Soil Conservation Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Soil Conservation Department Tender
Civil And Construction
Irrigation Work
Water Storage And Supply
Eprocure
Opening Date8 Jul 2024
Closing Date29 Jul 2024
Tender Amount₹ 59,41,147
Costs
EMD
₹ 1,18,823Document Cost
₹ 1,200Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SCD_37893_9Bid Award Id
ViewTender No
Tender/NIT/Pt/2023-24/870Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Earth work in excavation of foundation of struction as per drawing and technical specification including setting out, construction of shorting and bracing, removal of stumps and backfilling the excavated earth i) Above GBL
229.41
-
145.18
Earth work in excavation of foundation of struction as per drawing and technical specification including setting out, construction of shorting and bracing, removal of stumps and backfilling the excavated earth ii) Below GBL
37.04
-
159.46
PCC 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggr. 40mm nominal) size mechanically mixed, place in foundation and completed by vibration including curing for 14 days
4.64
-
6357.1
Plain/Reinforced cement concrete, in open foundation complete as per draweing and technical specification including steel shuttering formwork, curing completed as directed
39.29
-
7877.8
Supplying, fitting and placing MS Bar reinforcement bar primary produce TATA/SAIL/Esser Srteet?Jindal Steel/Shyam Steel/RINL) in foundation complete as per drawing and technical specifications.
23.57
-
6768.72
Plastering with cement mortar (1:3) 15mm thick on brick work in parapet as per technical specification
172.43
-
152.32
Providing and laying of filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504 2.2 of MoRTH specifications to a thickness of not less than 600mm with smaller size surface behind the abutment. Wing wall and Return wall to the full height compacted to form condition complete as per drawing and technical specification
18.64
-
2183.65
Earth work by head load in filling embarkment in layer not exceeding 20cm thick breaking clods, dressing and ramming within a lead upto 30m and lift upto 1.50m including payment of land compensation for obtaining earth from private land or Govt. land as required and 12.5% deduction being made on the quantity thus arrived for shrinkage allowance (Ordinary soil, Basti land, Low marshy land)
566.37
-
121.38
Turfing with Sods (furnishing and laying of the live sods) forming grass on embarkment slope, verges or other locations shown on the drawing or as directed
296.8
-
24.63
Providing and laying boulder apron on river on river bed for protection against scour with stone boulders weighing Not less than 40Kg each complete as per drawing
15.23
-
1959.69
Providing and laying hand tube well L.S.
1
-
14280
Providing RCC Signboard
1
-
14280
B. Distribution Channel project.
-
-
-
Preparation of site including removal of mud & cleaning the jungle etc. complete as directed
0.12
-
55808.98
Earth work in excavation of foundation trenches including filling up the trenches & removal of surplus spoil etc. by manual means (depth up to 3m) without dewatering
1129.61
-
145.18
Providing soling in foundation and under floor with stone/best Jhama brick, sand packed after preparing the sub-grade
751.63
-
755.77
Providing PCC work in foundation with 13mm to 28mm size down graded gravel including curing finishing etc. complete
75.18
-
6357.1
Providing RCC work with pro. 1:2:4 in foundation, abutment of head wall with proper reinforcement as per specification
54.59
-
7877.8
Supplying of reinforcement (TMT) in position to reinforce cement concrete work with wire as per specification
50.45
-
6768.72
Brick masonry work in 1:4 in sub-structure complete excluding pointing and plastering as per technical specification
332.41
-
8406.99
Cement plastering 12mm thick in prop. 1:3 including cleaning the surface & curing etc. complete as directed
2306.5
-
152.32
Providing RCC Signboard engrave lettering
1
-
6386.57
B. Loop cutting.
-
-
-
Earth work in excavation for drainage channel as per drawing and technical specefication, including setting out construction of shoring and brancing, removal of stumps and other deleterious matter, dressing of sides bottom,
292.5
-
145.18