Soil Conservation Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Soil Conservation Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date2 Feb 2024
Closing Date16 Feb 2024
Tender Amount₹ 24,76,400 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing. Above GBL

324.8

-

134.47

... More
Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing. Below GBL

63.92

-

196.35

... More
Plain/reinforced cement concrete 1:2.5:5 nominal mix in foundation with crushed stone nominal size mechanically mixed in substructure complete as per drawings and technical specification.

11.81

-

6565.23

... More
Plain/reinforced cement concrete 1:2:4 with crushed stone mechanically mixed in substructure complete as per drawings and technical specification

74.43

-

7877.8

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification

44.66

-

6708.47

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification

338.56

-

154.19

... More
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation.

1127.14

-

107.22

... More
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification

551.2

-

24.63

... More
Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification. Boulder laid dry without wire crates.

39.26

-

1959.69

... More
Providing and laying hand tubewell

1

-

11900

... More
Providing R.C.C. Signboard including writing engrave lettering

1

-

9526

... More
Part-II

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm

0.02

-

55808.98

... More
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.

262.5

-

192.78

... More
Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing. Above GBL

287.14

-

134.47

... More
Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing. Below GBL

54.63

-

196.35

... More
Plain/reinforced cement concrete 1:2.5:5 nominal mix in foundation with crushed stone nominal size mechanically mixed in substructure complete as per drawings and technical specification.

10.28

-

6565.23

... More
Plain/reinforced cement concrete 1:2:4 with crushed stone mechanically mixed in substructure complete as per drawings and technical specification

55.06

-

7877.8

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification

33.04

-

6708.47

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification

205.02

-

154.19

... More
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation.

1331.82

-

107.22

... More
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification

839.52

-

24.63

... More
Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification. Boulder laid dry without wire crates.

33.5

-

1959.69

... More
Providing and laying hand tubewell

1

-

11443.64

... More
Providing R.C.C. Signboard including writing engrave lettering

1

-

9389.98



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.