BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 1,11,979Document Cost
₹ 1,120Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SCD_37893_11Bid Award Id
ViewTender No
Tender/NIT/Pt/2023-24/870Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
10.2
-
-
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
113.23
-
-
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
67.94
-
-
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
276.96
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
816.6
-
-
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
31.6
-
-
Providing R.C.C Signboard including painting, writing, fitting fixing at project site
1
-
-
Structure-2
-
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means A) Above G.B.L.
416
-
-
B) Below G.B.L.
164.7
-
-
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
9.27
-
-
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
78.26
-
-
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
46.96
-
-
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
213.8
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
1731.86
-
-
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
27.62
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
15.84
-
-
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
0.64
-
-
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
9
-
-
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
5.4
-
-
Providing R.C.C Signboard including painting, writing, fitting fixing at project site
1
-
-
Structure-3
-
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means A) Above G.B.L.
427.25
-
-
B) Below G.B.L.
142.34
-
-
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
8.17
-
-
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
79.79
-
-
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
47.87
-
-
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
241.43
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
233.07
-
-
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
23.57
-
-
Suppying, fitting and fixing iron pipe for foot bridge railing
42.4
-
-
Providing R.C.C Signboard including painting, writing, fitting fixing at project site
1
-
-
Structure-4
-
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means A) Above G.B.L.
427.25
-
-
B) Below G.B.L.
142.34
-
-
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
8.17
-
-
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
72.06
-
-
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
43.24
-
-
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
201.94
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
233.07
-
-
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
23.57
-
-
Providing R.C.C Signboard including painting, writing, fitting fixing at project site
1
-
-