Soil Conservation Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Soil Conservation Department Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date14 Feb 2024
Closing Date6 Mar 2024
Tender Amount₹ 69,45,210 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth Work in filling for coffer dam

192.5

-

271.92

... More
Earth work in excavation of foundation for structures as per drawing & technical specification. (A) Above GBL

126.9

-

145.18

... More
Earth work in excavation of foundation for structures as per drawing & technical specification. (B) Below GBL

106.35

-

159.46

... More
PCC work in proportion 1:3:6

9.47

-

7469.27

... More
RCC work in proportion 1:2:4

78.45

-

9138.66

... More
Supplying fitting fixing of TMT reinforcement

47.07

-

7438.21

... More
Providing weep wholes in RCC Head Wall etc. with 100 mm dia AC pipe

14

-

141.85

... More
Providing and lying of filter media with granular material/stone

25.5

-

2183.7

... More
Cement plastering

211.86

-

154.19

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope

237.43

-

271.91

... More
Providing and laying boulder apron on gully bed in up-stream and down-stream of R.C.C. structure for protection against scour with stone boulders weighing not less than 40 Kg

31.42

-

1959.69

... More
Earthwork in filling for closing the diversion channel

393.75

-

271.91

... More
Earth work in excavation of foundation of structure as per drawing and technical specification

21

-

159.46

... More
Providing and laying boulder apron laid in wire crates maid with 4 mm as per drawing and technical specification

38

-

2928.23

... More
GI pipe 50 mm dia for use of railing for foot bridge

42.8

-

535.5

... More
Construction of embankment with approved material as per Technical Specification

2057.65

-

271.91

... More
Providing fitting & fixing 1 No. RCC Signboard at the project site

1

-

12506.95

... More
R.C.C. Check Dam (No. 2)

-

-

-

... More
Site preparation

0.14

-

55808.62

... More
Earth work for excavation in ordinary soil for diversion channel as per drawing and technical specification including dewatering of water etc

450

-

192.78

... More
Earth Work in filling for coffer dam

192.5

-

271.91

... More
Earth work in excavation of foundation for structures as per drawing & technical specification. (A) Above GBL

126.9

-

145.18

... More
Earth work in excavation of foundation for structures as per drawing & technical specification. (B) Below GBL

106.35

-

159.46

... More
PCC work in proportion 1:3:6

9.47

-

7469.27

... More
RCC work in proportion 1:2:4

78.45

-

9138.66

... More
Supplying fitting fixing of TMT reinforcement

47.07

-

7438.21

... More
Providing weep wholes in RCC Head Wall etc. with 100 mm dia AC pipe

14

-

141.85

... More
Providing and lying of filter media with granular material/stone

25.5

-

2183.65

... More
Cement plastering

211.86

-

154.19

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope

237.43

-

271.91

... More
Providing and laying boulder apron on gully bed in up-stream and down-stream of R.C.C. structure for protection against scour with stone boulders weighing not less than 40 Kg

31.42

-

1959.69

... More
Earthwork in filling for closing the diversion channel

393.75

-

271.91

... More
Earth work in excavation of foundation of structure as per drawing and technical specification

21

-

159.46

... More
Providing and laying boulder apron laid in wire crates maid with 4 mm as per drawing and technical specification

47.5

-

2928.23

... More
GI pipe 50 mm dia for use of railing for foot bridge

42.8

-

535.5

... More
Construction of embankment with approved material as per Technical Specification

2057.65

-

271.91

... More
Providing fitting & fixing 1 No. RCC Signboard at the project site

1

-

9705.11

... More
Brick Canal

-

-

-

... More
Earthwork in excavation for foundation trenches of walk, retaining walls, footings

107.03

-

144.58

... More
Providing brick soiling on foundation and under floor at all levels, with stone best quality packed jhama brick and packed and laid to level and in panel after preparing the sub-grade as directed including all labours and materials completed.

628.17

-

755.77

... More
Plain cement concrete wire with coarse aggregate of size 13mm to 32mm to foundation bed for footing wall including dewatering as directed in prop. 1:6

7.32

-

7469.27

... More
Brick work in cement mortar in sub-structure complete excluding __ as per drawing & technical specification

81.28

-

8660.7

... More
Reinforced cement concrete, in sub structure complete drawing and technical specification and steel shuttering formwork , curing completed as directed, RCC Grade M20. Height upto 5m using concrete mixture

30.59

-

9138.6

... More
Supplying , fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and technical specifications

18.35

-

7438.21

... More
PCC 1:3:6 Foundation ( Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing

42.79

-

7469.27

... More
15mm thick cement plaster in single coat in fair side of brick /Conc. Walls for interior plastering. @ In prop. : 1.4

1491.45

-

154.19



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.