Public Works Roads Department Tender

... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date22 Mar 2025
Closing Date22 Apr 2025
Tender Amount₹ 3,54,81,000 
Notes
Download

AI Insights

Bid Capacity
... View More
The formula for Assessed Available bid capacity is (A*N*1.5-B)
Technical Capacity
... View More
The required prior work experience for the bidder includes specific years of experience for various positions, such as: - Project Manager cum Bridge Engineer: 10 years of experience, with 8 years in a similar position. - Assistant Bridge Engineer: 5 years of experience, with 3 years in a similar position. - Assistant Road Engineer: 5 years of experience, with 3 years for degree holders and 5 years for diploma holders in a similar position. - Environment, Health and Safety Engineer: 5 years of experience, with 3 years in a similar position. - Socialist Specialist/Labour Specialist: 5 years of experience, with 3 years in a similar position. The bidder should also have experience in construction works of a similar nature and volume over the last five years, with a minimum average annual construction turnover of Rs. 266.11 lakhs in at least two of the last five financial years in civil engineering construction work. In terms of similar works completed, the bidder should have successful completion of at least 3979 cum of earthwork in excavation, earthwork in filling in embankment/subgrade in one or more contracts/projects for road construction work in any one year of the last five years between 1st April 2019 and 31st March 2024. For similar work, such as "Construction of one RCC/PSC Girder Bridge with well/pile foundation having span of 40 m in a contract of value not less than Rs. 212.89 Lakh across channel/river in a road project", the bidder should have completed 90% or more of the works under the contract. The value and percentage of similar works completed are mentioned in the context of contracts that have been suspended or terminated, with details such as: - Total Contract Amount (Rs) - Suspended or terminated portion of contract (amount and percentage) - Contract Identification - Year Specifically, for contracts suspended or terminated, the bidder must provide the following information: - Year suspended or terminated - Portion of contract suspended or terminated (amount and percentage) - Contract Identification - Total Contract Amount (Rs) Additionally, the bidder must provide information on contracts that have been disputed, including: - Year of dispute - Amount in dispute (Rs) - Contract Identification - Total Contract Amount (Rs) - Year of award - Outcome as a percentage of Net Worth - Contract Identification - Total Contract Amount (Rs) The bidder should also demonstrate access to or have available liquid assets, unencumbered real assets, lines of credit, and other financial means to meet the construction cash flow requirements estimated as Rs. 44.35 Lakhs.

Costs

Summary

Ce/eap/arrbp/ocb/ Bridge1/cachar/20 T02 To Alney Grant Via Sonbari

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

6

-

-

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

462

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

302.58

-

-

... More
Levelling course for Pile cap Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

14.15

-

-

... More
Cement concrete for reinforced concrete in Pile cap complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

239.6

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Pile & Pile caps Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

77.32

-

-

... More
Plain/Reinforced cement concrete in sub structure complete as per drawing and technical specification and steel shuttering formwork (N) Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. With Batching Plant, Transit Mixer and Concrete Pump Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

116.83

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (N) Without Plasticiser E PSC Grade M40 Case ii. Using Batching Plant, Transit Mixer and Concrete Pump (i) For Solid slab super structure b. Height 5m to 10m Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

5.49

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 Abutment , Abutment Cap,Dirt walls, Pier, Pier cap, Pedestals, Sesmic arrestor, Riding return walls, U return wall / Fly Return walls Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

29.83

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

43.17

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

17

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, section 9.1 & 9.2 and clause 2006 of MORTH&S Specification complete as per drawing and approved technical specification. FIX,FREE,LONG,TRANS 130 MT Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

1320

-

-

... More
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

6

-

-

... More
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

6

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (N) Without Plasticiser D RCC/PSC Grade M35 Case ii. Using Batching Plant, Transit Mixer and Concrete Pump (ii) For T-beam and Slab b. Height 5m to 10m Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

249.08

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

5.32

-

-

... More
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

15.96

-

-

... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

120.44

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawings and technical specification Clauses 1002, 1010 & 1202 RCC Girder, End Diaphragm, Deck slab Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

40.78

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

32.55

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

2405.98

-

-

... More
Strip Seal Expansion Joint : (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation). Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

25.5

-

-

... More
Providing and fixing drainage spouts as per MORT & H specifications. Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

20

-

-

... More
Span Load Test Load testing of one or more spans of bridge as selected by the engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span (Extra for every increase of 100.00mt or part there for in the span load capacity upto 800.00 mt Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

1

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 150 mm Filter Media Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

85.66

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 300 mm Filter Media Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

171.32

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

106.25

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (ii) By Mechanical Means (a) In area of non-thorny jungle Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

0.23

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

7240.5

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

1162.4

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

1242.15

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

268.14

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Manual Means Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

100.92

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

100.92

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. (a) Including Edge Block/ Edge Restraints Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

1196.04

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or asdirected by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

2107.97

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iv) 800mm x 600mm rectangular Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

2

-

-

... More
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

80

-

-

... More
Painting lines, Dashes, Arrows, etc. on Road in Two Coats on New Work Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous / concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702 Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

60.56

-

-

... More
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for one year. Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

6

-

-

... More
Dismantling RCC Deck Slab & Railing Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(Dismantling of Structures) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

2262.87

-

-

... More
Wooden Bridge Diversion Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apartand white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

70

-

-

... More
Air quality monitoring At 3 locations for 2seasons for 2 consecutive years. (Construction Stage) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

12

-

-

... More
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

6

-

-

... More
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

12

-

-

... More
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

6

-

-

... More
Noise quality monitoring at 3 Locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

12

-

-

... More
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

6

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

12

-

-

... More
Soil quality monitoring at 3 locations for 2 seasons for 1 year.(Operation Stage) Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

6

-

-

... More
Training related to Capacity Building in terms of Social, Environment & Labour Management. Br. No. 1/1 Road from T02 to Alney Grant via Sonbari (Span 2 x 25)

4

-

-

... More
The Provisional Sum of Rs. 1,90,981 (Rupees One Lakh Ninety Thousand Nine Hundred Eighty One Only) is meant for utility shifting and tree felling/plantation. This is a fixed amount to be utilised during implementation for the purpose of utility shifting and tree felling/plantation. (Bidder is not required to quote the fixed amount separately.)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.