-
-
Extra for providing and placing in position 2 Nos 6mm dia. M.S. bars at every third course of half brick masonry.
28.93
-
-
Brick edging 7cm wide 11.4 cm deep to plinth protection with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 including grouting with cement mortar 1:4 (1 cement : 4 fine sand).
14.13
-
-
Providing and fixing IS : 12817 marked stainless steel butt hinges (heavy weight) with stainless steel screws etc. complete ::
125x64x2.50 mm
4
-
-
Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :
250x10 mm
8
-
-
Providing and fixing bright finished brass door latch with necessary screws etc. complete :
300x16x5 mm
4
-
-
Providing and fixing bright finished brass handles with screws etc. complete:
125 mm
8
-
-
Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete.
8
-
-
Providing and fixing factory made uPVC white colour fixed glazed windows /ventilators comprising of uPVC multi-chambered frame and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2mm thick galvanized mild steel section made from roll forming processof required length (shape & size according to uPVC profile), , uPVCextruded glazing beads of appropriate dimension, EPDM gasket, G.Ifasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profileof frame shall be mitred cut and fusion welded at all corners, mullion (i frequired) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in Charge. (Single / double glass panes and silicon sealant shall be paid eparately). Variation in profile dimension in higher side shall be acceptedbut no extra payment on this account shall be made.
For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable.
Fixed window / ventilator made of (small series) frame 47 x 50 mm & mullion 47 x 68 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area upto 0.75 sqm.)
20.79
-
-
Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with :
5.5 mm thick glass panes
20.79
-
-
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
1027.44
-
-
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
40 mm thick with 20 mm nominal size stone aggregate
2.26
-
-
Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.
Polished Granite stone slab of all colour and texture except Black, Cherry/Ruby Red
33.32
-
-
15 mm cement plaster on the rough side of single or half brick wall of mix :
1:4 (1 cement: 4 fine sand)
228.5
-
-
6 mm cement plaster of mix :
1:3 (1 cement : 3 fine sand)
144.4
-
-
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
745.8
-
-
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :
Water thinnable cement primer
601.4
-
-
Finishing walls with textured exterior paint of required shade :
New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm
372.9
-
-
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete.
On steel work
10.56
-
-
Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap).
Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used .
450 mm dia piles
240
-
-
Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.
Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing.
Note: 2. Testing agency shall submit the design of loading platform for the approval of Engineer-in-charge.
Single pile upto 50 tonne Safe capacity
Initial test (Test Load 2.5 times the Safe capacity)
1
-
-
Routine test (Test Load 1.5 times the Safe capacity)
1
-
-
Lateral load testing of single pile in accordance with IS Code of practice IS : 2911 (Part IV) for determining safe allowable lateral load on pile :Upto 50 tonne capacity pile
1
-
-
Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge.
Note :- The inclusion of the above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project.
1
-
-
Supplying and Installation of 7' size clock
4
-
-
Lanscapping and gardening
1
-
-
Front Design and Texture & Misc Items
1
-
-
ELECTRIC INSTALLATIONS & SERVICE CONNECTION;
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements