Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date8 Mar 2024
Closing DateCancelled
Tender Amount₹ 2,71,81,000 
Notes
Download

Costs

Summary

Construction Of Bridges In Karbi-anglong District I. Br. No. 4/2 On Jeng Ronghang To Manduli Ii. Br. No. 7/1 On Jeng Ronghang To Manduli

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

7.92

-

-

... More
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job i) Br. No. 4/2 on Jeng Ronghang to Manduli

3

-

-

... More
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job ii) Br. No. 7/1 on Jeng Ronghang to Manduli

3

-

-

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) i) Br. No. 4/2 on Jeng Ronghang to Manduli

175.5

-

-

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

189

-

-

... More
Providing placing and driving in position for RCC piles 6mm permanent M.S Liner upto required depth including fabricating and setting out as per detailed drawing ii) Br. No. 7/1 on Jeng Ronghang to Manduli

0.11

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m i) Br. No. 4/2 on Jeng Ronghang to Manduli

354.34

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m ii) Br. No. 7/1 on Jeng Ronghang to Manduli

337.73

-

-

... More
Levelling course for Pile cap i) Br. No. 4/2 on Jeng Ronghang to Manduli

7.71

-

-

... More
Levelling course for Pile cap ii) Br. No. 7/1 on Jeng Ronghang to Manduli

7.71

-

-

... More
Cement concrete for reinforced concrete in Pile cap & Tie Beam complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) i) Br. No. 4/2 on Jeng Ronghang to Manduli

95.44

-

-

... More
Cement concrete for reinforced concrete in Pile cap & Tie Beam complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

95.44

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Pile & Pile caps, Beams i) Br. No. 4/2 on Jeng Ronghang to Manduli

31.36

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Pile & Pile caps, Beams ii) Br. No. 7/1 on Jeng Ronghang to Manduli

32.77

-

-

... More
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, riding return walls, fly walls ) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 4/2 on Jeng Ronghang to Manduli

51.77

-

-

... More
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, riding return walls, fly walls ) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 7/1 on Jeng Ronghang to Manduli

35.68

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Box Culvert Structure(External wall, Internal wall, Corbel & Haunches, Fly Walls) i) Br. No. 4/2 on Jeng Ronghang to Manduli

11.43

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Box Culvert Structure(External wall, Internal wall, Corbel & Haunches, Fly Walls) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

9.54

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br. No. 4/2 on Jeng Ronghang to Manduli

40.36

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

31.34

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material i) Br. No. 4/2 on Jeng Ronghang to Manduli

180.13

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material ii) Br. No. 7/1 on Jeng Ronghang to Manduli

50.83

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) i) Br. No. 4/2 on Jeng Ronghang to Manduli

72

-

-

... More
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. i) Br. No. 4/2 on Jeng Ronghang to Manduli

6

-

-

... More
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

6

-

-

... More
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department i) Br. No. 4/2 on Jeng Ronghang to Manduli

6

-

-

... More
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department ii) Br. No. 7/1 on Jeng Ronghang to Manduli

6

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 4/2 on Jeng Ronghang to Manduli

61.97

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 7/1 on Jeng Ronghang to Manduli

61.97

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification i) Br. No. 4/2 on Jeng Ronghang to Manduli

7.88

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ii) Br. No. 7/1 on Jeng Ronghang to Manduli

7.88

-

-

... More
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 4/2 on Jeng Ronghang to Manduli

15.75

-

-

... More
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

15.75

-

-

... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. i) Br. No. 4/2 on Jeng Ronghang to Manduli

43.61

-

-

... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

34.8

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Deck slab i) Br. No. 4/2 on Jeng Ronghang to Manduli

13.08

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Deck slab ii) Br. No. 7/1 on Jeng Ronghang to Manduli

13.08

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Br. No. 4/2 on Jeng Ronghang to Manduli

13.11

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications ii) Br. No. 7/1 on Jeng Ronghang to Manduli

13.11

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface i) Br. No. 4/2 on Jeng Ronghang to Manduli

315.92

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface ii) Br. No. 7/1 on Jeng Ronghang to Manduli

281.49

-

-

... More
Providing and fixing drainage spouts as per MORT & H specifications. i) Br. No. 4/2 on Jeng Ronghang to Manduli

3

-

-

... More
Providing and fixing drainage spouts as per MORT & H specifications. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

3

-

-

... More
Span Load Test Load testing of one or more spans of bridge as selected by the engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span (Extra for every increase of 100.00mt or part there for in the span load capacity upto 800.00 mt i) Br. No. 4/2 on Jeng Ronghang to Manduli

1

-

-

... More
Span Load Test Load testing of one or more spans of bridge as selected by the engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span (Extra for every increase of 100.00mt or part there for in the span load capacity upto 800.00 mt ii) Br. No. 7/1 on Jeng Ronghang to Manduli

1

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 150 mm Filter Media i) Br. No. 4/2 on Jeng Ronghang to Manduli

20.19

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 300 mm Filter Media i) Br. No. 4/2 on Jeng Ronghang to Manduli

40.39

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 i) Br. No. 4/2 on Jeng Ronghang to Manduli

35.38

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. i) Br. No. 4/2 on Jeng Ronghang to Manduli

0.15

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

0.11

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 i) Br. No. 4/2 on Jeng Ronghang to Manduli

14.34

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 ii) Br. No. 7/1 on Jeng Ronghang to Manduli

665.28

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 i) Br. No. 4/2 on Jeng Ronghang to Manduli

4380.63

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 ii) Br. No. 7/1 on Jeng Ronghang to Manduli

834.7

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. i) Br. No. 4/2 on Jeng Ronghang to Manduli

700.43

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

509.96

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. i) Br. No. 4/2 on Jeng Ronghang to Manduli

148.01

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

118.45

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means i) Br. No. 4/2 on Jeng Ronghang to Manduli

69.84

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means ii) Br. No. 7/1 on Jeng Ronghang to Manduli

56.15

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means i) Br. No. 4/2 on Jeng Ronghang to Manduli

69.84

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means ii) Br. No. 7/1 on Jeng Ronghang to Manduli

56.15

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. i) Br. No. 4/2 on Jeng Ronghang to Manduli

931.13

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

748.69

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or asdirected by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. i) Br. No. 4/2 on Jeng Ronghang to Manduli

375.39

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or asdirected by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

280.42

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ii) 600mm equilateral triangle i) Br. No. 4/2 on Jeng Ronghang to Manduli

2

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ii) 600mm equilateral triangle ii) Br. No. 7/1 on Jeng Ronghang to Manduli

2

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iv) 800mm x 600mm rectangular i) Br. No. 4/2 on Jeng Ronghang to Manduli

2

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iv) 800mm x 600mm rectangular ii) Br. No. 7/1 on Jeng Ronghang to Manduli

2

-

-

... More
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) i) Br. No. 4/2 on Jeng Ronghang to Manduli

80

-

-

... More
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

80

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface i) Br. No. 4/2 on Jeng Ronghang to Manduli

38.46

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface ii) Br. No. 7/1 on Jeng Ronghang to Manduli

28.73

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. Above 600 mm to 900 mm dia Hume pipe i) Br. No. 4/2 on Jeng Ronghang to Manduli

1.1

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. Above 600 mm to 900 mm dia Hume pipe ii) Br. No. 7/1 on Jeng Ronghang to Manduli

1.37

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apartand white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. i) Br. No. 4/2 on Jeng Ronghang to Manduli

26.35

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apartand white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

26.35

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 i) Br. No. 4/2 on Jeng Ronghang to Manduli

175

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 ii) Br. No. 7/1 on Jeng Ronghang to Manduli

175

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. i) Br. No. 4/2 on Jeng Ronghang to Manduli

105

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

105

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. i) Br. No. 4/2 on Jeng Ronghang to Manduli

53

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

53

-

-

... More
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. i) Br. No. 4/2 on Jeng Ronghang to Manduli

6

-

-

... More
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. ii) Br. No. 7/1 on Jeng Ronghang to Manduli

6

-

-

... More
Air quality monitoring At 3 locations for 2seasons for 2 consecutive years. (Construction Stage) i) Br. No. 4/2 on Jeng Ronghang to Manduli

12

-

-

... More
Air quality monitoring At 3 locations for 2seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

12

-

-

... More
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) i) Br. No. 4/2 on Jeng Ronghang to Manduli

6

-

-

... More
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

6

-

-

... More
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 4/2 on Jeng Ronghang to Manduli

12

-

-

... More
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

12

-

-

... More
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 4/2 on Jeng Ronghang to Manduli

6

-

-

... More
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

6

-

-

... More
Noise quality monitoring at 3 Locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 4/2 on Jeng Ronghang to Manduli

12

-

-

... More
Noise quality monitoring at 3 Locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

12

-

-

... More
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 4/2 on Jeng Ronghang to Manduli

6

-

-

... More
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

6

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 4/2 on Jeng Ronghang to Manduli

12

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

12

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 1 year.(Operation Stage) i) Br. No. 4/2 on Jeng Ronghang to Manduli

6

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 1 year.(Operation Stage) ii) Br. No. 7/1 on Jeng Ronghang to Manduli

6

-

-

... More
Training related to Capacity Building i) Br. No. 4/2 on Jeng Ronghang to Manduli

2

-

-

... More
Training related to Capacity Building ii) Br. No. 7/1 on Jeng Ronghang to Manduli

2

-

-

... More
A Provisional sum (Fixed Amount) for the items of Utility Shifting & Tree cutting afforestation of Rs. 4,47,868.00 (not to be changed by the Bidders in BOQ) i) Br. No. 4/2 on Jeng Ronghang to Manduli

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.