BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 1,12,760Document Cost
₹ 1,130Tender Fee
Refer Documents
Summary
Bishnupur Gully Control Project Under Ridf-xxx
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SCD_42252_8Bid Award Id
ViewTender No
Tender/NIT/Pt/2024-25/4052Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in excavation of foundation of structures as per drawing and technical specification clause including setting out construction of shoring and bracing deleterious matter, dressing of sides and bottom and backfilling with approved material.
Above GBL
328.2
134
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification clause including setting out construction of shoring and bracing deleterious matter, dressing of sides and bottom and backfilling with approved material.
Below GBL
163.25
196
-
... More
Plain/reinforced cement concrete 1:2.5:5 nominal mix in foundation with crushed stone nominal size mechanically mixed in substructure complete as per drawings and technical specification.
15.27
6565
-
... More
Plain/reinforced cement concrete 1:2:4 with crushed stone mechanically mixed in substructure complete as per drawings and technical specification
77.06
7877
-
... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification
46.24
6708
-
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification
276.04
154
-
... More
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation.
961.51
107
-
... More
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification
424
24
-
... More
Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification. Boulder laid dry without wire crates.
47.9
1959
-
... More
Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification. Boulder laid dry without wire crates.
32.52
1959
-
... More
Providing and laying hand tubewell
1
11900
-
... More
Providing R.C.C. Signboard including writing engrave lettering
1
9280
-
... More
Dholadonda Gully Control Project
-
-
-
... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm
0.02
55808
-
... More
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
262.5
192
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification clause including setting out construction of shoring and bracing deleterious matter, dressing of sides and bottom and backfilling with approved material.
328.2
134
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification clause including setting out construction of shoring and bracing deleterious matter, dressing of sides and bottom and backfilling with approved material.
Below GBL
163.25
196
-
... More
Plain/reinforced cement concrete 1:2.5:5 nominal mix in foundation with crushed stone nominal size mechanically mixed in substructure complete as per drawings and technical specification.
15.27
6565
-
... More
Plain/reinforced cement concrete 1:2:4 with crushed stone mechanically mixed in substructure complete as per drawings and technical specification
77.06
7877
-
... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification
46.24
6708
-
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification
276.04
154
-
... More
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation.
731.82
107
-
... More
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification
212
24
-
... More
Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification. Boulder laid dry without wire crates.
47.9
1959
-
... More
Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification. Boulder laid dry without wire crates.
32.52
1959
-
... More
Providing and laying hand tubewell
1
11900
-
... More
Providing R.C.C. Signboard including writing engrave lettering
1
9279
-
... More
Chikajhora Gully Control Project
-
-
-
... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm
0.04
55808
-
... More
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
262.5
192
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification clause including setting out construction of shoring and bracing deleterious matter, dressing of sides and bottom and backfilling with approved material.
423.22
134
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification clause including setting out construction of shoring and bracing deleterious matter, dressing of sides and bottom and backfilling with approved material.
Below GBL
347.8
196
-
... More
Plain/reinforced cement concrete 1:2.5:5 nominal mix in foundation with crushed stone nominal size mechanically mixed in substructure complete as per drawings and technical specification.
28.37
6565
-
... More
Plain/reinforced cement concrete 1:2:4 with crushed stone mechanically mixed in substructure complete as per drawings and technical specification
153.78
7877
-
... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification
92.27
6708
-
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification
493.31
154
-
... More
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation.
1066.98
107
-
... More
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification
212
24
-
... More
Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification. Boulder laid dry without wire crates.
91.1
1959
-
... More
Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification. Boulder laid dry without wire crates.
59.82
1959
-
... More
Providing and laying hand tubewell
1
11900
-
... More
Providing R.C.C. Signboard including writing engrave lettering
1
9120
-