Purba Bharati Gas Private Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Purba Bharati Gas Private Limited - PBGPL Tender

Services
Civil And Architectural Services
Eprocure
Opening Date20 Sep 2024
Closing Date21 Oct 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Tender For Hiring Services For Route Survey, Permission Acquisition And Soil Investigation In Cachar, Hailakandi And Karimganj Ga (ga9.02)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
DETAILED SURVEY FOR PIPELINE

-

-

-

... More
Carrying out detailed pipeline route survey and all associated works along the pipeline route including Centreline Survey, Detailed Route Survey, Crossing survey (minor) , Collection of population density data, permanent monuments along the pipeline route, collection of all data, submission of Alignment sheet, providing all manpower, tools, tackles, materials, equipment's and other support, facilities (including mobilization and demobilization as required) necessary for the work, in accordance with requirement of Scope of Work document no. (P161-SOW-P001) and in compliance Specification for Topographic Survey (Annexure) enclosed with the tender document and as per instructions of the COMPANY ’s Representative including meeting all responsibilities and furnishing all documents for survey. Note: All drawings shall be generated in coordinates.

50

-

-

... More
ACQUISITION OF ROU

-

-

-

... More
PROVIDING SERVICES TO COMPETENT AUTHORITIES AS PER P&MP ACT 1962 UP TO ISSUE OF 6(1) NOTIFICATION Providing Services to Competent Authorities (CA's) for establishing Right of Users (ROU) of land as per P&MP Act 1962, for laying of pipeline including follow up for 3(1) Gazette notification, facilitating in preparation of Erratum, Addendum & Corrigendum (if required), facilitating in preparation & serving of 3(1) notices, carrying out joint measurement survey, facilitating completion of 5 (1) hearing & assisting CA in disposal of objections, preparation of schedule for 6(1) notification, additional 6(1) schedule, facilitating in preparation of Erratum, Addendum & Corrigendum (if required), entry of Gazette notification in village records, submission of 6(1) notification to MOP&NG ,follow up and publication of notification in the Gazette, obtaining approvals for all Govt Lands and Corporate body land etc and completion of all other items as per details of scope of work of the tender document. Note: Scope shall cover all work for ROU acquisition including all permissions.

5

-

-

... More
PROVIDING SERVICES TO COMPETENT AUTHORITIES AS PER P&MP ACT 1962 UP TO ISSUE OF 6(1) NOTIFICATION TILL OPENING OF ROU Providing Services to Competent Authorities (CA's) as per P&MP Act 1962 for all activities subsequent to publication of 6(1) notifications till completion of awards by Competent Authority including providing services related to opening of Total Right of Use (ROU) to the pipeline laying Agency / Agencies complete in all respects (free of objections, resistance, hazard etc.) including entry of final ROU details in relevant revenue records, inclusive of all labour, material, equipment etc. so that the pipe laying job can be progressed smoothly, as per details of scope of work of the tender document. Note: Scope shall cover all work for opening of ROU for construction purpose.

5

-

-

... More
ACQUISITION OF PERMANENT LAND (SV's, TERMINALS, CNG STATIONS & MOTHER STATIONS/ CGS)

-

-

-

... More
Providing Services for permanent acquisition of land for SV Stations, Terminals and Re-route infrastructure etc. by ascertaining the pattadars and occupiers with concerned office and land records, finalisation of compensation, obtain consent of the pattadars and occupiers, facilitating in execution of Agreement to sale, obtaining sale purchase permission from authority(s), facilitating in registration of sale deed till submission of application for mutation as per details of scope of work of the tender document. Note: In case of change in Plot size rate will be considered pro rata basis. Note: Value of Land shall be paid by the owner.

-

-

-

... More
Plot 1 for DRS/DCU station (30M X 25M)

4500

-

-

... More
Plot 2 for CNG station (60M X 40M)

4800

-

-

... More
Plot 3 for Mother Station (60M X 60M)

7200

-

-

... More
AREA SURVEY (FOR MDPE NETWORK)

-

-

-

... More
Area Survey of MDPE Network to carry out Area Survey and propose feasible route for laying the proposed pipeline network and to indentify and record all the features of the area surveyed along with building, structures, drains pavements, roads etc. and including those likely to have bearing on alignment of proposed pipeline and to propose a pipeline route with respect to boundary giving forest from the nearest boundary which will have least obstruction, marking obstruction, if any, indentify the type of building type of road back lanes required to be cut to lay the pipelines, all the field data to be collected, superimposing the same on digitized satellite high resolution image (as mentioned in item no. ) and developing the drawings/ maps in scale 1:250 with full details marked, check and confirm completeness of data all complete as per specifications drawings and direction of the Engineer-in-Charge and giving drawings in 4 copies along with original editable CAD output including all data.

50

-

-

... More
PERMISSIONS

-

-

-

... More
Preparing the map for applying and Obtaining of permission from Municpal corporation, Gram Panchayat or various land owning authorities using Google map or secondary maps or survey maps or crossing maps as applicable ( With authorisation from concerned agency) and submission to concerned land owning agencies in the required format and /or uploading in the website as required for applying of permission and submitting 4 copies of the applied permission drawings along with soft editable copies and CAD output on CD to COMPANY/PMC. All liasioning works for applying and obtaining secondary maps is included in this item. Note: 1. Payment will be made for the final approved route for which application has been made to the land agencies. 2. Item covers all works towards successful receipt of Permision for Laying & OFC and stations from Concerned authorities & Land owners. 3. Number of permissions in terms of roads, i.e. if a certain no. of roads fall under the same jurisdriction, it will be treated as only 1 (one) permission. Bidder to quote accordingly.

-

-

-

... More
NATIONAL HIGHWAY / EXPRESSWAY CROSSING Obtaining approval/ permissions from appropriate respective State /National and other authorities for the Gas pipeline crossings across National Highways etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document.

10

-

-

... More
ALONG WITH NATIONAL HIGHWAY (IN ROU OF HIGHWAY) Obtaining NOC from appropriate authority for laying pipeline & OFC parallel to National Highway/Express Highway , as per detailed scope of work of the tender document.

10

-

-

... More
RAILWAY CROSSING Obtaining approval/permissions from Railway Authorities and any other authorities for the Gas pipeline crossings across Railways etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document.

10

-

-

... More
ALONG THE RAILWAYS (IN ROU OF RAILWAY) Obtaining NOC from appropriate authority for laying pipeline & OFC parallel to Railway, as per detailed scope of work of the tender document.

1

-

-

... More
STATE HIGHWAY, CROSSING Obtaining approval/permissions from appropriate respective State and other authorities for the Gas pipeline crossings across various State Highways, PWD Roads etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document.

10

-

-

... More
ALONG THE STATE HIGHWAY/PWD ROAD/OTHER ROAD/CANAL (IN ROU OF SH/PWD ROAD/OTHER ROADS/CANAL) Obtaining NOC from appropriate authority for laying pipeline & OFC parallel to State Highway/ Other Road/ Canal , as per detailed scope of work of the tender document.

10

-

-

... More
RIVER CROSSINGS Obtaining approval/permissions from appropriate respective State /National and other authorities for the Gas pipeline crossings across Rivers etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document.

4

-

-

... More
OTHER PIPELINE AND UTILITIES Obtaining approval/permissions from appropriate authorities for the Gas pipeline crossings across various other pipeline and utilities etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document.

10

-

-

... More
FOREST CROSSING PERMISSION SOCIAL FOREST (PER DIVISION) Obtaining approval/permissions/NOC from appropriate respective State /National and other authorities for the Gas pipeline crossings across the Forests land & Wildlife applicable for both pipeline and OFC ,as per details of scope of work of the tender document. Any survey (DGPS, etc.) if required by the Forest Department the same to be done by the vendor and no extra payment would be done for the same.

2

-

-

... More
FOREST CROSSING PERMISSION PROTECTED AND RESERVED FOREST (PER DIVISION) Obtaining approval/permissions/NOC from appropriate respective State /National and other authorities for the Gas pipeline crossings across the Protected and Reserved forest land & Wildlife applicable for both pipeline and OFC ,as per details of scope of work of the tender document. Forest Approvals, includes proposed reserved forest/protected / reserved / sanctuary etc. all complete. Any survey (DGPS, etc.) if required by the Forest Department the same to be done by the vendor and no extra payment would be done for the same.

2

-

-

... More
MDR/ODR, MUNICIPALITY ROAD & OTHER ROADS, CROSSING Obtaining approval/permissions from appropriate respective State /National and other authorities for the Gas pipeline crossings across Other roads including village roads etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document.

10

-

-

... More
NALA/ DRAIN (UNDER JURISDICTION OF AUTHORITIES) Obtaining approval/permissions from appropriate respective State /National and other authorities for the Gas pipeline crossings across Nala & Drains etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document. Note: Small Nala/ Drain will not be considered.

30

-

-

... More
CANAL/ FIELD CHANNEL (UNDER JURISDICTION OF AUTHORITIES) Obtaining approval/permissions from appropriate respective State /National and other authorities for the Gas pipeline crossings across Canals & Field Channel etc. applicable for both pipeline and OFC laying, as per details of scope of work of the tender document. Note: Canal/ Field Channel will not be considered.

10

-

-

... More
PESO NOC

-

-

-

... More
PESO NOC for steel piepleine network (per section)

3

-

-

... More
PESO NOC for CGS/CNG STATION/DCU STATION

4

-

-

... More
PART -B (SOIL INVESTIGATION)

-

-

-

... More
Topo Graphical Survey Works For Terminal/ SV Stations/ IP Stations/ Mother station/ CGS/DRS/DCU station

-

-

-

... More
Conducting topographical survey in specified area as shown in the tender drawings by conventional/GPS or any other standard method, covering details of physical features like Rivers, Nallahs, Lakes, Ponds, wells, Pits, Forest, Trees, Road, Culverts, transmission lines, telegraph / telephone and electric poles, underground or any other services , cross drainage works including cross sectional details of nallah etc. including establishing high flood levels with source of information , identification of any monuments, historical structural , wild life sanctuary in the vicinity, storm water disposal point with levels, cross-section details of nallah, recording spot levels, including providing in tabulation grith wise no. of trees etc. as specified, plotting sand developing topographical contour maps, showing true north including establishing survey reference stations, key plan etc. including all equipment personnel's clearing of bushes as per requirement of intervisibility to carry out survey work etc. complete work in all respects as per drawings, specifications and direction, Specifications and directions of Engineer-In-Charge including submitting hard copies of drawings/documents and supply of electronic files. Note: Survey work shall be carried out by survey agency approved by Contractor and shall be submitted to EPMC/EPC for review. Note: (1) Surveyors having adequate practical knowledge and experienced in survey works with advanced equipment is essential. Man and equipment required are to be arranged by the contractor at his own cost. (2) The Surveyors shall include the cost towards mobilisation/de-mobilisation of equipment and men . (3) The Surveyors shall include the cost towards clearing of bushes/vegetation/cutting and removing tree branches (if required), in his quoted rates. (4) This work shall be carried at different stations. Surveyors shall recommended suitable land for stations. (5) Surveyors shall include the cost of Grid Pillar,Boundary Pillar & Permanent Pillar etc. in the quoted rates

30000

-

-

... More
GEOTECHNICAL INVESTIGATION For STATIONS/TERMINALS/MOTHER STATION/ CGS Mobilization of plant and personnel at site including shifting of plant and personnel from one site to another and demobilization, complete for soil investigation work as described in scope of work ,Specifications, and as per instruction of Engineer –in –charge

-

-

-

... More
Boring of minimum 150 mm dia boreholes as specified through all kind of soils In pipeline stations, (for maximum 15m depth of borehole from Existing Ground as per instruction of Engineer-in-charge ).

200

-

-

... More
Drilling through rock with minimum NX size bit up to a maximum depth of 15m from existing Ground as per instruction of Engineer –in –charge at Pipeline stations

-

-

-

... More
Using Tungsten Bit

1

-

-

... More
Using Diamond Bit

1

-

-

... More
Conducting Standard Penetration tests in boreholes as specified.

14

-

-

... More
Collecting 100 mm dia undisturbed samples from boreholes as specified .

6

-

-

... More
Conducting Electrical Resistivity Tests (ERT) as specified

1

-

-

... More
Conducting Thermal Resistivity Tests (TRT) as specified

1

-

-

... More
Conducting the following laboratory tests as specified

-

-

-

... More
Atterberg’s Limit (LL & PL)

14

-

-

... More
Natural water content

14

-

-

... More
Bulk and Dry density, optimum moisture content dry density relationship

14

-

-

... More
Specific Gravity and Void ratio

14

-

-

... More
Grain Size Analysis

-

-

-

... More
Sieve analysis

6

-

-

... More
Hydrometer Analysis

6

-

-

... More
Tri axial tests:

-

-

-

... More
Unconsolidated un drained

5

-

-

... More
Consolidated undrained

5

-

-

... More
Unconfined compression test on UDS

5

-

-

... More
Consolidation test as specified

5

-

-

... More
Test on rock samples as per relevant IS code

-

-

-

... More
Uniaxial compression test

5

-

-

... More
Point load test

5

-

-

... More
Chemical test as specified- pH, chlorides, sulphates.

-

-

-

... More
On soil samples

5

-

-

... More
On ground water samples

5

-

-

... More
Shrinkage Limit test as per relevant IS code**

5

-

-

... More
Swelling potential test as per relevant IS code**

5

-

-

... More
Swelling pressure test as per relevant IS code**

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.