Public Works Roads Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 4,83,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Construction Of Bridge In Kokrajhar District I. I. Br. No. 3/1 On Tarnaguri To Salakati Road Via Bhumki -1
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWRDW_37897_16Bid Award Id
ViewTender No
CE/EAP/ARRBP02TENDERS2024/10Tender Authority
Public Works Roads Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) upto 3 m Depth i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
366.12
-
-
... More
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
259.2
-
-
... More
Levelling course for Pile Cap i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
14.15
-
-
... More
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
239.6
-
-
... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
39.54
-
-
... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test. i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
1000
-
-
... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). b) Lateral load test i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
100
-
-
... More
Integrity testing of pile using pile driving analyser or equivalent as approved by Engineer in charge and detailed in specification. Test to be carried out by approved reputed agency. Item to be include all incidental work to execute the job. i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
4
-
-
... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, Without plasticiser, RCC Grade M35, With Batching Plant, Transit Mixer and Concrete Pump Height upto 5m i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
65.55
-
-
... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
9.53
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
41.35
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification b) Sandy material i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
102.46
-
-
... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall /return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
20
-
-
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure Without plasticiser, RCC Grade M35, as per drawing and Technical Specification' including steel shuttering formwork. Using Batching Plant, Transit Mixer and Concrete Pump i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
236.39
-
-
... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA / SAIL / Esser Steel / Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
16.49
-
-
... More
Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC / Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. completeas required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/ loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span ( Extra for every increase of 100.00mt. or part there for in the span load capacity up to 800.00 mt.) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
1
-
-
... More
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 a) With crushed stone Nominal mix (1:2.5:5) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
5.61
-
-
... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
17.85
-
-
... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation). i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
25.5
-
-
... More
Drainage Spouts complete as per drawing and Technical specification i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
12
-
-
... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
21.32
-
-
... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
75.8
-
-
... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
147.81
-
-
... More
Non-Destructive testing with Ultrasonic Pulse VelocityMeter with data storage facility for detection of cracks, viods and other imperfections in Reinforced concrete Structures and furnishing thereof in proper comprehensible format, complete as directed by the Department. i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
24
-
-
... More
Non-Destrictive testing with Rebound Hammer for detection of damage zone in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
40
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) Depth upto 3 m i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
10.26
-
-
... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
47.99
-
-
... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 i) Stone / Boulder i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
109.72
-
-
... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. Without plasticiser, PCC Grade M15 for Toe Wall i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
12.82
-
-
... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
0.25
-
-
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
359.69
-
-
... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and comp g actin to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
2227.27
-
-
... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
634.01
-
-
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 . i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
303.58
-
-
... More
WBM Grading 2 , Using stone screening Type-B 11.2 mm for Gr.II - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. A. By Manual Means i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
111.94
-
-
... More
WBM Grading 3 , Using stone screening Type-B 11.2 mm for Gr.III - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. A. By Manual Means i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
111.94
-
-
... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. a) Including Edge block/ Edge restraints i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
1492.5
-
-
... More
Soil/ Sub-Grade stabilisation using non-woven Geo-Textiles/ Geo- Grids Providing and laying one layer of Non-Woven geotextile of minimum mass per unit area of 280gms/sqm.having minimum roll width of 5.0m treated with carbon black with physical properties as given in clause no 702.2.3. over 25mm thick compacted sand layer on a prepared subgrade as a filter media with necessary overlaps as per drawing and technical specification and as directed by the Engineer in charge complete. i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
444.51
-
-
... More
Providing approved variety of vetiver plantation certified by The Vetiver Network International (TVNI) or its affiliate in India including pouching of tiller with selected soil for agricultural use mixed with farmyard manure in 8”x 6” poly pouch, maintaining the pouched plants for at least 1(one) month with application of growth promoter, fertilizer, watering, weeding etc., dressing of the area of plantation, planting the pouched plants as per design approved by The Vetiver Network International (TVNI) or its affiliate in India. (Excluding jungle clearance, earth work in trimming, cutting, filling etc.) and Maintenance of the vetiver plants by watering, pruning, weeding, mulching, application of manure, fertilizer, growth promoter etc. for 4 (four) months after completion of plantation. i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
444.51
-
-
... More
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars / local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and technical specification clause 1704 i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
40
-
-
... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
2
-
-
... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 900mm equilateral triangle i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
4
-
-
... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 600mm x 600mm square i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
4
-
-
... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the Mort&H specifications i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
59.7
-
-
... More
Providing and fixing of road stud 100 x 100 mm die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling holes 30 mm upto a depth of 600 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973. i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
72
-
-
... More
Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trenches, watering , fixing the tree guard and maintaining the plants for three year. i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
66
-
-
... More
Air quality monitoring at 3 locations for 1 season for 1 year. (Pre-Construction Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
3
-
-
... More
Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
12
-
-
... More
Air quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
6
-
-
... More
Water quality monitoring at 3 locations for 1 season for 1 year. (Pre-Construction Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
3
-
-
... More
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
12
-
-
... More
Water quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
6
-
-
... More
Noise quality monitoring at 3 locations for 1 season for 1 year. (Pre-Construction Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
3
-
-
... More
Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
12
-
-
... More
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
6
-
-
... More
Soil quality monitoring at 3 locations for 1 season for 1 year. (Pre-Construction Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
3
-
-
... More
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
12
-
-
... More
Soil quality monitoring at 3 locations for 2 seasons for 1 year (Operation Stage) i) Bridge No. 3/1 on Tarnaguri to Salakati Road via Bhumki-1.
6
-
-
... More
A Provisional sum (Fixed Amount) for the items of utility shifting, Tree cutting & Occupational Health & Safety of Rs. 6,49,047.00 (not to be changed by the Bidders in BOQ)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements