Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date18 Jul 2024
Closing Date24 Jul 2024
Tender Amount₹ 7,81,84,000 
Notes
Download

Costs

Summary

Construction Of Bridges In Karbi-anglong District I) Br On Parakhowapanjuri Road Via Haza Rongpi Gaon Ii) Br 3/6 On Duportimung Gaon To Dengaon Iii) Br On Howraghat To Pub Gojalipara

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

6.17

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

4.04

-

-

... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) iii) Br. on Howraghat to Pub Gojalipara

28

-

-

... More
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

4

-

-

... More
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

4

-

-

... More
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job iii) Br. on Howraghat to Pub Gojalipara

8

-

-

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

264

-

-

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

264

-

-

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) iii) Br. on Howraghat to Pub Gojalipara

456

-

-

... More
Providing placing and driving in position for RCC piles 6mm permanent M.S Liner upto required depth including fabricating and setting out as per detailed drawing Dupor Timung gaon to Dengaon (Span 3 x 7.6)

1.19

-

-

... More
Providing placing and driving in position for RCC piles 6mm permanent M.S Liner upto required depth including fabricating and setting out as per detailed drawing iii) Br. on Howraghat to Pub Gojalipara

8.37

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

636.83

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

248.71

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m iii) Br. on Howraghat to Pub Gojalipara

789.23

-

-

... More
Levelling course for Pile cap i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

11.2

-

-

... More
Levelling course for Pile cap ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

10.48

-

-

... More
Levelling course for Pile cap iii) Br. on Howraghat to Pub Gojalipara

25.02

-

-

... More
Cement concrete for reinforced concrete in Pile cap & Tie Beams complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

134.4

-

-

... More
Cement concrete for reinforced concrete in Pile cap & Tie Beams complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

128.64

-

-

... More
Cement concrete for reinforced concrete in Pile cap & Tie Beams complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) iii) Br. on Howraghat to Pub Gojalipara

408.73

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in Foundation as per drawings and technical specifications Clauses 1000 and 1202 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

50.4

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in Foundation as per drawings and technical specifications Clauses 1000 and 1202 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

48.61

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in Foundation as per drawings and technical specifications Clauses 1000 and 1202 iii) Br. on Howraghat to Pub Gojalipara

91.94

-

-

... More
Plain/Reinforced cement concrete,(Return wall/Retaining Wall Foundation & Stem, abutment shaft, pier, pier cap,& abutment cap) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump iii) Br. on Howraghat to Pub Gojalipara

134.19

-

-

... More
Plain/Reinforced cement concrete,(U return wall) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M25 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump iii) Br. on Howraghat to Pub Gojalipara

136.16

-

-

... More
Plain/Reinforced cement concrete, (Pedestal & Sesmic Arrestor) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser RCC Grade M40 Using Batching Plant, Transit Mixer and Concrete Pump Height 5m to 10m iii) Br. on Howraghat to Pub Gojalipara

6.29

-

-

... More
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, Riding Return wall) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

76.87

-

-

... More
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, Riding Return wall) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

14.33

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

10.14

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

4.75

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 iii) Br. on Howraghat to Pub Gojalipara

43.91

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

46

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

6.99

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. iii) Br. on Howraghat to Pub Gojalipara

123.03

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

78.59

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

18

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

12.23

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material iii) Br. on Howraghat to Pub Gojalipara

460.24

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) Dupor Timung gaon to Dengaon (Span 3 x 7.6)

9

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) iii) Br. on Howraghat to Pub Gojalipara

202

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, section 9.1 & 9.2 and clause 2006 of MORTH&S Specification complete as per drawing and approved technical specification. iii) Br. on Howraghat to Pub Gojalipara

1800

-

-

... More
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

8

-

-

... More
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

8

-

-

... More
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. iii) Br. on Howraghat to Pub Gojalipara

6

-

-

... More
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

8

-

-

... More
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

8

-

-

... More
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department iii) Br. on Howraghat to Pub Gojalipara

6

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

98.69

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

87.21

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump iii) Br. on Howraghat to Pub Gojalipara

228.41

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & RCC Cross Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump iii) Br. on Howraghat to Pub Gojalipara

158.05

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

7.88

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

7.88

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification iii) Br. on Howraghat to Pub Gojalipara

7.88

-

-

... More
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

15.75

-

-

... More
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

15.75

-

-

... More
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br. on Howraghat to Pub Gojalipara

15.75

-

-

... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

68.9

-

-

... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

53.57

-

-

... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. iii) Br. on Howraghat to Pub Gojalipara

166.17

-

-

... More
High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications iii) Br. on Howraghat to Pub Gojalipara

10.96

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

21.41

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

16.05

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 iii) Br. on Howraghat to Pub Gojalipara

35.36

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

18.43

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

16.74

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications iii) Br. on Howraghat to Pub Gojalipara

43.85

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

482.25

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

355.29

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface iii) Br. on Howraghat to Pub Gojalipara

5967.1

-

-

... More
Strip Seal Expansion Joint : (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation). iii) Br. on Howraghat to Pub Gojalipara

25.5

-

-

... More
Providing and fixing drainage spouts as per MORT & H specifications. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

10

-

-

... More
Providing and fixing drainage spouts as per MORT & H specifications. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

9

-

-

... More
Providing and fixing drainage spouts as per MORT & H specifications. iii) Br. on Howraghat to Pub Gojalipara

28

-

-

... More
Span Load Test Load testing of one or more spans of bridge as selected by the engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span (Extra for every increase of 100.00mt or part there for in the span load capacity upto 800.00 mt i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

1

-

-

... More
Span Load Test Load testing of one or more spans of bridge as selected by the engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span (Extra for every increase of 100.00mt or part there for in the span load capacity upto 800.00 mt ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

1

-

-

... More
Span Load Test Load testing of one or more spans of bridge as selected by the engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span (Extra for every increase of 100.00mt or part there for in the span load capacity upto 800.00 mt iii) Br. on Howraghat to Pub Gojalipara

1

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

24.51

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

6.54

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 iii) Br. on Howraghat to Pub Gojalipara

128.67

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

49.03

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

13.07

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 iii) Br. on Howraghat to Pub Gojalipara

257.34

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

38.25

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

28.43

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 iii) Br. on Howraghat to Pub Gojalipara

88.35

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

0.15

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

0.1

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. iii) Br. on Howraghat to Pub Gojalipara

0.23

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

10802.92

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

53.9

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 iii) Br. on Howraghat to Pub Gojalipara

10124

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Dupor Timung gaon to Dengaon (Span 3 x 7.6)

172.4

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

727.44

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

445.56

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. iii) Br. on Howraghat to Pub Gojalipara

1145.78

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

152.2

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

108.46

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. iii) Br. on Howraghat to Pub Gojalipara

216.47

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

71.78

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

51.53

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means iii) Br. on Howraghat to Pub Gojalipara

101.53

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

71.78

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

51.53

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means iii) Br. on Howraghat to Pub Gojalipara

101.53

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

957

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

687

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. iii) Br. on Howraghat to Pub Gojalipara

1204.25

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

506.38

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

232.71

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. iii) Br. on Howraghat to Pub Gojalipara

2007.41

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm equilateral triangle i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm equilateral triangle ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm equilateral triangle iii) Br. on Howraghat to Pub Gojalipara

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iii) 800mm x 600mm rectangular i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

2

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iii) 800mm x 600mm rectangular ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

2

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iii) 800mm x 600mm rectangular iii) Br. on Howraghat to Pub Gojalipara

4

-

-

... More
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

80

-

-

... More
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

80

-

-

... More
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) iii) Br. on Howraghat to Pub Gojalipara

80

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

39.84

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

25.44

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface iii) Br. on Howraghat to Pub Gojalipara

61

-

-

... More
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

6

-

-

... More
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

6

-

-

... More
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. iii) Br. on Howraghat to Pub Gojalipara

6

-

-

... More
Air quality monitoring at 3 locations for 2seasons for 2 consecutive years. (Construction Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

12

-

-

... More
Air quality monitoring at 3 locations for 2seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

12

-

-

... More
Air quality monitoring at 3 locations for 2seasons for 2 consecutive years. (Construction Stage) iii) Br. on Howraghat to Pub Gojalipara

12

-

-

... More
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

6

-

-

... More
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

6

-

-

... More
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) iii) Br. on Howraghat to Pub Gojalipara

6

-

-

... More
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

12

-

-

... More
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

12

-

-

... More
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. on Howraghat to Pub Gojalipara

12

-

-

... More
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

6

-

-

... More
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

6

-

-

... More
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) iii) Br. on Howraghat to Pub Gojalipara

6

-

-

... More
Noise quality monitoring at 3Locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

12

-

-

... More
Noise quality monitoring at 3Locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

12

-

-

... More
Noise quality monitoring at 3Locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. on Howraghat to Pub Gojalipara

12

-

-

... More
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

6

-

-

... More
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

6

-

-

... More
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) iii) Br. on Howraghat to Pub Gojalipara

6

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

12

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

12

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. on Howraghat to Pub Gojalipara

12

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

6

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

6

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) iii) Br. on Howraghat to Pub Gojalipara

6

-

-

... More
Cost of Training related to Capacity Building i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon

2

-

-

... More
Cost of Training related to Capacity Building ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

2

-

-

... More
Cost of Training related to Capacity Building iii) Br. on Howraghat to Pub Gojalipara

2

-

-

... More
A Provisional sum (fixed amount) for items of utility shifting & Tree Felling & Plantation of Rs. 5,62,695.00 (not to be changed by the Bidder in BOQ) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon

1

-

-

... More
A Provisional sum (fixed amount) for items of Tree Felling & Plantation of Rs. 2,26,285.00 (not to be changed by the Bidder in BOQ) iii) Br. on Howraghat to Pub Gojalipara

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.