BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 1,12,010Document Cost
₹ 1,120Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SCD_33783_7Bid Award Id
ViewTender No
Tender/NIT/Pt/2023-24/7212Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing & laying of boulder apron laid in wire crates made with 4mm dia G.I. wire conforming to IS :280 & 4826 in 100 mm X 100 mm Mesh (Weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 25 kg. each.
960
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
600
-
-
... More
Providing Signboard with Marble Plate
1
-
-
... More
Structure-2
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means A) Above GBL and
178.76
-
-
... More
B) Below GBL
102.2
-
-
... More
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
3.4
-
-
... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
26.28
-
-
... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
15.77
-
-
... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
61.18
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
376.01
-
-
... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
8.85
-
-
... More
Suppying, fitting and fixing iron pipe for foot bridge railing
22.4
-
-
... More
Providing Signboard inscribe in Marble/ Tiles
1
-
-
... More
Structure-3
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means A) Above GBL and
178.76
-
-
... More
B) Below GBL
102.2
-
-
... More
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
3.4
-
-
... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
26.28
-
-
... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
15.77
-
-
... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
61.18
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
376.01
-
-
... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
8.85
-
-
... More
Suppying, fitting and fixing iron pipe for foot bridge railing
22.4
-
-
... More
Supplying, Fitting and Fixing Hand Tube Well
1
-
-
... More
Providing Signboard inscribe in Marble/ Tiles
1
-
-
... More
Structure-4
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
406.8
-
-
... More
Providing soling in foundation and under floor with stone/best quality picked jhama brick, sand packed and laid to level and in panel after Brick on flat soling as specified.
314.4
-
-
... More
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, place in foundation & compected by vibration including curing etc. complete as directed.
31.44
-
-
... More
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and technical specifications
52.2
-
-
... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
21.07
-
-
... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
23.16
-
-
... More
Cement plastering with cement morter (1:3) on R.C.C. works as per technical specifications.
768
-
-
... More
Cost of R.C.C Signboard including painting, writing, fitting fixing at project site
1
-
-