Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date15 Jun 2024
Closing Date15 Jul 2024
Tender Amount₹ 97,71,000 
Notes
Download

Costs

Summary

Maintenance Of Bridges In Morigaon District I.br. No. 3/1 On Dakhinbarapujia To Balipara Ii. Br. No. 2/1 On Sharaligaon To Mathorbori Iii. Br. No. 8/1 On Nawkatadanduapatrabori Iv.br.3/1 Jaluguti Bhurbandha

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sealing of crcacks/porous concrete by injection process through nipples/Grouting complete as per Technical specification Br.No. 3/1, Dakhin Barapujia to Balipara Road

15.6

-

-

... More
Patching of damaged Concrete surface with Polymer concrete in Girder, railing and posts, cross girder & fly return wall Br.No. 3/1, Dakhin Barapujia to Balipara Road

0.46

-

-

... More
Application of Epoxy Agent for bonding of new concrete to old concrete in Girder, Railing and Posts, Cross Girder & Fly return wall Br.No. 3/1, Dakhin Barapujia to Balipara Road

0.46

-

-

... More
Applying cement based polymer morter for replacement of spalled concrete in Girder Br.No. 3/1, Dakhin Barapujia to Balipara Road

0.46

-

-

... More
Removal and cleaning RCC Surface (By sand blasting or wire brush) Br.No. 3/1, Dakhin Barapujia to Balipara Road

0.46

-

-

... More
Replacing drainage spouts Drainage spouts complete as per drawing and technical specifications Clause 1209 Br.No. 3/1, Dakhin Barapujia to Balipara Road

14

-

-

... More
Cutting unnecessary grown trees Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. Br.No. 3/1, Dakhin Barapujia to Balipara Road

5

-

-

... More
Replacement of expansion joints Br.No. 3/1, Dakhin Barapujia to Balipara Road

16.6

-

-

... More
Protective coating of Piers & Abutments with performance guarantee for 3 years Application cost of two part highbuild 100% solid content system of Cyclophat polyamino based KRAYON KI30021 COROGARD to give protective coating to the substract by giving good bonding to the intermediate coat of Krayon KI 30031 RUST CONVERTOR coat giving the cured coat of crosslinked protective coating from rust , corrosion and weathering effect including cost of material, labour, scafolding, cleaning over application of one part primer fron three part system and two part primer from three part system Krayon KI 30031 RUST CONVERTOR PRIMER and consumable complete as directed by the Engineer-incharge and conforming quality as per IS / IRC Specifications. Br.No. 3/1, Dakhin Barapujia to Balipara Road

94.52

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm circular Br.No. 3/1, Dakhin Barapujia to Balipara Road

2

-

-

... More
ii) RPM at 2m c/c - Studd Br.No. 3/1, Dakhin Barapujia to Balipara Road

31

-

-

... More
Tree reflector made of high intensity grade retro-reflectorised sheeting fixed over aluminium sheeting of 2mm/0.28mm thick firmly fixed with necessary galvanized nail. 100mm dia/ 100mm x 100mm size Br.No. 3/1, Dakhin Barapujia to Balipara Road

12

-

-

... More
Tree reflector made of high intensity grade retro-reflectorised sheeting fixed over aluminium sheeting of 2mm/0.28mm thick firmly fixed with necessary galvanized nail. 600mm X 450mm Rectangular (Hazard Marking) Br.No. 3/1, Dakhin Barapujia to Balipara Road

2

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Br.No. 3/1, Dakhin Barapujia to Balipara Road

6.14

-

-

... More
Providing corrosion resisting paint on roller rocker bearing Br.No. 3/1, Dakhin Barapujia to Balipara Road

6.23

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Br.No. 3/1, Dakhin Barapujia to Balipara Road

6

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of nserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means In area of non thorny jungle Br.No. 3/1, Dakhin Barapujia to Balipara Road

0.33

-

-

... More
upplying, fitting and fixing RCC guard post 150cm long erected 75cm above the ground and 75cm below the ground with M-15 grade (nominal mix 1:2:4 with broken stone aggregate up to 20mm size) of cement concrete and required reinforcement tied in position with annealed black wire including centering, moulding the top, curing including painting concrete surfaces in 23cm strips upto 0.75m from the top alternately in black and white and having 2 nos. reflective band of desired shade etc. complete as per design and as directed. 0 cm dia. RCC guard post with reinforcement of 6nos. 12mm dia TMT main steel bars and 6mm TMT/ MS stirrups at 15cm c/c. Br.No. 3/1, Dakhin Barapujia to Balipara Road

204

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 150 mm Filter Media LRA road at Hatikuri to Machkhal via Khasiapunjee (1 x 20) Br.No. 3/1, Dakhin Barapujia to Balipara Road

50.01

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Road from 1st KM of Digli Karjanbasti Road to 2nd Km of Jirighat Makhon nogor Road. (2 x 7.5) Br.No. 3/1, Dakhin Barapujia to Balipara Road

100.03

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 Br.No. 3/1, Dakhin Barapujia to Balipara Road

4.64

-

-

... More
Air quality monitoring at 2 lacations near project site Pre-maintenance Br.No. 3/1, Dakhin Barapujia to Balipara Road

2

-

-

... More
Water quality monitoring at 2 locations(100m upstream and 100m downstream) Pre-maintenance Br.No. 3/1, Dakhin Barapujia to Balipara Road

2

-

-

... More
Soil quality monitoring at 2 loacations near project site Pre-maintenance Br.No. 3/1, Dakhin Barapujia to Balipara Road

2

-

-

... More
Air quality monitoring at 2 lacations near project site Post-maintenance Br.No. 3/1, Dakhin Barapujia to Balipara Road

2

-

-

... More
Water quality monitoring at 2 locations(100m upstream and 100m downstream) Post-maintenance Br.No. 3/1, Dakhin Barapujia to Balipara Road

2

-

-

... More
Soil quality monitoring at 2 loacations near project site Post-maintenance Br.No. 3/1, Dakhin Barapujia to Balipara Road

2

-

-

... More
Protective coating of Deck Slab, Girders, Kerb, Post and Railing with performance guarantee for 3 years Application cost of two part highbuild 100% solid content system of Cyclophat polyamino based KRAYON KI30021 COROGARD to give protective coating to the substract by giving good bonding to the intermediate coat of Krayon KI 30031 RUST CONVERTOR coat giving the cured coat of crosslinked protective coating from rust , corrosion and weathering effect including cost of material, labour, scafolding, cleaning over application of one part primer fron three part system and two part primer from three part system Krayon KI 30031 RUST CONVERTOR PRIMER and consumable complete as directed by the Engineer-incharge and conforming quality as per IS / IRC Specifications. Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

777.06

-

-

... More
Decorative Paint of Railing Painting Two Coats on Concrete Surfaces : Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 Epoxy grouting Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

82.99

-

-

... More
Providing and inserting nipples for grouting Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

14

-

-

... More
Sealing Cracks with Epoxy Grout in Girder Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

36.4

-

-

... More
Applying cement based polymer morter for replacement of spalled concrete in Girder Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

13.77

-

-

... More
Removal and cleaning RCC Surface (By sand blasting or wire brush) Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

3.44

-

-

... More
Reconstruction of railing part and approach slab by M 35 concrete Using Batching Plant, Transit Mixer and Concrete Pump) Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

17.85

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

168.75

-

-

... More
Providing PCC below approach slabs PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

9.66

-

-

... More
Replacing drainage spouts Drainage spouts complete as per drawing and technical specifications Clause 1209 Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

12

-

-

... More
Cutting unnecessary grown trees Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

6

-

-

... More
Replacement of expansion joints Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

17

-

-

... More
Lifting of superstructure span by jacking up for bearing replacement Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

1

-

-

... More
Replacement of bearings Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

6

-

-

... More
Protective coating of Piers & Abutments with performance guarantee for 3 years Application cost of two part highbuild 100% solid content system of Cyclophat polyamino based KRAYON KI30021 COROGARD to give protective coating to the substract by giving good bonding to the intermediate coat of Krayon KI 30031 RUST CONVERTOR coat giving the cured coat of crosslinked protective coating from rust , corrosion and weathering effect including cost of material, labour, scafolding, cleaning over application of one part primer fron three part system and two part primer from three part system Krayon KI 30031 RUST CONVERTOR PRIMER and consumable complete as directed by the Engineer-incharge and conforming quality as per IS / IRC Specifications. Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

84.6

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm circular Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

2

-

-

... More
ii) RPM at 2m c/c - Studd Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

26

-

-

... More
Tree reflector made of high intensity grade retro-reflectorised sheeting fixed over aluminium sheeting of 2mm/0.28mm thick firmly fixed with necessary galvanized nail. 100mm dia/ 100mm x 100mm size Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

16

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

5.1

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of nserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means In area of non thorny jungle Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

2766.75

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 150 mm Filter Media LRA road at Hatikuri to Machkhal via Khasiapunjee (1 x 20) Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

21.26

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Road from 1st KM of Digli Karjanbasti Road to 2nd Km of Jirighat Makhon nogor Road. (2 x 7.5) Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

42.51

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

97.11

-

-

... More
Air quality monitoring at 2 lacations near project site Pre-maintenance Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

2

-

-

... More
Water quality monitoring at 2 locations(100m upstream and 100m downstream) Pre-maintenance Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

2

-

-

... More
Soil quality monitoring at 2 loacations near project site Pre-maintenance Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

2

-

-

... More
Air quality monitoring at 2 lacations near project site Post-maintenance Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

2

-

-

... More
Water quality monitoring at 2 locations(100m upstream and 100m downstream) Post-maintenance Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

2

-

-

... More
Soil quality monitoring at 2 loacations near project site Post-maintenance Br.No. 2/1, Sharaligaon to Mothorbori via. Dakhin Barapujia

2

-

-

... More
Protective coating of Deck Slab, Girders, Kerb, Post and Railing with performance guarantee for 3 years Application cost of two part highbuild 100% solid content system of Cyclophat polyamino based KRAYON KI30021 COROGARD to give protective coating to the substract by giving good bonding to the intermediate coat of Krayon KI 30031 RUST CONVERTOR coat giving the cured coat of crosslinked protective coating from rust , corrosion and weathering effect including cost of material, labour, scafolding, cleaning over application of one part primer fron three part system and two part primer from three part system Krayon KI 30031 RUST CONVERTOR PRIMER and consumable complete as directed by the Engineer-incharge and conforming quality as per IS / IRC Specifications. Br.No. 8/1, Nawkata Dandua Patrabori Road.

991.29

-

-

... More
Decorative Paint of Railing Painting Two Coats on Concrete Surfaces : Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 Epoxy grouting Br.No. 8/1, Nawkata Dandua Patrabori Road.

159.09

-

-

... More
Providing and inserting nipples for grouting Br.No. 8/1, Nawkata Dandua Patrabori Road.

6

-

-

... More
Sealing Cracks with Epoxy Grout in Girder .Br.No. 8/1, Nawkata Dandua Patrabori Road.

15.6

-

-

... More
Replacing drainage spouts Drainage spouts complete as per drawing and technical specifications Clause 1209 Br.No. 8/1, Nawkata Dandua Patrabori Road.

16

-

-

... More
Cutting unnecessary grown trees Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. Br.No. 8/1, Nawkata Dandua Patrabori Road.

6

-

-

... More
Replacement of expansion joints Br.No. 8/1, Nawkata Dandua Patrabori Road.

17

-

-

... More
Protective coating of Piers & Abutments with performance guarantee for 3 years Application cost of two part highbuild 100% solid content system of Cyclophat polyamino based KRAYON KI30021 COROGARD to give protective coating to the substract by giving good bonding to the intermediate coat of Krayon KI 30031 RUST CONVERTOR coat giving the cured coat of crosslinked protective coating from rust , corrosion and weathering effect including cost of material, labour, scafolding, cleaning over application of one part primer fron three part system and two part primer from three part system Krayon KI 30031 RUST CONVERTOR PRIMER and consumable complete as directed by the Engineer-incharge and conforming quality as per IS / IRC Specifications. Br.No. 8/1, Nawkata Dandua Patrabori Road.

171.92

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm circular Br.No. 8/1, Nawkata Dandua Patrabori Road.

2

-

-

... More
ii) RPM at 2m c/c - Studd Br.No. 8/1, Nawkata Dandua Patrabori Road.

34

-

-

... More
Tree reflector made of high intensity grade retro-reflectorised sheeting fixed over aluminium sheeting of 2mm/0.28mm thick firmly fixed with necessary galvanized nail. 100mm dia/ 100mm x 100mm size Br.No. 8/1, Nawkata Dandua Patrabori Road.

16

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Br.No. 8/1, Nawkata Dandua Patrabori Road.

6.8

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Br.No. 8/1, Nawkata Dandua Patrabori Road.

3689

-

-

... More
Supplying, fitting and fixing RCC guard post 150cm long erected 75cm above the ground and 75cm below the ground with M-15 grade (nominal mix 1:2:4 with broken stone aggregate up to 20mm size) of cement concrete and required reinforcement tied in position with annealed black wire including centering, moulding the top, curing including painting concrete surfaces in 23cm strips upto 0.75m from the top alternately in black and white and having 2 nos. reflective band of desired shade etc. complete as per design and as directed. 30 cm dia. RCC guard post with reinforcement of 6nos. 12mm dia TMT main steel bars and 6mm TMT/ MS stirrups at 15cm c/c. Br.No. 8/1, Nawkata Dandua Patrabori Road.

68

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 150 mm Filter Media LRA road at Hatikuri to Machkhal via Khasiapunjee (1 x 20) Br.No. 8/1, Nawkata Dandua Patrabori Road.

60.15

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Road from 1st KM of Digli Karjanbasti Road to 2nd Km of Jirighat Makhon nogor Road. (2 x 7.5) Br.No. 8/1, Nawkata Dandua Patrabori Road.

120.29

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 Br.No. 8/1, Nawkata Dandua Patrabori Road.

106.06

-

-

... More
Air quality monitoring at 2 lacations near project site Pre-maintenance Br.No. 8/1, Nawkata Dandua Patrabori Road.

2

-

-

... More
Water quality monitoring at 2 locations(100m upstream and 100m downstream) Pre-maintenance Br.No. 8/1, Nawkata Dandua Patrabori Road.

2

-

-

... More
Soil quality monitoring at 2 loacations near project site Pre-maintenance Br.No. 8/1, Nawkata Dandua Patrabori Road.

2

-

-

... More
Air quality monitoring at 2 lacations near project site Post-maintenance Br.No. 8/1, Nawkata Dandua Patrabori Road.

2

-

-

... More
Water quality monitoring at 2 locations(100m upstream and 100m downstream) Post-maintenance Br.No. 8/1, Nawkata Dandua Patrabori Road.

2

-

-

... More
Soil quality monitoring at 2 loacations near project site Post-maintenance Br.No. 8/1, Nawkata Dandua Patrabori Road.

2

-

-

... More
Protective coating of Deck Slab, Girders, Kerb, Post and Railing with performance guarantee for 3 years Application cost of two part highbuild 100% solid content system of Cyclophat polyamino based KRAYON KI30021 COROGARD to give protective coating to the substract by giving good bonding to the intermediate coat of Krayon KI 30031 RUST CONVERTOR coat giving the cured coat of crosslinked protective coating from rust , corrosion and weathering effect including cost of material, labour, scafolding, cleaning over application of one part primer fron three part system and two part primer from three part system Krayon KI 30031 RUST CONVERTOR PRIMER and consumable complete as directed by the Engineer-incharge and conforming quality as per IS / IRC Specifications. Br.No. 3/1, Jaluguti Bhurbandha Road

1069.44

-

-

... More
Decorative Paint of Railing Painting Two Coats on Concrete Surfaces : Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 Epoxy grouting Br.No. 3/1, Jaluguti Bhurbandha Road

81.6

-

-

... More
Providing and inserting nipples for grouting Br.No. 3/1, Jaluguti Bhurbandha Road

42

-

-

... More
Sealing Cracks with Epoxy Grout in Girder Br.No. 3/1, Jaluguti Bhurbandha Road

109.2

-

-

... More
Patching of damaged Concrete surface with Polymer concrete in Girder, railing and posts, cross girder & fly return wall Br.No. 3/1, Jaluguti Bhurbandha Road

38.9

-

-

... More
Application of Epoxy Agent for bonding of new concrete to old concrete in Girder, Railing and Posts, Cross Girder & Fly return wall Br.No. 3/1, Jaluguti Bhurbandha Road

38.9

-

-

... More
Applying cement based polymer morter for replacement of spalled concrete in Girder Br.No. 3/1, Jaluguti Bhurbandha Road

7.63

-

-

... More
Reconstruction of railing part and approach slab by M 35 concrete Using Batching Plant, Transit Mixer and Concrete Pump Br.No. 3/1, Jaluguti Bhurbandha Road

17.85

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. Br.No. 3/1, Jaluguti Bhurbandha Road

168.75

-

-

... More
Providing PCC below approach slabs PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Br.No. 3/1, Jaluguti Bhurbandha Road

9.66

-

-

... More
Replacing drainage spouts Drainage spouts complete as per drawing and technical specifications Clause 1209 Br.No. 3/1, Jaluguti Bhurbandha Road

15

-

-

... More
Cutting unnecessary grown trees Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. Br.No. 3/1, Jaluguti Bhurbandha Road

15

-

-

... More
Replacement of expansion joints Br.No. 3/1, Jaluguti Bhurbandha Road

15

-

-

... More
Protective coating of Piers & Abutments with performance guarantee for 3 years Application cost of two part highbuild 100% solid content system of Cyclophat polyamino based KRAYON KI30021 COROGARD to give protective coating to the substract by giving good bonding to the intermediate coat of Krayon KI 30031 RUST CONVERTOR coat giving the cured coat of crosslinked protective coating from rust , corrosion and weathering effect including cost of material, labour, scafolding, cleaning over application of one part primer fron three part system and two part primer from three part system Krayon KI 30031 RUST CONVERTOR PRIMER and consumable complete as directed by the Engineer-incharge and conforming quality as per IS / IRC Specifications. Br.No. 3/1, Jaluguti Bhurbandha Road

70.72

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm circular Br.No. 3/1, Jaluguti Bhurbandha Road

2

-

-

... More
ii) RPM at 2m c/c - Studd Br.No. 3/1, Jaluguti Bhurbandha Road

32

-

-

... More
Tree reflector made of high intensity grade retro-reflectorised sheeting fixed over aluminium sheeting of 2mm/0.28mm thick firmly fixed with necessary galvanized nail. 100mm dia/ 100mm x 100mm size Br.No. 3/1, Jaluguti Bhurbandha Road

16

-

-

... More
600MM X 450MM rectangular ( Hazard marking) Br.No. 3/1, Jaluguti Bhurbandha Road

2

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Br.No. 3/1, Jaluguti Bhurbandha Road

6.36

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of nserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means In area of non thorny jungle Br.No. 3/1, Jaluguti Bhurbandha Road

3450.3

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 150 mm Filter Media Br.No. 3/1, Jaluguti Bhurbandha Road

27.04

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Br.No. 3/1, Jaluguti Bhurbandha Road

54.09

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 Br.No. 3/1, Jaluguti Bhurbandha Road

120.08

-

-

... More
Air quality monitoring at 2 lacations near project site Pre-maintenance Br.No. 3/1, Jaluguti Bhurbandha Road

2

-

-

... More
Water quality monitoring at 2 locations(100m upstream and 100m downstream) Pre-maintenance Br.No. 3/1, Jaluguti Bhurbandha Road

2

-

-

... More
Soil quality monitoring at 2 loacations near project site Pre-maintenanceB Br.No. 3/1, Jaluguti Bhurbandha Road

2

-

-

... More
Air quality monitoring at 2 lacations near project site Post-maintenance Br.No. 3/1, Jaluguti Bhurbandha Road

2

-

-

... More
Water quality monitoring at 2 locations(100m upstream and 100m downstream) Post-maintenance Br.No. 3/1, Jaluguti Bhurbandha Road

2

-

-

... More
Soil quality monitoring at 2 loacations near project site Post-maintenance Br.No. 3/1, Jaluguti Bhurbandha Road

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.