Soil Conservation Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 69,608Document Cost
₹ 700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SCD_41508_12Bid Award Id
ViewTender No
Tender/NIT/Pt/2024-25/3644Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Plain Cement Concrete
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5.97
6565
-
... More
RCC Works
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.
43.81
9138
-
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
26.29
6868
-
... More
Plastering of Walls Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications.
159.19
154
-
... More
Filter Media Providing and laying of filter media with granular material/stone crushed aggregates satisfying the requirment .
13.75
2158
-
... More
EarthFilling
Earth Work in filling in front of the guid bund by head load upto lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. In Stucture
55.01
107
-
... More
EarthFilling
Earth Work in filling in front of the guid bund by head load upto lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. In Periphery bund
1426.63
271
-
... More
Turfing of Guid bund
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope,including preparation of ground,fetching of sods and watering as per Technical Specification.
1679.38
24
-
... More
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.
30.66
1959
-
... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally)including10per centextrafor lapsandjointslaidwith stone bouldersweighing not less than 25 kg each as per drawing and technical specifications
72
2928
-
... More
Weep Hole
Providing Weep Holes in RCC Head Wall etc. with 100mm dia AC pipe extending through full width of the structure with slope of IV:20H towards drawing face.
10
141
-
... More
Construction of diversion channel to flow the water of the propose site
239.25
192
-
... More
Earthwork in filling the diversion channel after completion of work.
239.25
107
-
... More
PART-B Box Culvert
-
-
-
... More
Site clearance and Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material
0.02
55808
-
... More
Excavation for Structure
Earthwork in excavation of foundation trenches including filling upthe trenchers & removal of surplus spoil after completion of foundation work, ramming, dressing of sides and bottom etc. as directed and specified
118.51
145
-
... More
Providing soling in foundation and under floor with stone/best jhama brick, sandpacked after preparing the subgrade.
97.4
755
-
... More
Plain Cement Concrete
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.18
6357
-
... More
RCC Works
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.
71.18
7877
-
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
60.71
6752
-
... More
Cement plastering 12 mm. thick in proper 1:3 including cleaning the surface & curing etc. complete as directed.
216.13
152
-
... More
Earth work by head load in filling embankment in layers not exceeding 20cm thick including breaking clods, dressing and sectioning, cambering and ramming, within a lead up to 30 m and lift up to 1.5m etc.
1036
271
-
... More
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.
8.18
1959
-
... More
Providing and laying hand tubewell
1
15424
-
... More
Part-C Field Bund
-
-
-
... More
Site clearance and Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material
0.1
55808
-
... More
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate includingpayment of land compensation
1679.99
271
-
... More
Turfing: Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other location etc as per directed.
1286.93
24
-
... More
Part-D Sign Board
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved materials.
0.3
145
-
... More
PCC 1:3:6 in foundation
0.03
6357
-
... More
RCC in substructure complete as per drawing and technical specification and steel shuttering formwork,curing completed as directed.
0.28
7877
-
... More
Supplying,fitting and placing TMT bar reinforcement.
0.27
6752
-
... More
Brickwork with cement mortar(1:4),15 mm thick on brickwork in substructure
3.66
152
-
... More
Providing,fitting& fixing of granite plate including engraving letter writing.
1
8175
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements