Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date18 Dec 2024
Closing Soon24 Dec 2024
Tender Amount₹ 45,60,400 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Earthen shoulder (filling with fresh selected soil) Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Landm Ch,2129.00m to Ch.2849.00m )

300.38

339

-

... More
(ii) Fakua Balia PWD Road to Bargool Heavy Dressing. Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.

2232

8

-

... More
Subgrade. Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land

855.6

339

-

... More
Gravel/Soil-Aggregregate surface course (table 400.3) Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402

334.8

2628

-

... More
Construction of Earthen shoulder (filling with fresh selected soil) Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land

248.31

339

-

... More
(iii) Fakua Balia PWD Road to Nayagram Heavy Dressing. Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.

1800

8

-

... More
Subgrade. Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land

690

339

-

... More
Gravel/Soil-Aggregregate surface course (table 400.3) Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402

270

2628

-

... More
Construction of Earthen shoulder (filling with fresh selected soil) Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land

200.25

339

-

... More
(iv) Amertol PWD Road to Amdhor Graveyard Heavy Dressing. Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.

1260

8

-

... More
Subgrade. Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land

483

339

-

... More
Gravel/Soil-Aggregregate surface course (table 400.3) Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402

189

2628

-

... More
Construction of Earthen shoulder (filling with fresh selected soil) Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land

140.18

339

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.