Public Works Roads Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Public Works Roads Department - PWRD Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date12 Feb 2024
Closing Date19 Feb 2024
Tender AmountRefer Documents
Costs
EMD
₹ 1,34,760Document Cost
₹ 2,021Tender Fee
Refer Documents
Summary
Kam/krc/sopd(g)/2023-24/19 Ex Post Facto Approval For Balance Work Of Krishna Bharati Path Including Construction Of Outlet Drain Under Sopd-g For The Year 2023-24, Jalukbari Lac
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_36070_1Bid Award Id
ViewTender No
No.GRC/NIT/510./ 2021-22/Pt.I/233-4 Dtd.06.02.24Tender Authority
Public Works Roads Department ViewPurchaser Address
-Website
http://https://pwdroads.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
For Grading II Material
102.03
-
2840.82
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.
By Manual Means
WBM Grading 2
51.02
-
4429
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
By Manual Means
WBM Grading 3
51.02
-
4583.37
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.
Excluding Edge block/ Edge restraints
680.23
-
941.4
Construction of Brick Masonry Open Drain : Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Ordinary soil Upto 3 m depth
398.74
-
127.69
Construction of Brick Masonry Open Drain :Removal of Unsuitable Soil with Disposal upto 1000 m
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
398.74
-
185.66
Construction of Brick Masonry Open Drain :Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412
226.2
-
717.66
Construction of Brick Masonry Open Drain:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.
P.C.C grade M 10
Nominal mix 1:3:6
22.62
-
6036.57
Construction of Brick Masonry Open Drain: Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204.
i) In 1:3 cement mortar
130.5
-
8224.03
Construction of Brick Masonry Open Drain :Plastering with cement mortar (1:4), 15 mm thick on brickwork in
substructure as per technical specification Clauses 613.4 & 1204.
609
-
146.41
Construction of Brick Masonry Open Drain: Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses
1002, 1005, 1010 & 1202
1.63
-
63702.28
Construction of Brick Masonry Open Drain: Plain/reinforced cement concrete in substructure complete as per drawings
and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 A (iii) RCC Grade M 20
14.65
-
7480.6
Construction of Brick Masonry Open Drain: Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
(ii) Sandy material
121.8
-
1822.69
Construction of Brick Masonry Open Drain: Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
141
-
134.7
Construction of RCC Slab : Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
25.9
-
63702.28
Construction of RCC Slab :Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 A(III) RCC Grade M 20
193.5
-
7480.6
Shifting of Electrical Pole
8
-
11300
Shifting of PHE Pipe Line
1
-
56500