Soil Conservation Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Soil Conservation Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date12 Jan 2024
Closing Date29 Jan 2024
Tender Amount₹ 45,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reinforced cement concrete work in ..... excluding the cost of centering, shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).in super structure

31.8

-

12755.97

... More
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams

132.1

-

723.94

... More
Centering and shuttering including strutting, propping etc. and removal of form for girders, bressumers and cantilevers

342

-

957.06

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.

3121.1

-

106.68

... More
5.22.1 Mild steel and Medium Tensile steel bars

971.52

-

105.85

... More
Brick work with common burnt clay machine moulded perforated bricksof class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) :6.3.2 With modular bricks

40.61

-

9299.43

... More
15 mm cement plaster on the rough side of single or half brick wall of mix : 13.2.1 1:4 (1 cement: 4 fine sand)

648

-

404.24

... More
62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarsesand : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate, 6mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacture’s specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.

6.88

-

1105.09

... More
Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete

5.63

-

2571.83

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.10.25.2 In gratings, frames, guard bar, ladder, railings, brackets,gates and similar works

2250

-

169.34

... More
Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour

648

-

138.1

... More
PLANTATION: Fabricating , supply & fixing of MS Circular tree guard of 75 cm dia and 120 cm , height (above GL), MS tree guard made with 3 No 25 x 25 x 5 mm MS angle iron 150 cm long fixed vertically and 3 Nos 20 x 5 mm MS flat fixed circumferentially around MS angle, with support of MS angle and flat 13 gauge MS wire mesh welded in square grid pattern with an opening of 2'' x 2''.

64

-

4355.4

... More
Plantation of trees and their maintenance for one year (Planting of trees by the road side (Avenue trees) in 0.60m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering, fixing the tree guatrd and maintaining the plants for one year.

64

-

1391.11

... More
Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge.

4382

-

302.2

... More
Cost of RCC Sign Board including painting , writing & fitting fixing at project sit, complete

1

-

12792.14



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.