Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Oct 2024
Closing Date25 Oct 2024
Tender Amount₹ 2,94,83,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Embankment Construction with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

6141.01

-

258.21

... More
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) (a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) from private land.

1415

-

339.68

... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achive the desired density complete as per clause 401. ii) For grading II material,

715.88

-

2164.72

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

2546.88

-

3030.32

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.) '(i) With bitumen emulsion-CSS-1h

14072.5

-

39.78

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

28145

-

13.33

... More
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H specification) (A)(I)'with 60/70 or VG-30 grade bitumen (ii) for GradingII(19 mm nominal size)

844.35

-

8879.34

... More
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) (A)'(a) With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H specification) (I)'with 60/70 or VG-30 grade bitumen (ii) for Grading-II(13 mm nominal size)

562.9

-

10319.35

... More
Road side drain Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, constructing of shoring and bracing, removal of slumps and other deleterious matter, dressing of sides and bottom, backfilling with ap

36

-

127.69

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

6

-

6036.57

... More
Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and technical specifications.

1.82

-

63702.28

... More
Plain/Reinforced cement concrete, in sub-structure complete as per drawing and technical specification and steel shuttering formwork.

20.35

-

7048.83

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1 V:20 H towards drain face. Complete as per drawing and technical spec

60

-

134.7

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification.

7.2

-

1487.19

... More
Plain/ reinforced cement concrete in open foundationcomplete as per drawing and technical specification including steel shuttering formwork I) Without plasticiser C)RCC grade M20 Case 1 Using concrete mixer Bottom

4.86

-

7048.83

... More
Supplying , fitting and placing TMT bar reinforcement in foundation complete as per drawing and technical specification c) With other ISI marked TMT-IS 1786

0.38

-

63702.28

... More
E/W in excavation for foundation of structures up to 3 m dept. as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deletorious matterial, and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with approved materiels

228.76

-

127.69

... More
Bedding for Pipe : Laying (First class) bedding on well compected approved granular materials clause 1105 (ii)

24.08

-

1558.04

... More
Providing concrete for Plain/ Reinforced concrete in open M10 (1:3:6) nominal mix in levelling course below open in head walls as per drawing & technical specifications 1109

12.67

-

6036.57

... More
Providing and Laying Reinforced Cement Concrete pipe NP3 for culverts on first classs bodding of granular material in single row including fixing coller with cement motar 1:2 but excluding excavation, protection works, bachfilling, concrete and masonary work in head walls and perapet clause 1106

52.5

-

7787.85

... More
Brick masonary work in cement mortar in foundation complete excluding pointing and plastering, as per drawing and technical specification Clause 1109

117.32

-

7450.77

... More
Plastering with cement mortar (1:3) 15 mm thick on brickwork in substructure as per Technical specification Clause 613.3

193.41

-

146.41

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification.

111.51

-

1644.26

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ( 900mm equilateral triangle )

14

-

6091.04

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ( 600mm Circular)

10

-

5345.8

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ( 800mm x 600mm rectangular)

4

-

7537.1

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ( 900mm Octaganal )

4

-

9672.8

... More
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H specification) (A)(I)'with 60/70 or VG-30 grade bitumen (ii) for GradingII(19 mm nominal size)

8.15

-

8879.34

... More
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) (A)'(a) With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H specification) (I)'with 60/70 or VG-30 grade bitumen (ii) for Grading-II(13 mm nominal size)

3.26

-

10319.35

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications

914.67

-

566.13

... More
Providing reflective pavement marker with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRT&H’s fixed to the road surface using the adhesives and the procedures recommended by the manufacturers with three months replacement warranty and free maintenance.

826.67

-

287.02

... More
RCC guard post: Supplying, fitting and fixing RCC guard post 150cm long erected 75cm above the ground and 75cm below the ground with M-15 grade (nominal mix 1:2:4 with broken stone aggregate up to 20mm size) of cement concrete and required reinforcement tied in position with annealed black wire including centering, moulding the top, curing including painting concrete surfaces in 23cm strips upto 0.75m from the top alternately in black and white and having 2 nos. reflective band of desired shade etc. complete as per design and as directed. (a) 30 cm dia. RCC guard post with reinforcement of 4nos. 12mm dia TMT main steel bars and 6mm TMT/ MS stirrups at 15cm c/c.

40

-

2530.07

... More
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc. (ii) Ordinary Kilometre post (precast)

3

-

2509.17

... More
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc. (ii) Hectometer stone (precast)

10

-

667.27

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

1

-

24845.31

... More
Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year.Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year.

123

-

760.72

... More
Utility Shifting

1

-

83856.55



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.