Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date18 Nov 2023
Closing Date1 Dec 2023
Tender Amount₹ 13,39,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Plain/Reinforced cement concrete, in substructure complete as per drawing and technical specification and steel shuttering formwork. I. Without plasticiser (B) PCC Grade M 20 (Rate as per SOR (RR) 2020-21)

3.75

-

-

... More
Labour for fitting and fixing RSJ beam, CI saddle etc. in position including necessary scaffolding, cutting them to required size, drilling holes and supplying and fixing ncessary bolts and nuts, painting two coats complete (Tar-Steel paints to be supplied by the contractor at his own costs) including all lead and lifts from PWD Godown. (Rate as per SOR (RR) 2020-21)

23.15

-

-

... More
Wrought Iron and Mild Steel Welded Work (using angles, square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods or bolt and nuts complete fixed in position but without the cost of excavation and concrete for mixing which will be paid separately. (Rate as per SOR (PWD (Building & NH) 2020-21)

23.15

-

-

... More
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and technical specifications (Rate as per SOR (RR) 2020-21)

2.9

-

-

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications (Rate as per SOR (RR) 2020-21)

61.3

-

-

... More
Repair of steel railing to bring it to original shape cleaning and repainting as per drawing and technical specification Clause 1911 (Rate as per SOR (RR) 2020-21)

61.3

-

-

... More
Steel BridgeNo. 3/1 on Netai Bhimbor road Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per Technical Specification Clause 202.

2.32

-

-

... More
Labour for fitting and fixing RSJ beam, CI saddle etc. in position including necessary scaffolding, cutting them to required size, drilling holes and supplying and fixing ncessary bolts and nuts, painting two coats complete (Tar-Steel paints to be supplied by the contractor at his own costs) including all lead and lifts from PWD Godown. (Rate as per SOR (RR) 2020-21)

23.85

-

-

... More
Wrought Iron and Mild Steel Welded Work (using angles, square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods or bolt and nuts complete fixed in position but without the cost of excavation and concrete for mixing which will be paid separately. (Rate as per SOR (PWD (Building & NH) 2020-21)

23.85

-

-

... More
Repair of steel railing to bring it to original shape cleaning and repainting as per drawing and technical specification Clause 1911 (Rate as per SOR (RR) 2020-21)

71.3

-

-

... More
Steel Bridge No. 2/1 on Dhundarmukh Ali Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per Technical Specification Clause 202.

2.71

-

-

... More
Labour for fitting and fixing RSJ beam, CI saddle etc. in position including necessary scaffolding, cutting them to required size, drilling holes and supplying and fixing ncessary bolts and nuts, painting two coats complete (Tar-Steel paints to be supplied by the contractor at his own costs) including all lead and lifts from PWD Godown. (Rate as per SOR (RR) 2020-21)

22.37

-

-

... More
Wrought Iron and Mild Steel Welded Work (using angles, square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods or bolt and nuts complete fixed in position but without the cost of excavation and concrete for mixing which will be paid separately. (Rate as per SOR (PWD (Building & NH) 2020-21)

22.37

-

-

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications (Rate as per SOR (RR) 2020-21)

66.04

-

-

... More
Repair of steel railing to bring it to original shape cleaning and repainting as per drawing and technical specification Clause 1911 (Rate as per SOR (RR) 2020-21)

61.3

-

-

... More
Steel Bridge No. 4/1 on Demow Dehing Road Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per Technical Specification Clause 202. A) Including dismembering (Rate as per SOR (RR) 2020-21)

3.56

-

-

... More
Labour for fitting and fixing RSJ beam, CI saddle etc. in position including necessary scaffolding, cutting them to required size, drilling holes and supplying and fixing ncessary bolts and nuts, painting two coats complete (Tar-Steel paints to be supplied by the contractor at his own costs) including all lead and lifts from PWD Godown. (Rate as per SOR (RR) 2020-21)

36.68

-

-

... More
Wrought Iron and Mild Steel Welded Work (using angles, square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods or bolt and nuts complete fixed in position but without the cost of excavation and concrete for mixing which will be paid separately. (Rate as per SOR (PWD (Building & NH) 2020-21)

36.68

-

-

... More
Repair of steel railing to bring it to original shape cleaning and repainting as per drawing and technical specification Clause 1911 (Rate as per SOR (RR) 2020-21)

120.6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.