Soil Conservation Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 1,99,162Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SCD_35042_5Tender No
Tender/NIT/Pt/2023-24/8126Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
E/w in filling for const. of coffer dam
157.5
-
121.38
E/w in excavation of foundation of structures
191.6
-
145.18
E/w in excavation for structures (BELOW GBL)
97.25
-
159.46
PCC 1:3:6 normal mix in Foundation
12.97
-
6357.1
Plain/Reinforced cement concrete.
84.41
-
7877.8
Supplying, fitting and placing TMT bar
50.64
-
6768.72
Plastering with cement mortar (1:3 )
309.51
-
152.32
Providing & laying of Filter media
28.22
-
2183.65
Earth work by head load in filling embankment
990.01
-
121.38
Providing and laying boulders apron
24.38
-
1959.69
Providing sign board
1
-
14280
Providing and laying hand tubewell
1
-
13239.94
Gully Control Structure
-
-
-
Clearing & grubbing road land, grass.
1
-
2380
Construction of diversion channel.
150
-
192.78
E/w in filling for const. of coffer dam
68.25
-
121.38
E/w in excavation of foundation of structures
207.6
-
145.18
E/w in excavation for structures (BELOW GBL)
62
-
159.46
PCC 1:3:6 normal mix in Foundation
10.14
-
6357.1
Plain/Reinforced cement concrete.
63.84
-
7877.8
Supplying, fitting and placing TMT bar
38.31
-
6768.72
Plastering with cement mortar (1:3 )
239.61
-
152.32
Providing & laying of Filter media
23.34
-
2183.65
Earth work by head load in filling embankment
284.12
-
121.38
Providing and laying boulders apron
31.64
-
1959.69
Providing sign board
1
-
14280
Providing and laying hand tubewell
1
-
14000.12
Brick Canal
-
-
-
Preparation of site removal of mud & jungle
0.15
-
55808.98
Earth work in excavation of foundation trenches including filling up
1392.58
-
145.18
Providing soling in foundation & under floor with stone/jhama brick,
872.52
-
755.77
Providing PCC work in Foundation
87.25
-
6357.1
Providing RCC work with prop 1:2:4 in foundation
66.33
-
7877.8
Supplying of reinforcement TMT in position
61.37
-
6768.72
Brick masonry work in 1:3 un sub structure
351.18
-
8406.99
Cement plastering 12mm thick in proper 1:3
2844.45
-
152.32
Boulder Sausages
-
-
-
Excavation for Structures E/w in foundation
70.88
-
159.46
Providing and laying of boulder
151.88
-
2928.23
Cost. of Haulage & loading & unloading of boulder
151.88
-
1424.9
Earthen Embankment
-
-
-
Clearing & grubbing surface drain including rank vegetation, grass bushes, shrub, sapling etc.
0.33
-
55808.98
Const. of embankment with approved material obtained from borrow pits with a lift upto 1.5m
3112.37
-
271.92
Turfing with sods furnishing and laying of the live sods of perneial turf forming grass
2120
-
24.63
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements