Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Civil Works Others
Eprocure
Opening Date7 Mar 2019
Closing Date19 Mar 2019
Tender Amount₹ 2,00,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
iii) Aluminium casement window

-

-

-

... More
iv). For Weather coats for extrnal finish @ 1% of cost of Civil work

1

-

-

... More
v). For plastic paint for internal finish @ 1% of cost of Civil work

1

-

-

... More
SERVICES: 1. For normal preparation of site @ 1% of the cost of Civil work

1

-

-

... More
2. For Sanitary Installation @ 8% of the cost of Civil work

1

-

-

... More
3. For water supply @ 5% of the cost of Civil work

1

-

-

... More
4. For Internal Road path fencing @ 2.50% of the cost of Civil work

1

-

-

... More
5. For Internal Electrification @ 9% of the Civil work

1

-

-

... More
6. For External Electrification @ 4% of the cost of Civil work

1

-

-

... More
7. For Concealed wiring @ 0.75% of the Cost of Civil work

1

-

-

... More
8. For Campus lighting @ 2.50% of the cost of Civil work

1

-

-

... More
9. For motor Pump Set including emergisation @ 0.50 % of the ncost of Civil work

1

-

-

... More
10. For Fire Fighting (b) For Fire exinguisher @ 0.50% of the cost of Civil work

1

-

-

... More
11. For Ramp @ 0.50% of the cost of Civil work

1

-

-

... More
12. For Floor Tiles work Qty.= 434.40 sqm

434.4

-

-

... More
For Wall Tiles work Qty.= 25.00 sqm

25

-

-

... More
13. For Floor Tiles (Antiskid) work Qty.= 18.20 sqm

18.2

-

-

... More
14. For extra for every 300mm in plinth height beyond normal height of 750mm(144.80 sq.

144.8

-

-

... More
15. For deep tube well only for Rig boring/ DTS Boring inclusive of casing pipes and all accessories of pumps etc. (b) 150mm diameter

60

-

-

... More
16. Raising low site arround the building with approved soil obtained from outside by thuck carriage……specified.

384

-

-

... More
17. Extra for green building @ 10% of the cost of civil works

1

-

-

... More
First Floor (Assam Type) Plinth Area

144.8

-

-

... More
ADDITIONAL RATE FOR R.C.C BUILDING: 1. Aluminium casement window

-

-

-

... More
4. For Plastic paint for internal finish @ 1% of cost of Civil work

1

-

-

... More
5. For Weather coats for extrnal finish @ 1% of cost of Civil work

1

-

-

... More
SERVICES: 1. For Sanitary Installation @ 8% of the cost of Civil work

1

-

-

... More
2. For Internal water supply @ 5% of the cost of Civil work

1

-

-

... More
3. For Internal Electrification @ 9% of the Civil work

1

-

-

... More
4. For Concealed wiring @ 0.75% of the Cost of Civil work

1

-

-

... More
5. For Fire Fighting (a) For hydrant system @ 2.50% of the cost of Civil work

1

-

-

... More
6. For Floor Tiles work Qty.= 434.40 sqm

434.4

-

-

... More
For Wall Tiles work Qty.= 25.00 sqm

25

-

-

... More
7. For Floor Tiles (Antiskid) work Qty.= 18.20 sqm

18.2

-

-

... More
Second Floor (Assam Type) Plinth Area

144.8

-

-

... More
ADDITIONAL RATE FOR R.C.C BUILDING: 1. Aluminium casement window

-

-

-

... More
2. For Steel struss

-

-

-

... More
3. Extra for each subsequent floor of thereof.

-

-

-

... More
4. For Plastic paint for internal finish @ 1% of cost of Civil work

1

-

-

... More
5. For Weather coats for extrnal finish @ 1% of cost of Civil work

1

-

-

... More
SERVICES: 1. For Sanitary Installation @ 8% of the cost of Civil work

1

-

-

... More
2. For Internal water supply @ 5% of the cost of Civil work

1

-

-

... More
3. For Internal Electrification @ 9% of the Civil work

1

-

-

... More
4. For Concealed wiring @ 0.75% of the Cost of Civil work

1

-

-

... More
5. For Fire Fighting (a) For hydrant system @ 2.50% of the cost of Civil work

1

-

-

... More
6. For Floor Tiles work Qty.= 434.40 sqm

434.4

-

-

... More
For Wall Tiles work Qty.= 25.00 sqm

25

-

-

... More
7. For Floor Tiles (Antiskid) work Qty.= 18.20 sqm

18.2

-

-

... More
Cost of Construction of Brick Boundary Wall with Iron Gate. …………………..(Lum Sum)

1

-

-

... More
Item NO.-36.36- Construction of 3 phase 11 KV Line on G.I. steel tubular pole 12m SP-62 using AAA Raccoon conductor 7/3.81mm with T cross arm average span 70m. (250 Meter ………. @ L 1481577.00/K.m = L 3,70,394.00)

1

-

-

... More
Cost of Electrical work (L/S)

1

-

-

... More
Cost of Generator shed with supply of Generator (125 Kva (L/S)

1

-

-

... More
Cost of Installation of 63 KVA Transformer (L/S)

1

-

-

... More
Cost of Sub-Soil investigation ……………………..

1

-

-

... More
Supply and fitting & fixing of Chair …………………

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.