Soil Conservation Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Soil Conservation Department Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date29 Dec 2023
Closing DateCancelled
Tender Amount₹ 99,58,123 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
E/w in filling for const. of coffer dam

157.5

-

121.38

... More
E/w in excavation of foundation of structures

191.6

-

145.18

... More
E/w in excavation for structures (BELOW GBL)

97.25

-

159.46

... More
PCC 1:3:6 normal mix in Foundation

12.97

-

6357.1

... More
Plain/Reinforced cement concrete.

84.41

-

7877.8

... More
Supplying, fitting and placing TMT bar

50.64

-

6768.72

... More
Plastering with cement mortar (1:3 )

309.51

-

152.32

... More
Providing & laying of Filter media

28.22

-

2183.65

... More
Earth work by head load in filling embankment

990.01

-

121.38

... More
Providing and laying boulders apron

24.38

-

1959.69

... More
Providing sign board

1

-

14280

... More
Providing and laying hand tubewell

1

-

13239.94

... More
Gully Control Structure

-

-

-

... More
Clearing & grubbing road land, grass.

1

-

2380

... More
Construction of diversion channel.

150

-

192.78

... More
E/w in filling for const. of coffer dam

68.25

-

121.38

... More
E/w in excavation of foundation of structures

207.6

-

145.18

... More
E/w in excavation for structures (BELOW GBL)

62

-

159.46

... More
PCC 1:3:6 normal mix in Foundation

10.14

-

6357.1

... More
Plain/Reinforced cement concrete.

63.84

-

7877.8

... More
Supplying, fitting and placing TMT bar

38.31

-

6768.72

... More
Plastering with cement mortar (1:3 )

239.61

-

152.32

... More
Providing & laying of Filter media

23.34

-

2183.65

... More
Earth work by head load in filling embankment

284.12

-

121.38

... More
Providing and laying boulders apron

31.64

-

1959.69

... More
Providing sign board

1

-

14280

... More
Providing and laying hand tubewell

1

-

14000.12

... More
Brick Canal

-

-

-

... More
Preparation of site removal of mud & jungle

0.15

-

55808.98

... More
Earth work in excavation of foundation trenches including filling up

1392.58

-

145.18

... More
Providing soling in foundation & under floor with stone/jhama brick,

872.52

-

755.77

... More
Providing PCC work in Foundation

87.25

-

6357.1

... More
Providing RCC work with prop 1:2:4 in foundation

66.33

-

7877.8

... More
Supplying of reinforcement TMT in position

61.37

-

6768.72

... More
Brick masonry work in 1:3 un sub structure

351.18

-

8406.99

... More
Cement plastering 12mm thick in proper 1:3

2844.45

-

152.32

... More
Boulder Sausages

-

-

-

... More
Excavation for Structures E/w in foundation

70.88

-

159.46

... More
Providing and laying of boulder

151.88

-

2928.23

... More
Cost. of Haulage & loading & unloading of boulder

151.88

-

1424.9

... More
Earthen Embankment

-

-

-

... More
Clearing & grubbing surface drain including rank vegetation, grass bushes, shrub, sapling etc.

0.33

-

55808.98

... More
Const. of embankment with approved material obtained from borrow pits with a lift upto 1.5m

3112.37

-

271.92

... More
Turfing with sods furnishing and laying of the live sods of perneial turf forming grass

2120

-

24.63



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.