Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date18 Aug 2023
Closing Date20 Sep 2023
Tender Amount₹ 4,30,49,000 
Notes
Download

Costs

Summary

Construction Of Bridges In Sivasagar District I) Br. No. 2/1 On Mohan Hazarika Ali Road Ii) Br. No. 3/1 On Bhulaguri To Borchapori Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of Structures, Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Mechanical Means (B) RCC i) Br. No. 2/1 on Mohan Hazarika Ali Road

30

-

-

... More
Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

24

-

-

... More
Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

27

-

-

... More
Bored cast-in-situ M 35 grade RCC pile excluding reinforcement complete as per drawing and Technical Specifications and removal of excavated earth with all lead and lift up to 1000 m. Pile Dia = 1000 i) Br. No. 2/1 on Mohan Hazarika Ali Road

216

-

-

... More
Bored cast-in-situ M 35 grade RCC pile excluding reinforcement complete as per drawing and Technical Specifications and removal of excavated earth with all lead and lift up to 1000 m. Pile Dia = 1200mm ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

240

-

-

... More
Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications. a) Initial load test (Safe load = 160 t) i) Br. No. 2/1 on Mohan Hazarika Ali Road

240

-

-

... More
Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications. a) Initial load test (Safe load = 120 t) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

337.5

-

-

... More
Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications. b) Routine Load Test of = 2.5x120 t i) Br. No. 2/1 on Mohan Hazarika Ali Road

400

-

-

... More
Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications. b) Routine Load Test of = 2.5x120 t ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

1125

-

-

... More
Pile integrity test of piles by using pile driving analyser or equivalent as approved by the E-IN-C and detail specification . Test to be carried out by an approved reputed agency including all incidental works. i) Br. No. 2/1 on Mohan Hazarika Ali Road

6

-

-

... More
Pile integrity test of piles by using pile driving analyser or equivalent as approved by the E-IN-C and detail specification . Test to be carried out by an approved reputed agency including all incidental works. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

8

-

-

... More
Cement concrete for reinforcement concrete in pile cap complete as per drawing and technical specifications. D. RCC grade M - 35 i) Using concrete mixer i) Br. No. 2/1 on Mohan Hazarika Ali Road

109.01

-

-

... More
Cement concrete for reinforcement concrete in pile cap complete as per drawing and technical specifications. D. RCC grade M - 35 i) Using concrete mixer ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

159.73

-

-

... More
Levelling course for Pile cap Providing and lying of PCC M - 15 levelling course 100 mm thick below the pile cap. as per drawing and technical specifications. i) Br. No. 2/1 on Mohan Hazarika Ali Road

7.79

-

-

... More
Levelling course for Pile cap Providing and lying of PCC M - 15 levelling course 100 mm thick below the pile cap. as per drawing and technical specifications. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

9.43

-

-

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (A) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Mohan Hazarika Ali Road

34.43

-

-

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (A) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

68.01

-

-

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. (N) Without plasticiser H) a) RCC Grade M 35 a) Height up to 5.0 m Case-I : Using Concrete Mixer i) Br. No. 2/1 on Mohan Hazarika Ali Road

95.5

-

-

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. (N) Without plasticiser H) a) RCC Grade M 35 a) Height up to 5.0 m Case-I : Using Concrete Mixer ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

89.19

-

-

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Mohan Hazarika Ali Road

10.18

-

-

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

14.24

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. i) Br. No. 2/1 on Mohan Hazarika Ali Road

30

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

42

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular Material i) Br. No. 2/1 on Mohan Hazarika Ali Road

75.95

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular Material ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

98.27

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br. No. 2/1 on Mohan Hazarika Ali Road

43.4

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

40.66

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, complete as per drawing and approved technical specification. i) Br. No. 2/1 on Mohan Hazarika Ali Road

1110

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, complete as per drawing and approved technical specification. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

1600

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. For T beam and slab, 1) Height up to 5.0 m. i) Br. No. 2/1 on Mohan Hazarika Ali Road

94.29

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. For T beam and slab, 2) Height 5.0m to 10.0 m Br. No. 3/1 Bhulaguri Borchapori Road

74.68

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. E. RCC Grade M-40, For T beam and slab 1) Height up to 5.0 m i) Br. No. 2/1 on Mohan Hazarika Ali Road

11.48

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. E. RCC Grade M-35, For T beam and slab 1) Height up to 5.0 m ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

18.55

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. E. RCC Grade M-35, For I-beam & slab including launching of precast girders by launching truss upto 40 m span 1) Height 5.0 m to 10.0 m ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

112.52

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Mohan Hazarika Ali Road

21.96

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

30.87

-

-

... More
High tensile steel wires / strands including all accessories for stressing , stressing operations and grouting complete as per drawing and technical specifications. Br. No. 3/1 Bhulaguri Borchapori Road

4.86

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Br. No. 2/1 on Mohan Hazarika Ali Road

16.29

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

22.14

-

-

... More
Drainage Spouts complete as per drawing and Technical specification i) Br. No. 2/1 on Mohan Hazarika Ali Road

8

-

-

... More
Drainage Spouts complete as per drawing and Technical specification ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

12

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification i) Br. No. 2/1 on Mohan Hazarika Ali Road

8.05

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

8.05

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Mohan Hazarika Ali Road

15.65

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

15.65

-

-

... More
Providing Strip Seal Expansion Joint to cater movement of +70mm as per drawing. i) Br. No. 2/1 on Mohan Hazarika Ali Road

16.9

-

-

... More
Providing Strip Seal Expansion Joint to cater movement of +70mm as per drawing. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

16.9

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 i) Br. No. 2/1 on Mohan Hazarika Ali Road

63.07

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

56.16

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (i) Stone/Boulder i) Br. No. 2/1 on Mohan Hazarika Ali Road

189.21

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (i) Stone/Boulder ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

168.48

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 i) Br. No. 2/1 on Mohan Hazarika Ali Road

196.69

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

367.54

-

-

... More
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material . I) In Ordinary Soil. B. Mechanical means. i) Depth up to 3.00 m (with dewatering) i) Br. No. 2/1 on Mohan Hazarika Ali Road

99.46

-

-

... More
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material . I) In Ordinary Soil. B. Mechanical means. i) Depth up to 3.00 m (with dewatering) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

85.25

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser. A. PCC Grade M15. i) Br. No. 2/1 on Mohan Hazarika Ali Road

9.32

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser. A. PCC Grade M15. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

7.99

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser. G RCC Grade M30 (i) Using Concrete Mixer i) Br. No. 2/1 on Mohan Hazarika Ali Road

31.92

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser. G RCC Grade M30 (i) Using Concrete Mixer ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

21.9

-

-

... More
Supplying, fitting and placing uncoated TMT Bar reinforcement in foundation complete as per drawing and Technical Specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Mohan Hazarika Ali Road

2.36

-

-

... More
Supplying, fitting and placing uncoated TMT Bar reinforcement in foundation complete as per drawing and Technical Specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

1.7

-

-

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. H) a) RCC Grade M 35 I) Height up to 5.0 m Case-I : Using Concrete Mixer i) Br. No. 2/1 on Mohan Hazarika Ali Road

38.22

-

-

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. H) a) RCC Grade M 35 I) Height up to 5.0 m Case-I : Using Concrete Mixer ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

24.55

-

-

... More
Supplying, fitting and placing TMT bars reinforcement in substructure complete as per drawing and Technical Specifications b) (i) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Mohan Hazarika Ali Road

5.03

-

-

... More
Supplying, fitting and placing TMT bars reinforcement in substructure complete as per drawing and Technical Specifications b) (i) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

3.58

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. i) Br. No. 2/1 on Mohan Hazarika Ali Road

36

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

40

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br. No. 2/1 on Mohan Hazarika Ali Road

46.62

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

37.8

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (a) from private land i) Br. No. 2/1 on Mohan Hazarika Ali Road

1281.78

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (a) from private land ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

5350.53

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (a) from private land i) Br. No. 2/1 on Mohan Hazarika Ali Road

1058.21

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (a) from private land ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

907.06

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.A)By Mix in Place Method (ii) for grading- II Material i) Br. No. 2/1 on Mohan Hazarika Ali Road

162.23

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.A)By Mix in Place Method (ii) for grading- II Material ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

149.63

-

-

... More
WBM Grading 2 (A) Using stone screening Type-B 11.2 mm for Gr.II (II) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.(b) Manual means i) Br. No. 2/1 on Mohan Hazarika Ali Road

75.94

-

-

... More
WBM Grading 2 (A) Using stone screening Type-B 11.2 mm for Gr.II (II) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.(b) Manual means ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

70.31

-

-

... More
WBM Grading 3, Using stone screening Type-B 11.2 mm for Gr.III (III) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (b) By Manual Means i) Br. No. 2/1 on Mohan Hazarika Ali Road

75.94

-

-

... More
WBM Grading 3, Using stone screening Type-B 11.2 mm for Gr.III (III) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (b) By Manual Means ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

70.31

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.(i) Including Edge block/ Edge restraints i) Br. No. 2/1 on Mohan Hazarika Ali Road

1012.5

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.(i) Including Edge block/ Edge restraints ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

936.2

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309 i) Br. No. 2/1 on Mohan Hazarika Ali Road

2683.28

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309 ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

2683.28

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (i) 600mm equilateral triangle i) Br. No. 2/1 on Mohan Hazarika Ali Road

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (i) 600mm equilateral triangle ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (ii) 800mm x 600mm rectangular i) Br. No. 2/1 on Mohan Hazarika Ali Road

8

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (ii) 800mm x 600mm rectangular ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

8

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (iii) 600mm circular i) Br. No. 2/1 on Mohan Hazarika Ali Road

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (iii) 600mm circular ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

4

-

-

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) i) Br. No. 2/1 on Mohan Hazarika Ali Road

80

-

-

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

80

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department i) Br. No. 2/1 on Mohan Hazarika Ali Road

20

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

40

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification. ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

50

-

-

... More
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for one year.side trackway with earth topping complete as per direction of the department i) Br. No. 2/1 on Mohan Hazarika Ali Road

6

-

-

... More
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for one year.side trackway with earth topping complete as per direction of the department ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) i) Br. No. 2/1 on Mohan Hazarika Ali Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Air quality monitoring at 3 locations for 2 seasons for 1 year (operation Stage) i) Br. No. 2/1 on Mohan Hazarika Ali Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Air quality monitoring at 3 locations for 2 seasons for 1 year (operation Stage) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) i) Br. No. 2/1 on Mohan Hazarika Ali Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Water quality monitoring at 3 locations for 2 seasons for 1 year (operation Stage) i) Br. No. 2/1 on Mohan Hazarika Ali Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Water quality monitoring at 3 locations for 2 seasons for 1 year (operation Stage) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) i) Br. No. 2/1 on Mohan Hazarika Ali Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Noise quality monitoring at 3 locations for 2 seasons for 1 year (operation Stage) i) Br. No. 2/1 on Mohan Hazarika Ali Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Noise quality monitoring at 3 locations for 2 seasons for 1 year (operation Stage) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) i) Br. No. 2/1 on Mohan Hazarika Ali Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Soil quality monitoring at 3 locations for 2 seasons for 1 year (operation Stage) i) Br. No. 2/1 on Mohan Hazarika Ali Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Soil quality monitoring at 3 locations for 2 seasons for 1 year (operation Stage) ii) Br. No. 3/1 on Bhulaguri to Borchapori Road

6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.