Urban Development Department Tender
... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 39,835Document Cost
₹ 2,000Tender Fee
Refer Documents
Summary
Construction Of Children Park At Santi Para Road -2 Infront Of Gouriya Math In Ward No-02,under 15th Fc Untied 1st Installment For The Year 2020-21
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UDD_42691_1Tender No
LMB.81/15th Fc(1st instl)/2020-21/NIT/2024-25/862 dated - 13/02/2025Tender Authority
Urban Development Department ViewPurchaser Address
-Website
http://assamtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Flowering Tree (A) Gulmohar / Ashok
80
-
-
... More
For seatting benches.
8
-
-
... More
For Water Fountain
1
-
-
... More
Boundary Wall (Earth work)
-
-
-
... More
1.1Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling...... (A) Up to a depth of 2.00m below the existing ground level. (a) In ordinary soil
27.03
-
-
... More
1.6Supplying and filling sand gravel in foundation trenches of column footings over slushy soil including local carriage of materials within 8 km pumping out of water, ramming etc.............
4.51
-
-
... More
1.7Extra lead per km truck carriage for sand gravel beyond the initial lead of 8 km.
4.51
-
-
... More
P.C.C
-
-
-
... More
2.1.1PLAIN CEMENT CONCRETE WORKS Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc.…. (a) In prop 1cement: 3 sand :6 coarse aggregate by volume
1.78
-
-
... More
R.C.C
-
-
-
... More
2.2.1Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate.…. (I) Using Mixer Machine (A) In substructure up to plinth level Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works ............. N) Without using admixture, plasticiser b) M20 grade concrete or Prop. 1:1.5:3
7.27
-
-
... More
2.2.1Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate.…. (I) Using Mixer Machine (B) In super structure from plinth level up to 1st floor level. ii) Columns, pillars, posts, struts, suspended floor, roof, landing, shelf and support, balcony, lintel, sill band, beam, girder, bressumer, cantilever, staircase.... N) Without using admixture, plasticiser b) M20 grade concrete or Prop. 1:1.5:3
3.82
-
-
... More
Form Work Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc.,
-
-
-
... More
3.1.1.1Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc..…. (a) Using 38mm thick plank
8.32
-
-
... More
3.1.1.2Sides of tie beams, grade beams etc. at or below ground level. (a) Using 38mm thick plank
32.31
-
-
... More
3.1.1.3Columns, Pillars, Posts & Strut (a) Square, Rectangular, polygonal in plan or any shape like Tee/L etc. having plane vertical face (i) Using 38mm thick plank
28.08
-
-
... More
3.1.1.11Arches/ slabs having curved surface in one direction. (Using 38mm thick plank)
20.25
-
-
... More
Brick Work
-
-
-
... More
4.1.1Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level..... (a).Brick on flat soling.
23.68
-
-
... More
4.1.81st class brick nogged wall in cement mortar including racking out joints and curing complete..... (A) 112mm thick brick wall (a) In cement mortar in proportion 1:4. (1 cement:4 sand)
32.94
-
-
... More
Plastering
-
-
-
... More
6.2.215 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level..... A) On rough side b) In cement mortar 1:4
45.18
-
-
... More
6.2.215 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level..... B) On fair side b) In cement mortar 1:4
59.94
-
-
... More
6.3.1Pointing on brick work with cement mortar including curing complete as directed..... A) Cement mortar prop. 1:3 b) In cement mortar 1:4 c) Cut or weather struck pointing
78.12
-
-
... More
Painting
-
-
-
... More
13.9.1SPECIAL WATHER PROOF COLOURING Finishing old / new wall with water proofing weather coat smooth anti-fungal exterior painting of approved make......
112.32
-
-
... More
Reinforcement
-
-
-
... More
18.1.1Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending.....(No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level) a) From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL (i) TMT Corrosion resistant steel (CRS) reiforcement bar
9.08
-
-
... More
Part-B (Based on DSR 2021) Pathways - Earthwork
-
-
-
... More
2.6.1Earth work in excavation by mechanical means(Hydraulic excavator)/manual means… All kinds of soil
100
-
-
... More
2.38Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%)..............
250
-
-
... More
P.C.C
-
-
-
... More
4.1.5PLAIN CEMENT CONCRETE WORKS Providing and laying in position cement concrete of specified grade…. 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
43
-
-
... More
Brick Work
-
-
-
... More
16.12Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
200
-
-
... More
Main Gate (Earthwork)
-
-
-
... More
2.6.1Earth work in excavation by mechanical means(Hydraulic excavator)/manual means… All kinds of soil
4
-
-
... More
2.38Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%)..............
2.65
-
-
... More
P.C.C
-
-
-
... More
4.1.5PLAIN CEMENT CONCRETE WORKS Providing and laying in position cement concrete of specified grade…. 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
1.07
-
-
... More
RCC
-
-
-
... More
5.1.2REINFORCED CEMENT CONCRETE WORKS(UP TO PLINTH) Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement … 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
4
-
-
... More
5.2.2REINFORCED CEMENT CONCRETE WORKS(ABOVE PLINTH) Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc…… 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
1.65
-
-
... More
Form Work Centering and shuttering including strutting, propping etc. and removal of form for
-
-
-
... More
5.9.1Foundations, footings, bases of columns, etc. for mass concrete
4.8
-
-
... More
5.9.6Columns, Pillars, Piers, Abutments, Posts and Struts
10
-
-
... More
5.9.5Lintels, beams, plinth beams, girders, bressumers and cantilevers
14.04
-
-
... More
Reinforcement
-
-
-
... More
5.22.6/ 5.22A6Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding…….. Thermo-Mechanically Treated bars of grade Fe-500D or more.
350
-
-
... More
Brick Work
-
-
-
... More
16.12Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
12.84
-
-
... More
Flooring
-
-
-
... More
11.41.2Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved make..……. Size of Tile 600 x 600 mm
34
-
-
... More
Plastering
-
-
-
... More
13.2.1CEMENT PLASTERING (In Fine Sand) 15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand)
60
-
-
... More
13.31.2POINTING Pointing on brick work or brick flooring with cement mortar 1:3
(1 cement : 3 fine sand): Raised and cut pointing
40
-
-
... More
Painting
-
-
-
... More
13.111.1Finishing walls with Acrylic Smooth exterior paint of required shade :
20
-
-
... More
Part-C (Based on Market Rate) Playing Equipment
-
-
-
... More
GREEN CHILDREN FRP LOOP RUNG
1
-
-
... More
MILD STEEL PLAYGROUND EQUIPMENTS GO ROUND 4 SEATER 5 FT DIA
1
-
-
... More
TWO SEATER SEE SAW
2
-
-
... More
OUTDOOR ARC PLAYGROUND DOME CLIMBER
2
-
-
... More
RED SPIRAL OUTDOOR FRP PLAYGROUND SLIDE FOR GARDEN AGE 3-10
2
-
-
... More
OUTDOOR DOUBLE SWING
2
-
-
... More
STRAIGHT OUTDOOR FRP SLIDE, FOR PLAYGROUND, GARDEN AGE 12
1
-
-
... More
OUTDOOR PLAYGROUND EQUIPMENT
1
-
-
... More
FRP KIDS PLAYGROUND MULTIPLAY EQUIPMENTS
1
-
-
... More
External Electrification
-
-
-
... More
Supply, installation,testing and commissioning of 15W LED integrated type solar lighting system including PCC foundation, pole etc. complete(Onergy or equivalent make and as per approval of MNRE).
6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%