Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date23 Dec 2024
Closing Date9 Jan 2025
Tender Amount₹ 42,96,300 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(II) Bhitor Kakila Puranibari Path:- Heavy Dressing : Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/ irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.

1590

8

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (I) Private Land

591.94

258

-

... More
Gravel/Soil-Aggregregate surface course : Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402

238.5

2628

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil): Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

799

83

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

3

127

-

... More
Laying (First Class) bedding on well compacted sand, moorum as per Clause 1105 (ii) Granular bedding

1.8

2628

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. B)600 mm dia

5

3272

-

... More
(III) Kokila Raghutal Path:- Heavy Dressing : Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/ irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.

1500

8

-

... More
Gravel/Soil-Aggregregate surface course : Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402

225

2628

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil): Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

746

83

-

... More
(IV) Baruah Pukhuri Bhakat Chuk Path:- Heavy Dressing : Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/ irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.

750

8

-

... More
Gravel/Soil-Aggregregate surface course : Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402

112.5

2628

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil): Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

375

83

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

3

127

-

... More
Laying (First Class) bedding on well compacted sand, moorum as per Clause 1105 (ii) Granular bedding

1.8

2840

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. B)600 mm dia

5

3272

-

... More
(V) Kamargaon to Sonari Gaon connecting Road:- Heavy Dressing : Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/ irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.

990

8

-

... More
Gravel/Soil-Aggregregate surface course : Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402

148.5

2628

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil): Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

498

83

-

... More
(VI) Gajpuria Sonari Gaon Connecting Road:- Heavy Dressing : Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/ irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.

3240

8

-

... More
Gravel/Soil-Aggregregate surface course : Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402

486

2628

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil): Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

1618

83

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

3

127

-

... More
Laying (First Class) bedding on well compacted sand, moorum as per Clause 1105 (ii) Granular bedding

1.8

2840

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. B)600 mm dia

5

3272

-

... More
(VII) Dahikhor to Dhuwapukhuri connecting Road:- Heavy Dressing : Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/ irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.

750

8

-

... More
Gravel/Soil-Aggregregate surface course : Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402

112.5

2628

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil): Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

373.3

83

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.