Public Works Roads Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 4,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_PWD_12500_1Bid Award Id
ViewTender No
BRRD/TB/NIT/2017-18/29/2266Tender Authority
Public Works Roads Department ViewPurchaser Address
-Website
http://https://pwdroads.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
iii) Aluminium casement window
-
-
-
... More
iv). For Weather coats for extrnal finish @ 1% of cost of Civil work
1
-
-
... More
v). For plastic paint for internal finish @ 1% of cost of Civil work
1
-
-
... More
SERVICES: 1. For normal preparation of site @ 1% of the cost of Civil work
1
-
-
... More
2. For Sanitary Installation @ 8% of the cost of Civil work
1
-
-
... More
3. For water supply @ 5% of the cost of Civil work
1
-
-
... More
4. For Internal Road path fencing @ 2.50% of the cost of Civil work
1
-
-
... More
5. For Internal Electrification @ 9% of the Civil work
1
-
-
... More
6. For External Electrification @ 4% of the cost of Civil work
1
-
-
... More
7. For Concealed wiring @ 0.75% of the Cost of Civil work
1
-
-
... More
8. For Campus lighting @ 2.50% of the cost of Civil work
1
-
-
... More
9. For motor Pump Set including emergisation @ 0.50 % of the ncost of Civil work
1
-
-
... More
10. For Fire Fighting (b) For Fire exinguisher @ 0.50% of the cost of Civil work
1
-
-
... More
11. For Ramp @ 0.50% of the cost of Civil work
1
-
-
... More
12. For Floor Tiles work Qty.= 434.40 sqm
434.4
-
-
... More
For Wall Tiles work Qty.= 25.00 sqm
25
-
-
... More
13. For Floor Tiles (Antiskid) work Qty.= 18.20 sqm
18.2
-
-
... More
14. For extra for every 300mm in plinth height beyond normal height of 750mm(144.80 sq.
144.8
-
-
... More
15. For deep tube well only for Rig boring/ DTS Boring inclusive of casing pipes and all accessories of pumps etc. (b) 150mm diameter
60
-
-
... More
16. Raising low site arround the building with approved soil obtained from outside by thuck carriage……specified.
384
-
-
... More
17. Extra for green building @ 10% of the cost of civil works
1
-
-
... More
First Floor (Assam Type)
Plinth Area
144.8
-
-
... More
ADDITIONAL RATE FOR R.C.C BUILDING:
1. Aluminium casement window
-
-
-
... More
4. For Plastic paint for internal finish @ 1% of cost of Civil work
1
-
-
... More
5. For Weather coats for extrnal finish @ 1% of cost of Civil work
1
-
-
... More
SERVICES: 1. For Sanitary Installation @ 8% of the cost of Civil work
1
-
-
... More
2. For Internal water supply @ 5% of the cost of Civil work
1
-
-
... More
3. For Internal Electrification @ 9% of the Civil work
1
-
-
... More
4. For Concealed wiring @ 0.75% of the Cost of Civil work
1
-
-
... More
5. For Fire Fighting (a) For hydrant system @ 2.50% of the cost of Civil work
1
-
-
... More
6. For Floor Tiles work Qty.= 434.40 sqm
434.4
-
-
... More
For Wall Tiles work Qty.= 25.00 sqm
25
-
-
... More
7. For Floor Tiles (Antiskid) work Qty.= 18.20 sqm
18.2
-
-
... More
Second Floor (Assam Type)
Plinth Area
144.8
-
-
... More
ADDITIONAL RATE FOR R.C.C BUILDING:
1. Aluminium casement window
-
-
-
... More
2. For Steel struss
-
-
-
... More
3. Extra for each subsequent floor of thereof.
-
-
-
... More
4. For Plastic paint for internal finish @ 1% of cost of Civil work
1
-
-
... More
5. For Weather coats for extrnal finish @ 1% of cost of Civil work
1
-
-
... More
SERVICES: 1. For Sanitary Installation @ 8% of the cost of Civil work
1
-
-
... More
2. For Internal water supply @ 5% of the cost of Civil work
1
-
-
... More
3. For Internal Electrification @ 9% of the Civil work
1
-
-
... More
4. For Concealed wiring @ 0.75% of the Cost of Civil work
1
-
-
... More
5. For Fire Fighting (a) For hydrant system @ 2.50% of the cost of Civil work
1
-
-
... More
6. For Floor Tiles work Qty.= 434.40 sqm
434.4
-
-
... More
For Wall Tiles work Qty.= 25.00 sqm
25
-
-
... More
7. For Floor Tiles (Antiskid) work Qty.= 18.20 sqm
18.2
-
-
... More
Cost of Construction of Brick Boundary Wall with Iron Gate. …………………..(Lum Sum)
1
-
-
... More
Item NO.-36.36- Construction of 3 phase 11 KV Line on G.I. steel tubular pole 12m SP-62 using AAA Raccoon conductor 7/3.81mm with T cross arm average span 70m. (250 Meter ………. @ L 1481577.00/K.m = L 3,70,394.00)
1
-
-
... More
Cost of Electrical work (L/S)
1
-
-
... More
Cost of Generator shed with supply of Generator (125 Kva (L/S)
1
-
-
... More
Cost of Installation of 63 KVA Transformer (L/S)
1
-
-
... More
Cost of Sub-Soil investigation ……………………..
1
-
-
... More
Supply and fitting & fixing of Chair …………………
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements