Soil Conservation Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 79,340Document Cost
₹ 800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SCD_42571_2Tender No
No. Tender/NIT/Pt/2024-25/4162Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation for Structure
Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Below GBL
43.82
159
-
... More
Sand Filling in Foundation Fillling in foundation trenches as per drawing and technical specification Clause305.3.9
4.71
1731
-
... More
Plain Cement Concrete
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
9.42
6357
-
... More
RCC Works
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.
58.89
7877
-
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
35.34
6768
-
... More
Plastering of Walls Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications.
91.52
152
-
... More
Guide Bund, coffer bund
Construction of embankment with approved matarial deposited at the site from roadway cutting and excavation from drain and foundation of other structures graded and compacted.
408
178
-
... More
Diversion Channel Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines,grades,levels and dimensions.Excavated materials to be used in embankment with a lift upto 3m and lead of 50m, as per technical specification clause 307.
56.25
192
-
... More
Turfing of Guid bund
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope,including preparation of ground,fetching of sods and watering as per Technical Specification.
312.91
24
-
... More
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.
30.2
1959
-
... More
PERPHEY BUND AT MANIKPUR OF SALCHARAPARA DEV. BLOCK (Part-A)
-
-
-
... More
Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area.(By manual means)
0.13
55808
-
... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.
981.37
271
-
... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
753.19
24
-
... More
Providing fitting fixing of RCC Signboard
1
14570
-
... More
RCC DROP SPILLWAY AT NISCHINTAPUR OF SALCHARAPARA DEV. BLOCK (Part-B)
-
-
-
... More
Site preparation , cleaning and removing of debris etc.
0.02
55808
-
... More
Excavation for Structure
Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Above GBL
95.92
159
-
... More
Excavation for Structure
Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Below GBL
40.34
159
-
... More
Sand Filling in Foundation Fillling in foundation trenches as per drawing and technical specification Clause305.3.9
4.26
1731
-
... More
Plain Cement Concrete
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
8.52
6357
-
... More
RCC Works
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.
54.24
7877
-
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
32.54
6768
-
... More
Plastering of Walls Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications.
89.1
152
-
... More
Guide Bund, coffer bund
Construction of embankment with approved matarial deposited at the site from roadway cutting and excavation from drain and foundation of other structures graded and compacted.
400.4
178
-
... More
Diversion Channel Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines,grades,levels and dimensions.Excavated materials to be used in embankment with a lift upto 3m and lead of 50m, as per technical specification clause 307.
45
192
-
... More
Turfing of Guid bund
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope,including preparation of ground,fetching of sods and watering as per Technical Specification.
312.91
24
-
... More
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.
28.67
1959
-
... More
PERPHEY BUND AT NISCHINTAPUR OF SALCHARAPARA DEV. BLOCK (Part-B)
-
-
-
... More
Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area.(By manual means)
0.11
55808
-
... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.
712.94
271
-
... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
530.07
24
-
... More
Providing fitting fixing of RCC Signboard
1
14570
-
... More
RCC DROP SPILLWAY AT RAKHAL KHALERPAR PT-II OF SALCHARAPARA DEV. BLOCK (Part-C)
-
-
-
... More
Site preparation , cleaning and removing of debris etc.
0.02
55808
-
... More
Excavation for Structure
Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Above GBL
113.36
159
-
... More
Excavation for Structure
Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Below GBL
48.12
159
-
... More
Sand Filling in Foundation Fillling in foundation trenches as per drawing and technical specification Clause305.3.9
5.16
1731
-
... More
Plain Cement Concrete
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
10.32
6357
-
... More
RCC Works
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.
64.61
7877
-
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
38.77
6768
-
... More
Plastering of Walls Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications.
103.25
154
-
... More
Guide Bund, coffer bund
Construction of embankment with approved matarial deposited at the site from roadway cutting and excavation from drain and foundation of other structures graded and compacted.
219.48
178
-
... More
Diversion Channel Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines,grades,levels and dimensions.Excavated materials to be used in embankment with a lift upto 3m and lead of 50m, as per technical specification clause 307.
65.25
192
-
... More
Turfing of Guid bund
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope,including preparation of ground,fetching of sods and watering as per Technical Specification.
312.91
24
-
... More
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.
32.14
1959
-
... More
Providing fitting fixing of RCC Signboard
1
14570
-
... More
PERPHEY BUND AT RAKHAL KHALERPAR PT-II OF SALCHARAPARA DEV. BLOCK (Part-C)
-
-
-
... More
Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area.(By manual means)
0.24
55808
-
... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.
1841.37
271
-
... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
1347.9
24
-
... More
Providing fitting fixing of RCC Signboard
1
14575
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%