Soil Conservation Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 1,99,162Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SCD_35042_5Tender No
Tender/NIT/Pt/2023-24/8126Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
E/w in filling for const. of coffer dam
157.5
-
121.38
... More
E/w in excavation of foundation of structures
191.6
-
145.18
... More
E/w in excavation for structures (BELOW GBL)
97.25
-
159.46
... More
PCC 1:3:6 normal mix in Foundation
12.97
-
6357.1
... More
Plain/Reinforced cement concrete.
84.41
-
7877.8
... More
Supplying, fitting and placing TMT bar
50.64
-
6768.72
... More
Plastering with cement mortar (1:3 )
309.51
-
152.32
... More
Providing & laying of Filter media
28.22
-
2183.65
... More
Earth work by head load in filling embankment
990.01
-
121.38
... More
Providing and laying boulders apron
24.38
-
1959.69
... More
Providing sign board
1
-
14280
... More
Providing and laying hand tubewell
1
-
13239.94
... More
Gully Control Structure
-
-
-
... More
Clearing & grubbing road land, grass.
1
-
2380
... More
Construction of diversion channel.
150
-
192.78
... More
E/w in filling for const. of coffer dam
68.25
-
121.38
... More
E/w in excavation of foundation of structures
207.6
-
145.18
... More
E/w in excavation for structures (BELOW GBL)
62
-
159.46
... More
PCC 1:3:6 normal mix in Foundation
10.14
-
6357.1
... More
Plain/Reinforced cement concrete.
63.84
-
7877.8
... More
Supplying, fitting and placing TMT bar
38.31
-
6768.72
... More
Plastering with cement mortar (1:3 )
239.61
-
152.32
... More
Providing & laying of Filter media
23.34
-
2183.65
... More
Earth work by head load in filling embankment
284.12
-
121.38
... More
Providing and laying boulders apron
31.64
-
1959.69
... More
Providing sign board
1
-
14280
... More
Providing and laying hand tubewell
1
-
14000.12
... More
Brick Canal
-
-
-
... More
Preparation of site removal of mud & jungle
0.15
-
55808.98
... More
Earth work in excavation of foundation trenches including filling up
1392.58
-
145.18
... More
Providing soling in foundation & under floor with stone/jhama brick,
872.52
-
755.77
... More
Providing PCC work in Foundation
87.25
-
6357.1
... More
Providing RCC work with prop 1:2:4 in foundation
66.33
-
7877.8
... More
Supplying of reinforcement TMT in position
61.37
-
6768.72
... More
Brick masonry work in 1:3 un sub structure
351.18
-
8406.99
... More
Cement plastering 12mm thick in proper 1:3
2844.45
-
152.32
... More
Boulder Sausages
-
-
-
... More
Excavation for Structures E/w in foundation
70.88
-
159.46
... More
Providing and laying of boulder
151.88
-
2928.23
... More
Cost. of Haulage & loading & unloading of boulder
151.88
-
1424.9
... More
Earthen Embankment
-
-
-
... More
Clearing & grubbing surface drain including rank vegetation, grass bushes, shrub, sapling etc.
0.33
-
55808.98
... More
Const. of embankment with approved material obtained from borrow pits with a lift upto 1.5m
3112.37
-
271.92
... More
Turfing with sods furnishing and laying of the live sods of perneial turf forming grass
2120
-
24.63
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements