BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 2,50,000Document Cost
₹ 2,500Tender Fee
Refer Documents
Summary
Improvement Of 18 Nos Of Road Under Sopd-g For The Year 24-25 Under Goreswar Lac
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_42183_4Bid Award Id
ViewTender No
CE/Commn/125/SOPD-G/24-25/02Tender Authority
Public Works Roads Department ViewPurchaser Address
-Website
http://https://pwdroads.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
659.7
1595
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
310.5
1617
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
607.5
1638
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
292.5
1574
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
585
1660
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
225
1488
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
283.5
1961
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
280.3
1875
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
857.25
1724
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
360
1746
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
405
1810
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
337.5
1703
-
... More
Construction of 1000M dia Double opening HPC 1 Nos ,Construction of 1000M dia Single opening HPC 4 Nos,(Only laying)Construction of 600M dia single opening HPC 7 No(Only laying) , Earth work in excavation of foundation of structures as per drawing and technical specifications Clause 305.1, including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling with approved material. I. Ordinary soil upto 3 m depth
167.18
127
-
... More
PCC M10 (1:3:6) in levelling course below open Foundation of Head walls as per drawing and technical specifications Clauses 1109.
3.44
6036
-
... More
Brick msonry work in cement mortar in substructure complete excluding pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 ii) In 1:4 cement mortar
33.21
7450
-
... More
Laying 1st class bedding on well compacted sand, moorum as per clause 115(ii) Granular bedding
37.67
1558
-
... More
Plastering with cement morter(1:4) 15 mm thick on brick work in sub structure as per technical specification.
69.39
146
-
... More
Providing and Laying RCC NP-3 in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of grannular material in single row including fixing collar with cement mortar 1;2 but excluding excavatiuon, protection works, backfilling, concrete and masonary works, in head walls and parapets Clause 1106. B) 1000MM Dia
45
7787
-
... More
Providing and Laying RCC NP-3 in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of grannular material in single row including fixing collar with cement mortar 1;2 but excluding excavatiuon, protection works, backfilling, concrete and masonary works, in head walls and parapets Clause 1106. B) 600MM Dia
52.5
3272
-