Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date4 Mar 2024
Closing Date10 Apr 2024
Tender Amount₹ 5,09,84,000 
Notes
Download

Costs

Summary

Construction Of Bridges In Biswanath District I.br. No. 6/2 On Rampur Road Ii.br. No. 1/1 On Rongajan Nahorbari Link Road Iii. Br. No. 1/1 On Borjaroni Monabari Link Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment, including trimming bottom and side slopes in accrodance with requirements of lines, grades and cross-sections. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

180.87

-

-

... More
Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment, including trimming bottom and side slopes in accrodance with requirements of lines, grades and cross-sections. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

14.52

-

-

... More
Construction of embankment with approved material obtained from borrow pits with all lift , transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with all leads & lifts as per Technical Specification Clause 301.5 i. Private Land ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

5791.3

-

-

... More
Construction of embankment with approved material obtained from borrow pits with all lift , transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with all leads & lifts as per Technical Specification Clause 301.5 i. Private Land i) Br. No. 6/2 on Rampur Road

5621.77

-

-

... More
Construction of embankment with approved material obtained from borrow pits with all lift , transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with all leads & lifts as per Technical Specification Clause 301.5 i. Private Land iii)Br. No. 1/1 on Borjaroni Monabari Link Road

2967.03

-

-

... More
Construction of subgrade and earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreaing, grading to required slope and compacted to meet requirement of Table 300.2 with all lead as per Technical Specification Clause 303.1 i. Private Land ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

733.84

-

-

... More
Construction of subgrade and earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreaing, grading to required slope and compacted to meet requirement of Table 300.2 with all lead as per Technical Specification Clause 303.1 i. Private Land i) Br. No. 6/2 on Rampur Road

520.65

-

-

... More
Construction of subgrade and earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreaing, grading to required slope and compacted to meet requirement of Table 300.2 with all lead as per Technical Specification Clause 303.1 i. Private Land iii)Br. No. 1/1 on Borjaroni Monabari Link Road

668.07

-

-

... More
Construction of granular sub-base by providing well grade material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II Material ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

290.4

-

-

... More
Construction of granular sub-base by providing well grade material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II Material i) Br. No. 6/2 on Rampur Road

207.83

-

-

... More
Construction of granular sub-base by providing well grade material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II Material iii)Br. No. 1/1 on Borjaroni Monabari Link Road

262.41

-

-

... More
Providing, laying spreading and compacting stone aggregate of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of coarse aggregate, watering and compacting to the required density Grading-2 & Grading -3 as per Technical specification Clause 405 For Grading II Material ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

98.89

-

-

... More
Providing, laying spreading and compacting stone aggregate of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of coarse aggregate, watering and compacting to the required density Grading-2 & Grading -3 as per Technical specification Clause 405 For Grading II Material i) Br. No. 6/2 on Rampur Road

71.21

-

-

... More
Providing, laying spreading and compacting stone aggregate of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of coarse aggregate, watering and compacting to the required density Grading-2 & Grading -3 as per Technical specification Clause 405 For Grading II Material iii)Br. No. 1/1 on Borjaroni Monabari Link Road

94.44

-

-

... More
Providing, laying spreading and compacting stone aggregate of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of coarse aggregate, watering and compacting to the required density Grading-2 & Grading -3 as per Technical specification Clause 405 For Grading III Material ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

98.89

-

-

... More
Providing, laying spreading and compacting stone aggregate of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of coarse aggregate, watering and compacting to the required density Grading-2 & Grading -3 as per Technical specification Clause 405 For Grading III Material i) Br. No. 6/2 on Rampur Road

71.21

-

-

... More
Providing, laying spreading and compacting stone aggregate of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of coarse aggregate, watering and compacting to the required density Grading-2 & Grading -3 as per Technical specification Clause 405 For Grading III Material iii)Br. No. 1/1 on Borjaroni Monabari Link Road

94.44

-

-

... More
Providing and laying of interlocking concrete block pavement with M40 grade of concrete blocks having thickness 80mm as per drawing and technical specification clause 1504 complete including carriage.A) Including Edge block/ Edge restraints. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

1286.03

-

-

... More
Providing and laying of interlocking concrete block pavement with M40 grade of concrete blocks having thickness 80mm as per drawing and technical specification clause 1504 complete including carriage.A) Including Edge block/ Edge restraints. i) Br. No. 6/2 on Rampur Road

926.59

-

-

... More
Providing and laying of interlocking concrete block pavement with M40 grade of concrete blocks having thickness 80mm as per drawing and technical specification clause 1504 complete including carriage.A) Including Edge block/ Edge restraints. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

1212.54

-

-

... More
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx600mmx600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 a) 600mm Equilateral triangle ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

2

-

-

... More
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx600mmx600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 a) 600mm Equilateral triangle i) Br. No. 6/2 on Rampur Road

2

-

-

... More
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx600mmx600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 a) 600mm Equilateral triangle iii)Br. No. 1/1 on Borjaroni Monabari Link Road

2

-

-

... More
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx600mmx600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 b) 600mm Circular i)Rongajan Nahorbari Link Road (Bridge No. -1/1) ( 1 x 18 )

2

-

-

... More
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx600mmx600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 b) 600mm Circular i) Br. No. 6/2 on Rampur Road

2

-

-

... More
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx600mmx600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 b) 600mm Circular iii)Br. No. 1/1 on Borjaroni Monabari Link Road

2

-

-

... More
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx600mmx600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 c) 600mm x 450mm Rectangular ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

2

-

-

... More
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx600mmx600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 c) 600mm x 450mm Rectangular i) Br. No. 6/2 on Rampur Road

2

-

-

... More
Providing and fixing of retro-reflecorised cautionary, mandatory nad informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx600mmx600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 c) 600mm x 450mm Rectangular iii)Br. No. 1/1 on Borjaroni Monabari Link Road

2

-

-

... More
Providing and fixing of typical informatory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75mm of 12 SWG sheet tubes posts duly embeded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

1

-

-

... More
Providing and fixing of typical informatory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75mm of 12 SWG sheet tubes posts duly embeded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 i) Br. No. 6/2 on Rampur Road

1

-

-

... More
Providing and fixing of typical informatory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75mm of 12 SWG sheet tubes posts duly embeded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

1

-

-

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

5.82

-

-

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications. i) Br. No. 6/2 on Rampur Road

6.62

-

-

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

4.68

-

-

... More
Providing and fixing of road stud 100x100 mm die cast in aluminium, restant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic suface by drilling holes 30 mm upto a depth of 600mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973 ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

8

-

-

... More
Providing and fixing of road stud 100x100 mm die cast in aluminium, restant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic suface by drilling holes 30 mm upto a depth of 600mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973 i) Br. No. 6/2 on Rampur Road

8

-

-

... More
Providing and fixing of road stud 100x100 mm die cast in aluminium, restant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic suface by drilling holes 30 mm upto a depth of 600mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

6

-

-

... More
Reinforced cement concrete M15 grade of boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering as per drawing and technical specification clause 1704. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

38

-

-

... More
Reinforced cement concrete M15 grade of boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering as per drawing and technical specification clause 1704. i) Br. No. 6/2 on Rampur Road

26

-

-

... More
Reinforced cement concrete M15 grade of boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering as per drawing and technical specification clause 1704. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

30

-

-

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

80

-

-

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 i) Br. No. 6/2 on Rampur Road

80

-

-

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

80

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonary, cement concrete, wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantling material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m as per Technical Specification Clause 202. II By Mechanical Means (B) Reinforced Cement Concrete ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

7.05

-

-

... More
Labour for taking out old piles of timber bridge with necessary sacffolding, jati bamboos, jumper ropes etc., complete and stacking them at suitable places as directed. i) Br. No. 6/2 on Rampur Road

16

-

-

... More
Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) i) Br. No. 6/2 on Rampur Road

18.2

-

-

... More
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling the excavated tearth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Upto 3m depth ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

101.99

-

-

... More
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling the excavated tearth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Upto 3m depth i) Br. No. 6/2 on Rampur Road

347.31

-

-

... More
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling the excavated tearth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Upto 3m depth iii)Br. No. 1/1 on Borjaroni Monabari Link Road

326.51

-

-

... More
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling the excavated tearth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil 3m to 6m depth i) Br. No. 6/2 on Rampur Road

13.02

-

-

... More
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling the excavated tearth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil 3m to 6m depth iii)Br. No. 1/1 on Borjaroni Monabari Link Road

10.02

-

-

... More
MS Liner for bored cat in situ concrete pile (Providing and installing 6mm MS liner for bored cast in situ concrete pile including applying protective coating as per drawing and technical specification and as directed by Engineer in Charge. i) Br. No. 6/2 on Rampur Road

7.31

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (from Primary Producer: TATA/ SAIL/ Esser Steel/ Jindal steel/ Shyam steel/ RINL) in foundation complete as per drawings and technical specifications clauses 1000 & 1202. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

18.13

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (from Primary Producer: TATA/ SAIL/ Esser Steel/ Jindal steel/ Shyam steel/ RINL) in foundation complete as per drawings and technical specifications clauses 1000 & 1202. i) Br. No. 6/2 on Rampur Road

25.83

-

-

... More
Bored cast-in-situ M35 grade RCC pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and leads (Pile diameter 1200mm). i) Br. No. 6/2 on Rampur Road

144

-

-

... More
Bored cast-in-situ M35 grade RCC pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and leads (Pile diameter1000mm). ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

120

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911 (Part-IV) (a) Initial and Routine load test i) Br. No. 6/2 on Rampur Road

1000

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911 (Part-IV) (a) Initial and Routine load test ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

1000

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911 (Part-IV) (b) Lateral load test i) Br. No. 6/2 on Rampur Road

100

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911 (Part-IV) (b) Lateral load test ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

100

-

-

... More
Integrity testing of pile using low strain/sonic integrity test/Sonic echo test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust, & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of EngineerIn-Charge. Note: The inclusion of the above them them to the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. i) Br. No. 6/2 on Rampur Road

4

-

-

... More
Integrity testing of pile using low strain/sonic integrity test/Sonic echo test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust, & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer In-Charge. Note: The inclusion of the above them them to the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Levelling course for Pile cap ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

3.53

-

-

... More
Levelling course for Pile cap i) Br. No. 6/2 on Rampur Road

8.08

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material iii)Br. No. 1/1 on Borjaroni Monabari Link Road

83.64

-

-

... More
Providing concrete for plain/ Reinforced Concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 With Crushed Stone PCC Grade M-15 Nominal mix (1:2.5:5) ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

5.55

-

-

... More
Providing concrete for plain/ Reinforced Concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 With Crushed Stone PCC Grade M-15 Nominal mix (1:2.5:5) i) Br. No. 6/2 on Rampur Road

8.71

-

-

... More
Providing concrete for plain/ Reinforced Concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 With Crushed Stone PCC Grade M-15 Nominal mix (1:2.5:5) iii)Br. No. 1/1 on Borjaroni Monabari Link Road

16.99

-

-

... More
Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications including steel shuttering formwork. I - Without Plasticiser A - PCC Grade M-15 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

49.2

-

-

... More
Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a filter media base of 500 mm x 500 mm as per drawing and technical specifications clauses 1205.5.7. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

24

-

-

... More
Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications including steel shuttering formwork. RCC Grade M 35 Without plasticiser Using concrete mixture iii)Br. No. 1/1 on Borjaroni Monabari Link Road

65.16

-

-

... More
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical specification.Using Concrete Mixer ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

112.23

-

-

... More
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical specification.Using Concrete Mixer i) Br. No. 6/2 on Rampur Road

159.73

-

-

... More
Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications including steel shuttering formwork. Without plasticiser Using Concrete Mixer ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

24.35

-

-

... More
Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications including steel shuttering formwork. Without plasticiser Using Concrete Mixer i) Br. No. 6/2 on Rampur Road

43.1

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) creinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

7.2

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) creinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 i) Br. No. 6/2 on Rampur Road

15.71

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

11

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 i) Br. No. 6/2 on Rampur Road

34

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

20

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. Height up to 5m RCC M35 Grade  ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

29.19

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. Height up to 5m RCC M35 Grade i) Br. No. 6/2 on Rampur Road

96.78

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. Height up to 5m RCC M35 Grade iii)Br. No. 1/1 on Borjaroni Monabari Link Road

77.48

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. Height up to 5m Using concrete mixture RCC Grade M30  ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

27.86

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. Height up to 5m Using concrete mixture RCC Grade M30 i) Br. No. 6/2 on Rampur Road

45.75

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. Height 5m to 10m Using concrete mixture i) Br. No. 6/2 on Rampur Road

17.54

-

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MORT&H specifications complete including all accessories as per drawing and Technical Specifications.  ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

62400

-

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MORT&H specifications complete including all accessories as per drawing and Technical Specifications.  i) Rampur Road (Bridge No. 6/2) ( 1 x 24 )

62400

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification.A Granular Material iii)Br. No. 1/1 on Borjaroni Monabari Link Road

170.29

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification  ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

63.24

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification i) Br. No. 6/2 on Rampur Road

137.02

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification iii)Br. No. 1/1 on Borjaroni Monabari Link Road

37.35

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (from Primary Producer: TATA/ SAIL/ Esser Steel/ Jindal steel/ Shyam steel/ RINL) in superstructure complete as per drawings and technical specifications clauses 1002, 1010 & 1202. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

16.7

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (from Primary Producer: TATA/ SAIL/ Esser Steel/ Jindal steel/ Shyam steel/ RINL) in superstructure complete as per drawings and technical specifications clauses 1002, 1010 & 1202. i) Br. No. 6/2 on Rampur Road

25.38

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (from Primary Producer: TATA/ SAIL/ Esser Steel/ Jindal steel/ Shyam steel/ RINL) in superstructure complete as per drawings and technical specifications clauses 1002, 1010 & 1202. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

12.68

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification including steel shuttering formwork Without Plasticiser Height 5m to 10m RCC/PSC Grade M35 ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

122.8

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification including steel shuttering formwork Without Plasticiser Height 5m to 10m RCC/PSC Grade M35 i) Br. No. 6/2 on Rampur Road

155.27

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification including steel shuttering formwork Without Plasticiser Height 5m to 10m RCC/PSC Grade M35 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

60.79

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Clause 1204.3.8.(Granular material) ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

24.78

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Clause 1204.3.8.(Granular material) i) Br. No. 6/2 on Rampur Road

75.01

-

-

... More
Drainage Spouts complete as per drawing and Technical specifications. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

8

-

-

... More
Drainage Spouts complete as per drawing and Technical specifications. i) Br. No. 6/2 on Rampur Road

10

-

-

... More
Elastomeric Slab Seal Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specification to be installed by the manufacture / supplier or their authorisedrepresentative ensuring compliance to the manufacturers instructios for nstallation and clause 2506 of MORTS&H specification of bridge works.) ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

15

-

-

... More
Elastomeric Slab Seal Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specification to be installed by the manufacture / supplier or their authorisedrepresentative ensuring compliance to the manufacturers instructios for nstallation and clause 2506 of MORTS&H specification of bridge works.) i) Br. No. 6/2 on Rampur Road

15

-

-

... More
PCC M15 ordinary grade (1:2.5:5) leveling course below approach slab complete as per drawing and Technical specification clause 800 and 1211. A With Crusher Stone I Nominal Mix (1:2.5:5) ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

7.54

-

-

... More
PCC M15 ordinary grade (1:2.5:5) leveling course below approach slab complete as per drawing and Technical specification clause 800 and 1211. A With Crusher Stone I Nominal Mix (1:2.5:5) i) Br. No. 6/2 on Rampur Road

7.54

-

-

... More
PCC M15 ordinary grade (1:2.5:5) leveling course below approach slab complete as per drawing and Technical specification clause 800 and 1211. A With Crusher Stone I Nominal Mix (1:2.5:5) iii)Br. No. 1/1 on Borjaroni Monabari Link Road

7.54

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and technical specifications . (a) TMT-IS 1786 (Fe-500D) Primary Producer (TATA/ SAIL/ Esser Steel/Jindal panther steel/Shyam steel or equivalent) ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

15.75

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and technical specifications . (a) TMT-IS 1786 (Fe-500D) Primary Producer (TATA/ SAIL/ Esser Steel/Jindal panther steel/Shyam steel or equivalent) i) Br. No. 6/2 on Rampur Road

15.75

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and technical specifications . (a) TMT-IS 1786 (Fe-500D) Primary Producer (TATA/ SAIL/ Esser Steel/Jindal panther steel/Shyam steel or equivalent) iii)Br. No. 1/1 on Borjaroni Monabari Link Road

15.75

-

-

... More
Drainage Spouts complete as per drawing and Technical specifications. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

7

-

-

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

17

-

-

... More
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade Concrete with HYSD Reinforcement conforming to IRC:21 and dowel bar 25mm dia, asphalt filler board, keyed to the structure on whih it is built and installed as per design given in the enclouser to MORT&H circular no. RW/NH-33022/1/94-DO IIIdated June 1994 as per dimension in the approved drawing and at location directed by teh engineer, all as specified. M 40 grade concrete ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

75.4

-

-

... More
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade Concrete with HYSD Reinforcement conforming to IRC:21 and dowel bar 25mm dia, asphalt filler board, keyed to the structure on whih it is built and installed as per design given in the enclouser to MORT&H circular no. RW/NH-33022/1/94-DO IIIdated June 1994 as per dimension in the approved drawing and at location directed by teh engineer, all as specified. M 40 grade concrete i) Br. No. 6/2 on Rampur Road

86.41

-

-

... More
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade Concrete with HYSD Reinforcement conforming to IRC:21 and dowel bar 25mm dia, asphalt filler board, keyed to the structure on whih it is built and installed as per design given in the enclouser to MORT&H circular no. RW/NH-33022/1/94-DO IIIdated June 1994 as per dimension in the approved drawing and at location directed by teh engineer, all as specified. M 40 grade concrete iii)Br. No. 1/1 on Borjaroni Monabari Link Road

56.19

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per rawing and Technical Specifications ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

15.27

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per rawing and Technical Specifications i) Br. No. 6/2 on Rampur Road

18.64

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per rawing and Technical Specifications iii)Br. No. 1/1 on Borjaroni Monabari Link Road

13.16

-

-

... More
Painting Two Coats on New Concrete Surfaces Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces as per drawing and technical specification Clause 1701 ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

191.84

-

-

... More
Painting Two Coats on New Concrete Surfaces Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces as per drawing and technical specification Clause 1701 i) Br. No. 6/2 on Rampur Road

220.78

-

-

... More
Painting Two Coats on New Concrete Surfaces Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces as per drawing and technical specification Clause 1701 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

149.69

-

-

... More
Non-destructive testing with Ultrasonic Pulse velocity Meter with Data Storage facility for detection of cracks voids and other imperfections in Reinforced concrete structures and furnishing the finding thereof in proper comprehensible format complete as directed by the Department.  ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Non-destructive testing with Ultrasonic Pulse velocity Meter with Data Storage facility for detection of cracks voids and other imperfections in Reinforced concrete structures and furnishing the finding thereof in proper comprehensible format complete as directed by the Department. i) Br. No. 6/2 on Rampur Road

2

-

-

... More
Non-destructive testing with Ultrasonic Pulse velocity Meter with Data Storage facility for detection of cracks voids and other imperfections in Reinforced concrete structures and furnishing the finding thereof in proper comprehensible format complete as directed by the Department. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

1

-

-

... More
Non-destructive testing with Rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the finding in proper comprehensible format .  ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Non-destructive testing with Rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the finding in proper comprehensible format . i) Br. No. 6/2 on Rampur Road

2

-

-

... More
Non-destructive testing with Rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the finding in proper comprehensible format . iii)Br. No. 1/1 on Borjaroni Monabari Link Road

1

-

-

... More
Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC / Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. completeas required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/ loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span ( Extra for every increase of 100.00mt. or part there for in the span load capacity up to 800.00 mt.  ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

1

-

-

... More
Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC / Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. completeas required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/ loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span ( Extra for every increase of 100.00mt. or part there for in the span load capacity up to 800.00 mt. i) Br. No. 6/2 on Rampur Road

1

-

-

... More
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling with approved material. Ordinary Soil Mechanical means With Dewatering Upto 3m depth iii)Br. No. 1/1 on Borjaroni Monabari Link Road

460.45

-

-

... More
Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification clause 1303 (Flooring should consist of 150 mm thick flat stone/bricks on edge in cement mortar 1:3 laid over 300 mm thick cement concrete M20 grade laid over a layer of 150 mm thick cement concrete M15 grade) I Rubble stone laid in cement mortar 1:3 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

18.96

-

-

... More
Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications including steel shuttering formwork. I - Without Plasticiser B - PCC Grade M-20 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

75.84

-

-

... More
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 25 kg beyond curtain wall iii)Br. No. 1/1 on Borjaroni Monabari Link Road

85.32

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specifications Clause 802, 803, 1202 & 1203. With Crushed Stone PCC Grade M-15 Nominal mix (1:2.5:5) iii)Br. No. 1/1 on Borjaroni Monabari Link Road

30.37

-

-

... More
Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications including steel shuttering formwork. I - Without Plasticiser A - PCC Grade M-15 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

70.74

-

-

... More
Providing and laying one layer of Non-Woven geotextile of minimum mass per unit area of 280gms/sqm.having minimum roll width of 5.0m treated with carbon black with physical properties as given in clause no 702.2.3. over 25mm thick compacted sand layer on a prepared subgrade as a filter media with necessary overlaps as per drawing and technical specification and as directed by the Engineer in charge complete. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

609.94

-

-

... More
Providing and laying one layer of Non-Woven geotextile of minimum mass per unit area of 280gms/sqm.having minimum roll width of 5.0m treated with carbon black with physical properties as given in clause no 702.2.3. over 25mm thick compacted sand layer on a prepared subgrade as a filter media with necessary overlaps as per drawing and technical specification and as directed by the Engineer in charge complete. i) Br. No. 6/2 on Rampur Road

1357.04

-

-

... More
Providing and laying one layer of Non-Woven geotextile of minimum mass per unit area of 280gms/sqm.having minimum roll width of 5.0m treated with carbon black with physical properties as given in clause no 702.2.3. over 25mm thick compacted sand layer on a prepared subgrade as a filter media with necessary overlaps as per drawing and technical specification and as directed by the Engineer in charge complete. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

265.16

-

-

... More
Providing and laying Pitching on slopes laid over prepared filter media as per drawing and Technical specifications. Stone/Boulder ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

79.4

-

-

... More
Providing and laying Pitching on slopes laid over prepared filter media as per drawing and Technical specifications. Stone/Boulder i) Br. No. 6/2 on Rampur Road

141.57

-

-

... More
Providing and laying Pitching on slopes laid over prepared filter media as per drawing and Technical specifications. Stone/Boulder iii)Br. No. 1/1 on Borjaroni Monabari Link Road

79.55

-

-

... More
Providing and laying boulder apron laid in wire crateswith4mmdiaGIwireconformingtoIS:280 and IS:4826 in 100mmx100mmmesh (woven diagonally) including 10 percent extra for lapsand joints laid with stone boulders weighing not less than 25kg each as per drawing and technical specification Clause 1301. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

121.6

-

-

... More
Providing and laying boulder apron laid in wire crateswith4mmdiaGIwireconformingtoIS:280 and IS:4826 in 100mmx100mmmesh (woven diagonally) including 10 percent extra for lapsand joints laid with stone boulders weighing not less than 25kg each as per drawing and technical specification Clause 1301.i) Br. No. 6/2 on Rampur Road

320.03

-

-

... More
Excavation for Structures (Earthwork in excavation for foundation of structures as per drawing and technical specifications 304. including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom, backfilling with approved material. Ordinary soil Mechanical Means With dewatering Depth upto 3 m iii)Br. No. 1/1 on Borjaroni Monabari Link Road

48.66

-

-

... More
Providing concrete for Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications Clause 802,803, 1202 & 1203. With crushed Stone PCC grade M10 Nominal Mix (1:2.5:5) iii)Br. No. 1/1 on Borjaroni Monabari Link Road

6.95

-

-

... More
Plain/Reinforced cement concrete, in open foundations complete as per drawing and technical specifications 1500,1700 & 2100 including steel shuttering formwork. Without plasticiser PCC Grade M 15 iii)Br. No. 1/1 on Borjaroni Monabari Link Road

10.81

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications 1500,1700 & 2200. Without Plasticiser PCC Grade M 15 Height upto 5m iii)Br. No. 1/1 on Borjaroni Monabari Link Road

9.27

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (from Primary Producer:TATA / SAIL /Esser Steel /Jindal steel /Shyam steel /RINL) in foundation complete as per drawings and technical specifications clauses 1000 & 1202. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

1.42

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. i) Br. No. 6/2 on Rampur Road

18.2

-

-

... More
Construction of embankment with approved material obtained from borrow pit with all lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300.1 and 300.2 with all leads as per Technical Specification Clause 301.5. I Private Land i) Br. No. 6/2 on Rampur Road

133.74

-

-

... More
Planting of trees and their Maintenance for three year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/ sludge mannure, planting the saplings, backfilling the trenches, watering, fixing the tree guard and maintaining the plants for three year. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

20

-

-

... More
Planting of trees and their Maintenance for three year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/ sludge mannure, planting the saplings, backfilling the trenches, watering, fixing the tree guard and maintaining the plants for three year. i) Br. No. 6/2 on Rampur Road

20

-

-

... More
Planting of trees and their Maintenance for three year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/ sludge mannure, planting the saplings, backfilling the trenches, watering, fixing the tree guard and maintaining the plants for three year. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

20

-

-

... More
Ambient Air Monitoring: At pre-construction Stage: At minimum 2 locations (twice a week)  ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Ambient Air Monitoring: At pre-construction Stage: At minimum 2 locations (twice a week) i) Br. No. 6/2 on Rampur Road

4

-

-

... More
Ambient Air Monitoring: At pre-construction Stage: At minimum 2 locations (twice a week) iii)Br. No. 1/1 on Borjaroni Monabari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanAmbient Air Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Two consecutive day) (Twice a week) (Biannually) for one year ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

8

-

-

... More
Implementation of Environmental and Social Management PlanAmbient Air Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Two consecutive day) (Twice a week) (Biannually) for one year i) Br. No. 6/2 on Rampur Road

8

-

-

... More
Implementation of Environmental and Social Management PlanAmbient Air Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Two consecutive day) (Twice a week) (Biannually) for one year iii)Br. No. 1/1 on Borjaroni Monabari Link Road

8

-

-

... More
Implementation of Environmental and Social Management PlanAmbient Air Monitoring: At Operation Stage: At 2 locations (Two consecutive day) (Twice a week) (Biannually) for one year. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

8

-

-

... More
Implementation of Environmental and Social Management PlanAmbient Air Monitoring: At Operation Stage: At 2 locations (Two consecutive day) (Twice a week) (Biannually) for one year. i) Br. No. 6/2 on Rampur Road

8

-

-

... More
Implementation of Environmental and Social Management PlanAmbient Air Monitoring: At Operation Stage: At 2 locations (Two consecutive day) (Twice a week) (Biannually) for one year. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

8

-

-

... More
Water Monitoring: At pre-construction Stage: At minimum 2 locations (2 samples) ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

2

-

-

... More
Water Monitoring: At pre-construction Stage: At minimum 2 locations (2 samples) i) Br. No. 6/2 on Rampur Road

2

-

-

... More
Water Monitoring: At pre-construction Stage: At minimum 2 locations (2 samples) iii)Br. No. 1/1 on Borjaroni Monabari Link Road

2

-

-

... More
Implementation of Environmental and Social Management PlanWater Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanWater Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year. i) Br. No. 6/2 on Rampur Road

4

-

-

... More
Implementation of Environmental and Social Management PlanWater Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanWater Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually). ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanWater Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually). i) Br. No. 6/2 on Rampur Road

4

-

-

... More
Implementation of Environmental and Social Management PlanWater Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually). iii)Br. No. 1/1 on Borjaroni Monabari Link Road

4

-

-

... More
Noise Monitoring: At Pre-Construction Stage At minimum 2 locations ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

2

-

-

... More
Noise Monitoring: At Pre-Construction Stage At minimum 2 locations i) Br. No. 6/2 on Rampur Road

2

-

-

... More
Noise Monitoring: At Pre-Construction Stage At minimum 2 locations iii)Br. No. 1/1 on Borjaroni Monabari Link Road

2

-

-

... More
Implementation of Environmental and Social Management PlanNoise Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanNoise Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year. i) Br. No. 6/2 on Rampur Road

4

-

-

... More
Implementation of Environmental and Social Management PlanNoise Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanNoise Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually). ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanNoise Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually). i) Br. No. 6/2 on Rampur Road

4

-

-

... More
Implementation of Environmental and Social Management PlanNoise Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually). iii)Br. No. 1/1 on Borjaroni Monabari Link Road

4

-

-

... More
Soil Monitoring At Pre-Construction Stage: At minimum 2 locations ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

2

-

-

... More
Soil Monitoring At Pre-Construction Stage: At minimum 2 locations i) Br. No. 6/2 on Rampur Road

2

-

-

... More
Soil Monitoring At Pre-Construction Stage: At minimum 2 locations iii)Br. No. 1/1 on Borjaroni Monabari Link Road

2

-

-

... More
Implementation of Environmental and Social Management PlanSoil Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanSoil Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year. i) Br. No. 6/2 on Rampur Road

4

-

-

... More
Implementation of Environmental and Social Management PlanSoil Monitoring: At Construction Stage: At minimum 2 locations including construction camp (Biannually) for one year. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanSoil Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually). ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanSoil Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually). i) Br. No. 6/2 on Rampur Road

4

-

-

... More
Implementation of Environmental and Social Management PlanSoil Monitoring: At Operation Stage: At 2 locations (except monsoon) (Biannually). iii)Br. No. 1/1 on Borjaroni Monabari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanEcology: At Construction Stage: At 2 locations (Biannually) for one year. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanEcology: At Construction Stage: At 2 locations (Biannually) for one year. i) Br. No. 6/2 on Rampur Road

4

-

-

... More
Implementation of Environmental and Social Management PlanEcology: At Construction Stage: At 2 locations (Biannually) for one year. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanEcology: At Operation Stage: At 2 locations (Biannually) ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

4

-

-

... More
Implementation of Environmental and Social Management PlanEcology: At Operation Stage: At 2 locations (Biannually) i) Br. No. 6/2 on Rampur Road

4

-

-

... More
Implementation of Environmental and Social Management PlanEcology: At Operation Stage: At 2 locations (Biannually) iii)Br. No. 1/1 on Borjaroni Monabari Link Road

4

-

-

... More
Community meetings in village, 2 times. ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

2

-

-

... More
Community meetings in village, 2 times. i) Br. No. 6/2 on Rampur Road

2

-

-

... More
Community meetings in village, 2 times. iii)Br. No. 1/1 on Borjaroni Monabari Link Road

2

-

-

... More
A Provisional sum (Fixed Amount) for the items of Utility Shifting & Tree Cutting of Rs. 15,89,857.00 (not to be changed by the Bidders in BOQ) i) Br. No. 6/2 on Rampur Road

1

-

-

... More
A Provisional sum (Fixed Amount) for the items of Utility Shifting & Tree Cutting of Rs. 7,27,908.00 (not to be changed by the Bidders in BOQ) ii) Br. No. 1/1 on Rongajan Nahorbari Link Road

1

-

-

... More
A Provisional sum (Fixed Amount) for the items of Tree Cutting of Rs. 1,12,706.00 (not to be changed by the Bidders in BOQ) iii) Br. No. 1/1 on Borjaroni Monabari Link Road

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.