Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date20 Jan 2024
Closing Date19 Feb 2024
Tender Amount₹ 2,24,83,000 
Notes
Download

Costs

Summary

Construction Of Bridge In Darrang District I. Br. No. 1/1 On Khairakata Borgarah Tea Estate Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of subgrade and earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreaing, grading to required slope and compacted to meet requirement of Table 300.2 with all lead as per Technical Specification Clause 303.1 i. Private Land

607.7

-

-

... More
Construction of granular sub-base by providing well grade material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II Material

241.32

-

-

... More
Providing, laying spreading and compacting stone aggregate of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of coarse aggregate, watering and compacting to the required density Grading-2 & Grading -3 as per Technical specification Clause 405 For Grading II Material

82.38

-

-

... More
For Grading III Material

82.38

-

-

... More
Providing and laying of interlocking concrete block pavement with M40 grade of concrete blocks having thickness 80mm as per drawing and technical specification clause 1504 complete including carriage. A) Including Edge block/ Edge restraints.

1071.6

-

-

... More
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx600mmx600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 a) 600mm Equilateral triangle

2

-

-

... More
b) 600mm Circular

2

-

-

... More
c) 600mm x 450mm Rectangular

2

-

-

... More
Providing and fixing of typical informatory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75mm of 12 SWG sheet tubes posts duly embeded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

1

-

-

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications.

6.62

-

-

... More
Providing and fixing of road stud 100x100 mm die cast in aluminium, restant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic suface by drilling holes 30 mm upto a depth of 600mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973

8

-

-

... More
Reinforced cement concrete M15 grade of boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering as per drawing and technical specification clause 1704.

32

-

-

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810

80

-

-

... More
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling the excavated tearth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Upto 3m depth

300.9

-

-

... More
MS Liner for bored cat in situ concrete pile (Providing and installing 6mm MS liner for bored cast in situ concrete pile including applying protective coating as per drawing and technical specification and as directed by Engineer in Charge.

9.8

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (from Primary Producer: TATA/ SAIL/ Esser Steel/ Jindal steel/ Shyam steel/ RINL) in foundation complete as per drawings and technical specifications clauses 1000 & 1202.

27.74

-

-

... More
Bored cast-in-situ M35 grade RCC pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and leads (Pile diameter-1200mm)

180

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911 (Part-IV) a) Initial and Routine load test

1000

-

-

... More
b) Lateral load test

100

-

-

... More
Integrity testing of pile using low strain/sonic integrity test/Sonic echo test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust, & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-In-Charge. Note: The inclusion of the above them them to the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project.

4

-

-

... More
Levelling course for Pile cap

8.08

-

-

... More
Providing concrete for Plain/Reinforced concrete, in open foundations complete as per drawing and technical specifications Clause 802,803, 1202 & 1203 PCC grade M15

7.2

-

-

... More
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical specification. RCC M35

159.73

-

-

... More
Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications including steel shuttering formwork. RCC Grade M 30 Without plasticiser Using concrete mixture

34.66

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

13.1

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

26

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. Height up to 5m Well Curb RCC M35 Grade

75.09

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. Height up to 5m Well Steining RCC M30 Grade

37.44

-

-

... More
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. Height 5m to 10m Well Steining RCC M30 Grade

9.11

-

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MORT&H specifications complete including all accessories as per drawing and Technical Specifications.

62400

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification

110.06

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (from Primary Producer: TATA/ SAIL/ Esser Steel/ Jindal steel/ Shyam steel/ RINL) in superstructure complete as per drawings and technical specifications clauses 1002, 1010 & 1202.

27.99

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification including steel shuttering formwork Height up to 5m RCC GIRDERS & Slab M-35

155.27

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Clause 1204.3.8.(Granular material)

68.39

-

-

... More
Drainage Spouts complete as per drawing and Technical specifications.

10

-

-

... More
Elastomeric Slab Seal Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specification to be installed by the manufacture / supplier or their authorisedrepresentative ensuring compliance to the manufacturers instructios for nstallation and clause 2506 of MORTS&H specification of bridge works.)

15

-

-

... More
PCC M15 ordinary grade (1:2.5:5) leveling course below approach slab complete as per drawing and Technical specification clause 800 and 1211. A With Crusher Stone I Nominal Mix (1:2.5:5)

7.54

-

-

... More
Reinforced cement concrete M25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications.[TMT-IS 1786 (Fe-500D) Primary Producer (TATA/SAIL/Esser Steel/Jindal panther steel/Shyam steel or equivalent)].

15.75

-

-

... More
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade Concrete with HYSD Reinforcement conforming to IRC:21 and dowel bar 25mm dia, asphalt filler board, keyed to the structure on whih it is built and installed as per design given in the enclouser to MORT&H circular no. RW/NH-33022/1/94-DO IIIdated June 1994 as per dimension in the approved drawing and at location directed by teh engineer, all as specified. M 40 grade concrete

86.57

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per rawing and Technical Specifications

18.64

-

-

... More
Painting Two Coats on New Concrete Surfaces Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces as per drawing and technical specification Clause 1701

220.93

-

-

... More
Non-destructive testing with Ultrasonic Pulse velocity Meter with Data Storage facility for detection of cracks voids and other imperfections in Reinforced concrete structures and furnishing the finding thereof in proper comprehensible format complete as directed by the Department.

2

-

-

... More
Non-destructive testing with Rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the finding in proper comprehensible format .

2

-

-

... More
Load testing of one or more spans of bridge as elected by the Engineer as per approved load test procedure following relevant IS/IRC / Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. completeas required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/ loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span ( Extra for every increase of 100.00mt. or part there for in the span load capacity up to 800.00 mt.

1

-

-

... More
Providing and laying one layer of Non-Woven geotextile of minimum mass per unit area of 280gms/sqm.having minimum roll width of 5.0m treated with carbon black with physical properties as given in clause no 702.2.3. over 25mm thick compacted sand layer on a prepared subgrade as a filter media with necessary overlaps as per drawing and technical specification and as directed by the Engineer in charge complete.

1266.82

-

-

... More
Providing and laying Pitching on slopes laid over prepared filter media as per drawing and Technical specifications. Stone/Boulder

122.91

-

-

... More
Providing and laying boulder apron laid in wire crateswith4mmdiaGIwireconformingtoIS:280 and IS:4826 in 100mmx100mmmesh (woven diagonally)including10percentextraforlapsand joints laid with stone boulders weighing not less than 25kg each as per drawing and technical specification Clause 1301.

279.79

-

-

... More
Planting of trees and their Maintenance for three year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/ sludge mannure, planting the saplings, backfilling the trenches, watering, fixing the tree guard and maintaining the plants for three year.

20

-

-

... More
Implementation of Environmental and Social Management Plan Ambient Air Monitoring: At pre-construction Stage: At minimum 2 locations (twice a week)

4

-

-

... More
Implementation of Environmental and Social Management Plan Ambient Air Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Two consecutive day) (Twice a week) (Biannually) for one year

8

-

-

... More
Implementation of Environmental and Social Management Plan Ambient Air Monitoring: At Operation Stage: At 2 locations (Two consecutive day) (Twice a week) (Biannually) for one year.

8

-

-

... More
Implementation of Environmental and Social Management Plan Ambient Water Monitoring: At pre-construction Stage: At minimum 2 locations (2 samples)

2

-

-

... More
Implementation of Environmental and Social Management Plan Water Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year.

4

-

-

... More
Implementation of Environmental and Social Management Plan Water Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually).

4

-

-

... More
Implementation of Environmental and Social Management Plan Ambient Noise Monitoring: At Pre-Construction Stage At minimum 2 locations

2

-

-

... More
Implementation of Environmental and Social Management PlanNoise Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year.

4

-

-

... More
Implementation of Environmental and Social Management PlanNoise Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually).

4

-

-

... More
Implementation of Environmental and Social Management Plan Ambient Soil Monitoring At Pre-Construction Stage: At minimum 2 locations

2

-

-

... More
Implementation of Environmental and Social Management Plan Soil Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year.

4

-

-

... More
Implementation of Environmental and Social Management Plan Soil Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually).

4

-

-

... More
Implementation of Environmental and Social Management Plan Ecology: At Construction Stage: At 2 locations (Biannually) for one year.

4

-

-

... More
Implementation of Environmental and Social Management Plan Ecology: At Operation Stage: At 2 locations (Biannually)

4

-

-

... More
Community meetings in village, 2 times.

2

-

-

... More
A Provisional sum (Fixed Amount) for the items of Utility Shifting & Tree cutting afforestation of Rs. 3,26,124.00 (not to be changed by the Bidders in BOQ)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.