BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 73,666Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_41561_1Bid Award Id
ViewTender No
BDTRD_SOPD(G)_24_25_04Tender Authority
Public Works Roads Department ViewPurchaser Address
-Website
http://https://pwdroads.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of granular surface course by providing well graded material, spreadingin uniform layers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with three wheel 80-100 kNstatic roller capacity to achieve the desired density, complete as per TechnicalSpecification Clause 402
155.1
2628
-
... More
2) Construction of Tikirai Chapori Ali : Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/ irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
318.72
1
-
... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. (a) Private land
917.02
258
-
... More
Construction of subgrade and earthen shoulders with approved material obtainedfrom borrow pits with all lifts and leads, transporting to site, spreading, grading torequired slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specificat ion Clause 303.1.(i) Private Land
169.58
339
-
... More
Construction of granular surface course by providing well graded material, spreadingin uniform layers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with three wheel 80-100 kNstatic roller capacity to achieve the desired density, complete as per TechnicalSpecification Clause 402
47.81
2628
-
... More
3) Construction of Gohain gaon Ali : Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/ irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
1555.9
8
-
... More
Construction of granular surface course by providing well graded material, spreadingin uniform layers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with three wheel 80-100 kNstatic roller capacity to achieve the desired density, complete as per TechnicalSpecification Clause 402
234
2628
-
... More
Making up loss of material/irregularities on shoulders to the design level byadding fresh approved selected soil and compacting it with appropriateequipment at OMC upto a lead of 1000 m as per technical specification Clause
780
83
-
... More
4) Construction of BMP Line Road (Numoligarh T E): Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/ irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
3900
8
-
... More
Construction of granular surface course by providing well graded material, spreadingin uniform layers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with three wheel 80-100 kNstatic roller capacity to achieve the desired density, complete as per TechnicalSpecification Clause 402
585
2628
-
... More
Making up loss of material/irregularities on shoulders to the design level byadding fresh approved selected soil and compacting it with appropriateequipment at OMC upto a lead of 1000 m as per technical specification Clause