Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date10 Oct 2023
Closing Date10 Nov 2023
Tender Amount₹ 5,19,15,000 
Notes
Download

Costs

Summary

Construction Of Bridges In Morigaon District I.br 1/1 Kodamtola To Dakhin Tengaguri Rd Ii.br 2/1 Kadamtola To Dakin Tengaguri Rd

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

30

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

522.5

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

709.5

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

18

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

24

-

-

... More
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

4

-

-

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

270

-

-

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

180

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

723.06

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

255.09

-

-

... More
Levelling course for Pile cap ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

15.84

-

-

... More
Levelling course for Pile cap i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

9.43

-

-

... More
Cement concrete for reinforced concrete in Pile cap, Tie Beam complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

272.48

-

-

... More
Cement concrete for reinforced concrete in Pile cap complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

159.73

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

70.69

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

51.63

-

-

... More
Dismantling of Existing HP - Hume Pipe Culvert ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

8

-

-

... More
Dismantling of Existing slab culvert (5.00X5.00X1.00M) (i) base slab - Foundation (ii) walls (iii) Top slab ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

82.2

-

-

... More
Plain/Reinforced cement concrete,(Return wall/Retaining Wall Foundation & Stem, Abutment shafts & Pier, Piercap and Abutment cap) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

125.89

-

-

... More
Plain/Reinforced cement concrete,(Return wall/Retaining Wall Foundation & Stem, abutment shafts & Pier, Piercap & Abutment cap) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

65.74

-

-

... More
Plain/Reinforced cement concrete, (Pedestal & Sesmic Arrestor) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser RCC Grade M40 Using Batching Plant, Transit Mixer and Concrete Pump Height 5m to 10m ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

2.66

-

-

... More
Plain/Reinforced cement concrete, (Pedestal & Sesmic Arrestor) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser RCC Grade M40 Height 5m to 10m i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

2.66

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 in substructure ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

23.16

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

9.94

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

60.99

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

34.39

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

393.47

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

216.62

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

16

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

32

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, section 9.1 & 9.2 and clause 2006 of MORTH&S Specification complete as per drawing and approved technical specification. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

660

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, section 9.1 & 9.2 and clause 2006 of MORTH&S Specification complete as per drawing and approved technical specification. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

780

-

-

... More
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

4

-

-

... More
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

4

-

-

... More
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

4

-

-

... More
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

4

-

-

... More
Plain/Reinforced cement concrete, (RCC I Girder) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser RCC Grade M35 Height 5m to 10m ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

66.3

-

-

... More
Plain/Reinforced cement concrete, (PSC I Girder) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser D. PSC Grade M40 Case II Using Batching Plant, Transit Mixer and Concrete Pump II. For T-beam & slab b Height 5m to 10m i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

88.21

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

57.52

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab, RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

68.82

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

8.93

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

7.88

-

-

... More
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

17.85

-

-

... More
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

15.75

-

-

... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

49.18

-

-

... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

81.8

-

-

... More
High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

5.03

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

21.88

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

15.01

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

14.06

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

21.35

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

2409.39

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

3622.16

-

-

... More
Strip Seal Expansion Joint : (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation). ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

17

-

-

... More
Strip Seal Expansion Joint : (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation). i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

17

-

-

... More
Providing and fixing drainage spouts as per MORT & H specifications. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

10

-

-

... More
Providing and fixing drainage spouts as per MORT & H specifications. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

12

-

-

... More
Span Load Test Load testing of one or more spans of bridge as selected by the engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span (Extra for every increase of 100.00mt or part there for in the span load capacity upto 800.00 mt ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

1

-

-

... More
Span Load Test Load testing of one or more spans of bridge as selected by the engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span (Extra for every increase of 100.00mt or part there for in the span load capacity upto 800.00 mt i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

1

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m For Toe wall ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

142.09

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m For Boulder Apron i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

75.78

-

-

... More
Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 Cement concrete grade M 10 in case of concrete block ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

39.47

-

-

... More
Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 Cement concrete grade M 10 in case of concrete block pitching i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

21.05

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

21.6

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

26.56

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

43.19

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

53.11

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

0.28

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

0.26

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

9234

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

9380.43

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

1678.11

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

1295.55

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

259

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

239.56

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

121.22

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

112.22

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

121.22

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

112.22

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

1616.25

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

1346.75

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

3097.48

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

1283.89

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm circular ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

2

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ii) 600mm circular i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

2

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm equilateral triangle i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ii) 800mm x 600mm rectangular ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

2

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ii) 800mm x 600mm rectangular i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

2

-

-

... More
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

68

-

-

... More
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

80

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

75

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

68.6

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

40

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

50

-

-

... More
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage)* i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

12

-

-

... More
Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage)* ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

12

-

-

... More
Air quality monitoring at 3 locations for 2 seasons for1year. (Operation Stage) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Air quality monitoring at 3 locations for 2 seasons for1year. (Operation Stage) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Water quality monitoring at 3 locations for 2 seasons for 2consecutive years. (Construction Stage)* i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

12

-

-

... More
Water quality monitoring at 3 locations for 2 seasons for 2consecutive years. (Construction Stage)* ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

12

-

-

... More
Water quality monitoring at 3 locations for 2 seasons for1year. (Operation Stage) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Water quality monitoring at 3 locations for 2 seasons for1year. (Operation Stage) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage)* i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

12

-

-

... More
Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage)* ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

12

-

-

... More
Noise quality monitoring at 3 locations for 2 seasons for1year. (Operation Stage) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Noise quality monitoring at 3 locations for 2 seasons for1year. (Operation Stage) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage)* i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

12

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage)* ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

12

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 1 year.(Operation Stage) i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 1 year.(Operation Stage) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

6

-

-

... More
Training Related to Capacity Building i) Br. No. 1/1 on Kadamtola to Dakhin Tengaguri Road

2

-

-

... More
A Provisional sum (Fixed Amount) for the items of Tree cutting and afforestation of Rs. 1,69,059.00 (not to be changed by the Bidders in BOQ) ii) Br. No. 2/1 on Kadamtola to Dakhin Tengaguri Road

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.