Soil Conservation Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Soil Conservation Department Tender
Civil And Construction
Eprocure
Opening Date27 Sep 2023
Closing Date16 Oct 2023
Tender Amount₹ 49,76,000
Costs
EMD
₹ 99,520Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SCD_32675_10Bid Award Id
ViewTender No
Tender/NIT/pt/2023-24/6220Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Plain cement concrete 1:2:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
7.28
-
6565.23
... More
RCC works in sub structure complete as per drawing & technical specification and steel shuttering form work.
(Reinforcement to be paid separately)
RCC Grade M25 (a) Height upto 5.00m
Case I : Using Concrete Mixer
56.44
-
9138.66
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
33.86
-
6868.09
... More
Plastering with cement mortar ( 1:3) on R.C.C. works as per technical specifications.
Thickness of plastering : 12 mm
215.45
-
154.19
... More
Providing and laying of filter media with granular material/stone crushed aggregates satisfying the requirement laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600mm with smaller size towards the soil and bigger size toward the Head Wall to the full height compact to a firm condition complete as per drawing and specification.
19.6
-
2158.18
... More
Earthwork in filling front of the guide bund by head load up to of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary.
87.53
-
107.22
... More
Earthwork in filling front of the guide bund by head load up to of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary.
In Periphery Bund ( Both side of the structure)
119.13
-
271.92
... More
Furnishing and laying of the live sods perennial turf forming grass on embankment slope, including preparation of ground, fetching of sods and watering as per Technical Specification.
133.64
-
24.63
... More
Providing and laying boulder apron on gully bed in up stream and down stream of RCC structure for protection against scour with stone boulders weighting not less than 40kg each complete as per drawing & technical specifications.
37.9
-
1959.69
... More
Providing Weep Holes in RCC Head Wall etc. with 100mm dia Ac pipe extending through full width of the structure with slope of IV:20H towards drawing face. Complete as per drawing and technical specification.
8
-
141.85
... More
Construction of diversion channel to flow the water of the propose site.
182
-
192.78
... More
Earthwork in filling the diversion channel after completion of work.
182
-
107.22
... More
Cost of RCC sign board including painting, writing & fitting fixing at project site, complete.
1
-
12912.54
... More
Part - B : RCC Check Dam
-
-
-
... More
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, samplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. as directed
0.02
-
55808.98
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
300.21
-
216.94
... More
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5.04
-
6565.23
... More
RCC works in sub structure complete as per drawing & technical specification and steel shuttering form work.
(Reinforcement to be paid separately)
RCC Grade M25 (a) Height upto 5.00m
Case I : Using Concrete Mixer
41.64
-
9138.66
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
24.98
-
6868.09
... More
Plastering with cement mortar ( 1:3) on R.C.C. works as per technical specifications.
Thickness of plastering : 12 mm
172.18
-
154.19
... More
Providing and laying of filter media with granular material/stone crushed aggregates satisfying the requirement laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600mm with smaller size towards the soil and bigger size toward the Head Wall to the full height compact to a firm condition complete as per drawing and specification.
13.05
-
2158.18
... More
Earthwork in filling in front of the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 66cm and sprinkling with water if necessary.
74.36
-
107.22
... More
Earthwork in filling front of the guide bund by head load up to of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary.
In Periphery Bund ( Both side of the structure)
113.9
-
271.92
... More
Furnishing and laying of the live sods perennial turf forming grass on embankment slope, including preparation of ground, fetching of sods and watering as per Technical Specification.
118.79
-
24.63
... More
Providing and laying boulder apron on gully bed in up stream and down stream of RCC structure for protection against scour with stone boulders weighting not less than 40kg each complete as per drawing & technical specifications.
26.62
-
1959.69
... More
Providing Weep Holes in RCC Head Wall etc. with 100mm dia AC pipe extending through full width of the structure with slope of IV:20H towards drawing face. Complete as per drawing and technical specification.
5
-
141.85
... More
Construction of diversion channel to flow the water of the propose site.
210
-
192.78
... More
Earthwork in filling the diversion channel after completion of work.
210
-
107.22
... More
Cost of RCC sign board including painting, writing & fitting fixing at project sit, complete.
1
-
11957.96
... More
Part - C : Brick Channel
-
-
-
... More
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, samplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. as directed
0.04
-
55808.98
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
458.96
-
216.94
... More
Providing brick soling in earthen shoulder with stone/ best quality jhama brick, sand packed and laid to true line and level and panel after preparing the sub grade including earthwork in excavation as directed including all labour and materials and if necessary dewatering, etc. complete as directed. (a) Brick on flat soling
264.76
-
755.77
... More
Plain cement concre1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation.
26.48
-
6565.23
... More
Brick masonry work in prop. 1:3 in substructure excluding cost of pointing & plastering complete directed.
70.54
-
8660.7
... More
R.C.C. work in proportion 1:2:4: in all walls mixed with crushed stone aggregate 23mm nominal size mechanically mixed & placed in all R.C.C. walls and completed by vibration including necessary shuttering as per technical specification and drawings.
39.57
-
8593.74
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
31.45
-
6868.09
... More
Plastering work with cement mortar in prop. 1:3 on brick work in sub structure as per technical specification complete as directed.
941.41
-
154.19
... More
Cost of RCC sign board including painting, writing & fitting fixing at project sit, complete.
1
-
11956.15
... More
Part - D : Water Harvesting Pond
-
-
-
... More
Clearing and grubbing waste land including uprooting ipomea plants, debris collection, burning and removal of them etc. works completed a directed.
0.11
-
55808.98
... More
Earthwork in excavation of water harvesting tank/ pond by head load with side slope 1:1 including bailing out water below water level and staking the earth around the pond in the form of high bank as per specification mentioned in design etc. completed as directed.
1179.58
-
224.79
... More
Furnishing and laying of the live sods perennial turf forming grass on embankment slope, verges of other location as directed including preparation of ground, fetching of sods and watering into following specification as directed.
506
-
24.63
... More
Planting of trees around the bank of pond (Avenue trees) in 0.60 m dia holes, 1.00 m deep dug in the ground, mixing the soil with decayed farm yard/ sludge manure, planting the saplings, backfilling the tranches, watering, fixing the tree guard and maintaining the plants for one year.
44
-
801.11
... More
Cost of RCC sign board including painting, writing & fitting fixing at project sit, complete.
1
-
11307.61
... More
Part - E : Water Harvesting Pond
-
-
-
... More
Clearing and grubbing waste land including uprooting ipomea plants, debris collection, burning and removal of them etc. works completed a directed.
0.25
-
55808.98
... More
Earthwork in excavation of water harvesting tank/ pond by head load with side slope 1:1 including bailing out water below water level and staking the earth around the pond in the form of high bank as per specification mentioned in design etc. completed as directed.
3316.18
-
224.79
... More
Furnishing and laying of live-sods of perennial turf forming grass on embankment slope, verges of other location as directed including preparation of ground, fetching of sods and watering into following specification as directed.
828
-
24.63
... More
Planting of trees around the bank of pond (Avenue trees) in 0.60 m dia holes, 1.00 m deep dug in the ground, mixing the soil with decayed farm yard/ sludge manure, planting the saplings, backfilling the tranches, watering, fixing the tree guard and maintaining the plants for one year.
61
-
801.11
... More
Cost of RCC sign board including painting, writing & fitting fixing at project sit, complete.
1
-
11308.04