Soil Conservation Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Soil Conservation Department Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date20 Dec 2024
Closing Date9 Jan 2025
Tender Amount₹ 34,80,375 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Plain Cement Concrete Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

5.97

6565

-

... More
RCC Works RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.

43.81

9138

-

... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.

26.29

6868

-

... More
Plastering of Walls Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications.

159.19

154

-

... More
Filter Media Providing and laying of filter media with granular material/stone crushed aggregates satisfying the requirment .

13.75

2158

-

... More
EarthFilling Earth Work in filling in front of the guid bund by head load upto lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. In Stucture

55.01

107

-

... More
EarthFilling Earth Work in filling in front of the guid bund by head load upto lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. In Periphery bund

1426.63

271

-

... More
Turfing of Guid bund Furnishing and laying of the live sods of perennial turf forming grass on embankment slope,including preparation of ground,fetching of sods and watering as per Technical Specification.

1679.38

24

-

... More
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.

30.66

1959

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally)including10per centextrafor lapsandjointslaidwith stone bouldersweighing not less than 25 kg each as per drawing and technical specifications

72

2928

-

... More
Weep Hole Providing Weep Holes in RCC Head Wall etc. with 100mm dia AC pipe extending through full width of the structure with slope of IV:20H towards drawing face.

10

141

-

... More
Construction of diversion channel to flow the water of the propose site

239.25

192

-

... More
Earthwork in filling the diversion channel after completion of work.

239.25

107

-

... More
PART-B Box Culvert

-

-

-

... More
Site clearance and Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material

0.02

55808

-

... More
Excavation for Structure Earthwork in excavation of foundation trenches including filling upthe trenchers & removal of surplus spoil after completion of foundation work, ramming, dressing of sides and bottom etc. as directed and specified

118.51

145

-

... More
Providing soling in foundation and under floor with stone/best jhama brick, sandpacked after preparing the subgrade.

97.4

755

-

... More
Plain Cement Concrete Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

12.18

6357

-

... More
RCC Works RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.

71.18

7877

-

... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.

60.71

6752

-

... More
Cement plastering 12 mm. thick in proper 1:3 including cleaning the surface & curing etc. complete as directed.

216.13

152

-

... More
Earth work by head load in filling embankment in layers not exceeding 20cm thick including breaking clods, dressing and sectioning, cambering and ramming, within a lead up to 30 m and lift up to 1.5m etc.

1036

271

-

... More
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.

8.18

1959

-

... More
Providing and laying hand tubewell

1

15424

-

... More
Part-C Field Bund

-

-

-

... More
Site clearance and Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material

0.1

55808

-

... More
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate includingpayment of land compensation

1679.99

271

-

... More
Turfing: Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other location etc as per directed.

1286.93

24

-

... More
Part-D Sign Board

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved materials.

0.3

145

-

... More
PCC 1:3:6 in foundation

0.03

6357

-

... More
RCC in substructure complete as per drawing and technical specification and steel shuttering formwork,curing completed as directed.

0.28

7877

-

... More
Supplying,fitting and placing TMT bar reinforcement.

0.27

6752

-

... More
Brickwork with cement mortar(1:4),15 mm thick on brickwork in substructure

3.66

152

-

... More
Providing,fitting& fixing of granite plate including engraving letter writing.

1

8175

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.