Public Works Roads Department Tender
... More
The PWRD has issued a formal invitation for competitive bids for the Public Works Roads Department project, for Construction of road Imp Of Japari Gerua Kushtoli Patidaya Road Under Sopd in Marigaon, Assam, with an estimated contract value of Rs. 1,06,07,000. The bid opening date for this tender is 12-11-2018 and the last date for bid submission is 30-11-2018. Interested bidders for Public Works Roads Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 2,12,140Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_PWD_9586_1Bid Award Id
ViewTender No
SE/NRC/TB/NIT/01/2015-16/78Tender Authority
Public Works Roads Department ViewPurchaser Address
-Website
http://https://pwdbnh.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on RCC Post 100 mm x 100 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing Clause 1701
30
-
4068.18
... More
Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design level by adding
fresh approved selected soil and compacting it with appropriate equipment at OMC
upto a lead of 1000 m as per technical specification Clause 1903.
4211.94
-
324.95
... More
WBM Grading 2
Using stone screening Type-B 11.2 mm for Gr.III
Repairing pot holes , Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
(A) By Manual Means
37.97
-
4599.82
... More
WBM Grading 3
Using stone screening Type-B 11.2 mm for Gr.III
Repairing pot holes , Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
(A) By Manual Means
531.56
-
4605.67
... More
Providing ,laying Semi Dense Bituminous Concrete (SDBC) with 100-120 TPH batch: Providing and laying semi dense type HMP producing an average out put of 75 tones per hour using crushed aggregate of specified grading ,premixed with bituminous binder @ 4.5 to 5% of mix filler transporting the hot mix to work site , laying with hydraulic paver finisher with sensor control to the required grade , level and alignment , rolling with smooth wheel roller to achieved the desired compaction as per MORT & H cl.no.508 complete in all respect including all leads ( including testing the materials at site and at laboratory ) as per technical specification and as directed by the deptt. With 60/70 grade bitumen Grade-II(10 mm nominal size).
515.63
-
11437.86
... More
Road Works Heading
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements