Soil Conservation Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Soil Conservation Department Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date13 Feb 2024
Closing Date22 Feb 2024
Tender Amount₹ 86,41,200 
Notes
Download

Costs

Summary

Borthal Borali Water Harvesting Cum Water Distribution Project Under Ridfxxviii

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

3.22

-

5885.74

... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification clauses 602, 603, 604, 1202 & 1204.

7.04

-

8660.7

... More
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.

0.41

-

67687.2

... More
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.

4.77

-

7370.86

... More
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.

73.6

-

152.32

... More
Misc. expenditure ( Signboard, photography etc.)

1

-

5051.39

... More
Part - B : Brick Canal

-

-

-

... More
Excavation for structures ( earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

94.99

-

159.46

... More
Laying Brick Soling layer on prepared sub- grade with brick on end edging according to lines, graded and cross- section shown on the drawing filling joints with sand and earth and as per the technical specification.

122.4

-

755.77

... More
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

7.09

-

5885.74

... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification clauses 602, 603, 604, 1202 & 1204.

15.62

-

8660.7

... More
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.

0.91

-

67687.2

... More
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.

10.57

-

7370.86

... More
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.

163.2

-

152.32

... More
Misc. expenditure

1

-

2702.52

... More
Part - C : Brick Canal

-

-

-

... More
Excavation for Structures ( earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

102.44

-

159.46

... More
Laying Brick Soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth and as per the technical specification.

132

-

755.77

... More
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

7.7

-

5885.74

... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification clauses 602, 603, 604, 1202 & 1204.

16.84

-

8660.7

... More
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.

0.98

-

67687.2

... More
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.

11.4

-

7370.86

... More
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.

176

-

152.32

... More
Misc. expenditure

1

-

7393.5

... More
Part - D : Brick Canal

-

-

-

... More
Excavation for Structures ( earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

113.61

-

159.46

... More
Laying Brick Soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth and as per the technical specification.

146.4

-

755.77

... More
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

8.54

-

5885.74

... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification clauses 602, 603, 604, 1202 & 1204.

18.68

-

8660.7

... More
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.

1.09

-

67687.2

... More
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.

12.65

-

7370.86

... More
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.

195.2

-

152.32

... More
Misc. expenditure ( Signboard, photography etc.)

1

-

14947.55

... More
Part - E: Water Harvesting Stucture

-

-

-

... More
Earthwork in filling in the guide bund by head load to divert the flow of water as per specification.

64

-

107.22

... More
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5m and lead upto 50m as per technical Specification Clause 302.3 (Manual method should be adopted where machines can not be deployed due to site condition)

114.19

-

144.59

... More
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

2.91

-

5885.74

... More
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.

25.05

-

7370.86

... More
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.

1.5

-

67687.2

... More
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.

82

-

152.32

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per table 1300.1, no fragment weighing less than 25Kg laid dry complete as per drawing and technical specification Clause 1301.

9.47

-

1959.69

... More
Construction of diversion channel to flow the water of the proposed site

60

-

144.59

... More
Earthwork filling for closing the diversion channel after completion of work

60

-

103.41

... More
Construction of approach road for carriage of construction material etc. LS

1

-

17850

... More
Cost of Tube Well including installation LS

1

-

14412.23

... More
Part - F : Water Distribution Canal

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass etc. as per direction.

0.15

-

55808.98

... More
Excavation in cutting in soil by manual means with lead upto 50.00mm and as per technical specification.

1712.81

-

144.59

... More
Laying Brick Soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth and as per the technical specification.

1125

-

755.77

... More
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

225

-

5885.74

... More
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.

265.62

-

7370.86

... More
supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.

25.21

-

67687.2

... More
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.

2625

-

152.32

... More
Providing & laying RCC sign board with engrave lettering.

1

-

11900

... More
Construction of Temporary Camp Hut for Store the materials etc.

1

-

11900

... More
Miscellaneous Expenditure (Local carriage of Material etc.)

1

-

14255.44



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.