Public Works Roads Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 5,00,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_41423_1Tender No
CE/Com/107/ SOPD-G/24-25/1Tender Authority
Public Works Roads Department ViewPurchaser Address
-Website
http://https://pwdroads.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
506.25
1645
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
562.5
1537
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
1209.38
1748
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
337.5
1726
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
1125
1511
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
675
1877
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
562.5
1494
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
675
1861
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
393.75
1580
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
506.25
1554
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
337.5
1705
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
450
1985
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
421.88
2006
-
... More
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
843.75
1942
-
... More
Construction of 1000M dia Single opening HPC 3 Nos, Construction of 1000M dia Double opening HPC 2Nos Construction of 600M dia Single HPC Single openin 1 Nos Earth work in excavation of foundation of structures as per drawing and technical specifications Clause 305.1, including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling with approved material. I. Ordinary soil upto 3 m depth
111.13
127
-
... More
Bedding for Pipe Laying concrete cradie bedding with M 15 Grade Cement Concrete as per Clause 1105(i)
26.08
5894
-
... More
PCC M10 (1:3:6) in levelling course below open Foundation of Head walls as per drawing and technical specifications Clauses 1109.
11.11
6036
-
... More
Providing and Laying RCC NP-3 in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of grannular material in single row including fixing collar with cement mortar 1;2 but excluding excavatiuon, protection works, backfilling, concrete and masonary works, in head walls and parapets Clause 1106. B) 1000MM Dia
22.5
7787
-
... More
Providing and Laying RCC NP-3 in 1000m dia Double opening Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of grannular material in single row including fixing collar with cement mortar 1;2 but excluding excavatiuon, protection works, backfilling, concrete and masonary works, in head walls and parapets Clause 1106. B) 1000MM Dia
12.5
16483
-
... More
Providing and Laying RCC NP-3 in 600m Single opening Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of grannular material in single row including fixing collar with cement mortar 1;2 but excluding excavatiuon, protection works, backfilling, concrete and masonary works, in head walls and parapets Clause 1106. B) 600MM Dia
7.5
3272
-
... More
Brick msonry work in cement mortar in foundation of Head Wall excluding pointing and plastering, as per drawing and technical specification Clauses 1109 ii) In 1:4 cement mortar
104.61
7692
-
... More
Brick msonry work in cement mortar in substructure complete excluding pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 ii) In 1:4 cement mortar
19.9
8224
-
... More
Plastering with cement morter(1:4) 15 mm thick on brick work in sub structure as per technical specification.
200.46
146
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%