Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date3 Feb 2024
Closing Date23 Feb 2024
Tender Amount₹ 3,87,17,000 
Notes
Download

Costs

Summary

Construction Of Bridges In Jorhat District I.bridge No. 14/1 On Assam Nagaland Border Road Ii. Bridge No. 4/1 On Chuk No 10 To Seleng Te Road Iii.bridge No. 1/1 On Hemali Bozar Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of Structures, Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Mechanical Means (B) RCC ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

20

-

-

... More
Dismantling of Structures, Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Mechanical Means (B) RCC iii) Br. No. 1/1 on Hemali Bozar Road

20

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork., (I) Without plasticiser (A) PCC Grade M15i) i) Br. No. 14/1 on Assam Nagaland Border

31.13

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork., (I) Without plasticiser (A) PCC Grade M15 ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

54.1

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork., (I) Without plasticiser (A) PCC Grade M15 iii) Br. No. 1/1 on Hemali Bozar Road

46.16

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.(I) Without plasticiser (H) RCC M35 Grade (i) Using Concrete Mixer i) Br. No. 14/1 on Assam Nagaland Border

71.31

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.(I) Without plasticiser (H) RCC M35 Grade (i) Using Concrete Mixer ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

85.59

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.(I) Without plasticiser (H) RCC M35 Grade (i) Using Concrete Mixeriii) Br. No. 1/1 on Hemali Bozar Road

85.59

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.(I) Without plasticiser (E) RCC M25 Grade (i) Using Concrete Mixer i) Br. No. 14/1 on Assam Nagaland Border

19.8

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.(I) Without plasticiser (E) RCC M25 Grade (i) Using Concrete Mixer ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

96.17

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.(I) Without plasticiser (E) RCC M25 Grade (i) Using Concrete Mixer iii) Br. No. 1/1 on Hemali Bozar Road

53.96

-

-

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (A) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 14/1 on Assam Nagaland Border

9.09

-

-

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (A) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

16.97

-

-

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (A) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br. No. 1/1 on Hemali Bozar Road

14.72

-

-

... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N) Without plasticiser (H) RCC Grade M35 (a) Height upto 5 M using plasticiser, using concrete mixer i) Br. No. 14/1 on Assam Nagaland Border

35.81

-

-

... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N) Without plasticiser (H) RCC Grade M35 (a) Height upto 5 M using plasticiser, using concrete mixer ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

81.82

-

-

... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N) Without plasticiser (H) RCC Grade M35 (a) Height upto 5 M using plasticiser, using concrete mixer iii) Br. No. 1/1 on Hemali Bozar Road

65.6

-

-

... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N) Without plasticiser (F) RCC Grade M25 (a) Height upto 5 M using plasticiser, using concrete mixer i) Br. No. 14/1 on Assam Nagaland Border

22.28

-

-

... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N) Without plasticiser (F) RCC Grade M25 (a) Height upto 5 M using plasticiser, using concrete mixer ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

86.72

-

-

... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N) Without plasticiser (F) RCC Grade M25 (a) Height upto 5 M using plasticiser, using concrete mixer iii) Br. No. 1/1 on Hemali Bozar Road

56.36

-

-

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 14/1 on Assam Nagaland Border

7.92

-

-

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

24.13

-

-

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br. No. 1/1 on Hemali Bozar Road

18.73

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. i) Br. No. 14/1 on Assam Nagaland Border

120

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

120

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. iii) Br. No. 1/1 on Hemali Bozar Road

120

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular Material i) Br. No. 14/1 on Assam Nagaland Border

278.44

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular Material ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

368.51

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular Material iii) Br. No. 1/1 on Hemali Bozar Road

292.79

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br. No. 14/1 on Assam Nagaland Border

70.2

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

220.84

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. iii) Br. No. 1/1 on Hemali Bozar Road

152.66

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser ( Masterplast ACPL or equivalent) conforming to IS-9103-1999. C. RCC Grade M35 Case I : Unsing Concrete Mixer i) For solid slab super-structure a)Height up to 5m i) Br. No. 14/1 on Assam Nagaland Border

58.64

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser ( Masterplast ACPL or equivalent) conforming to IS-9103-1999. C. RCC Grade M35 Case I : Unsing Concrete Mixer i) For solid slab super-structure a)Height up to 5m ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

59.88

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser ( Masterplast ACPL or equivalent) conforming to IS-9103-1999. C. RCC Grade M35 Case I : Unsing Concrete Mixer i) For solid slab super-structure a)Height up to 5m iii) Br. No. 1/1 on Hemali Bozar Road

59.88

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 14/1 on Assam Nagaland Border

7.36

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

7.85

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br. No. 1/1 on Hemali Bozar Road

7.85

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Br. No. 14/1 on Assam Nagaland Border

13.61

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

13.72

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications iii) Br. No. 1/1 on Hemali Bozar Road

13.72

-

-

... More
Drainage Spouts complete as per drawing and Technical specification i) Br. No. 14/1 on Assam Nagaland Border

6

-

-

... More
Drainage Spouts complete as per drawing and Technical specification ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

6

-

-

... More
Drainage Spouts complete as per drawing and Technical specification iii) Br. No. 1/1 on Hemali Bozar Road

6

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification i) Br. No. 14/1 on Assam Nagaland Border

8.87

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

8.87

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification iii) Br. No. 1/1 on Hemali Bozar Road

8.87

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 14/1 on Assam Nagaland Border

17.75

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

17.75

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br. No. 1/1 on Hemali Bozar Road

17.75

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) (A) For plain surface ( kerb +crash Barrier) i) Br. No. 14/1 on Assam Nagaland Border

67.92

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) (A) For plain surface ( kerb +crash Barrier) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

67.92

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) (A) For plain surface ( kerb +crash Barrier) iii) Br. No. 1/1 on Hemali Bozar Road

67.92

-

-

... More
Providing and laying curtain walls complete as per drawing and technical specification Clause 1304 (iii) Cement concrete grade M 10 i) Br. No. 14/1 on Assam Nagaland Border

7.81

-

-

... More
Providing and laying curtain walls complete as per drawing and technical specification Clause 1304 (iii) Cement concrete grade M 10 ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

7.87

-

-

... More
Providing and laying curtain walls complete as per drawing and technical specification Clause 1304 (iii) Cement concrete grade M 10 iii) Br. No. 1/1 on Hemali Bozar Road

7.87

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (A) with crushed stone, III PCC Grade M20 Nominal mix (1:2:4) i) Br. No. 14/1 on Assam Nagaland Border

78.41

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (A) with crushed stone, III PCC Grade M20 Nominal mix (1:2:4) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

79.08

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (A) with crushed stone, III PCC Grade M20 Nominal mix (1:2:4) iii) Br. No. 1/1 on Hemali Bozar Road

79.08

-

-

... More
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less then 25 kg beyond curtain wall i) Br. No. 14/1 on Assam Nagaland Border

157.28

-

-

... More
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less then 25 kg beyond curtain wall ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

158.63

-

-

... More
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less then 25 kg beyond curtain wall iii) Br. No. 1/1 on Hemali Bozar Road

158.63

-

-

... More
Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification Clause 1303 (i) Rubble stone laid in cement mortar 1:3 Rubble stone laid in cement mortar 1:3 CC BEDDING TO BE MEASURED and PAID EXTRA i) Br. No. 14/1 on Assam Nagaland Border

131.29

-

-

... More
Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification Clause 1303 (i) Rubble stone laid in cement mortar 1:3 Rubble stone laid in cement mortar 1:3 CC BEDDING TO BE MEASURED and PAID EXTRA ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

131.96

-

-

... More
Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification Clause 1303 (i) Rubble stone laid in cement mortar 1:3 Rubble stone laid in cement mortar 1:3 CC BEDDING TO BE MEASURED and PAID EXTRA iii) Br. No. 1/1 on Hemali Bozar Road

131.96

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, With crushed Stone, PCC M 15 Nominal mix (1:2.5:5) i) Br. No. 14/1 on Assam Nagaland Border

87.53

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, With crushed Stone, PCC M 15 Nominal mix (1:2.5:5) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

87.98

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, With crushed Stone, PCC M 15 Nominal mix (1:2.5:5) iii) Br. No. 1/1 on Hemali Bozar Road

87.98

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 i) Br. No. 14/1 on Assam Nagaland Border

47.78

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

47.78

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 iii) Br. No. 1/1 on Hemali Bozar Road

47.78

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (i) Stone/Boulder i) Br. No. 14/1 on Assam Nagaland Border

95.55

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (i) Stone/Boulder ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

95.55

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (i) Stone/Boulder iii) Br. No. 1/1 on Hemali Bozar Road

95.55

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 i) Br. No. 14/1 on Assam Nagaland Border

20.15

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

20.15

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 iii) Br. No. 1/1 on Hemali Bozar Road

20.15

-

-

... More
Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a filter media base of 500 mm x 500 mm as per drawing and technical specification Clause 1205.5.7 Total nos 2*8= 16 i) Br. No. 14/1 on Assam Nagaland Border

16

-

-

... More
Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a filter media base of 500 mm x 500 mm as per drawing and technical specification Clause 1205.5.7 Total nos 2*8= 16 ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

16

-

-

... More
Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a filter media base of 500 mm x 500 mm as per drawing and technical specification Clause 1205.5.7 Total nos 2*8= 16 iii) Br. No. 1/1 on Hemali Bozar Road

16

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (a) from private land i) Br. No. 14/1 on Assam Nagaland Border

482.31

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (a) from private land ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

415.89

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (a) from private land iii) Br. No. 1/1 on Hemali Bozar Road

1799

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (a) from private land i) Br. No. 14/1 on Assam Nagaland Border

667.66

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (a) from private land ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

345.02

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (a) from private land iii) Br. No. 1/1 on Hemali Bozar Road

730.79

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.A)By Mix in Place Method (ii) for grading- II Material i) Br. No. 14/1 on Assam Nagaland Border

237.3

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.A)By Mix in Place Method (ii) for grading- II Material ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

68.51

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.A)By Mix in Place Method (ii) for grading- II Material iii) Br. No. 1/1 on Hemali Bozar Road

123.19

-

-

... More
WBM Grading 2 (A) Using stone screening Type-B 11.2 mm for Gr.II (II) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.(b) Manual means i) Br. No. 14/1 on Assam Nagaland Border

114.15

-

-

... More
WBM Grading 2 (A) Using stone screening Type-B 11.2 mm for Gr.II (II) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.(b) Manual means ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

32.34

-

-

... More
WBM Grading 2 (A) Using stone screening Type-B 11.2 mm for Gr.II (II) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.(b) Manual means iii) Br. No. 1/1 on Hemali Bozar Road

57.66

-

-

... More
WBM Grading 3, Using stone screening Type-B 11.2 mm for Gr.III (III) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (b) By Manual Means i) Br. No. 14/1 on Assam Nagaland Border

114.15

-

-

... More
WBM Grading 3, Using stone screening Type-B 11.2 mm for Gr.III (III) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (b) By Manual Means ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

32.34

-

-

... More
WBM Grading 3, Using stone screening Type-B 11.2 mm for Gr.III (III) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (b) By Manual Means iii) Br. No. 1/1 on Hemali Bozar Road

54.84

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.(i) Including Edge block/ Edge restraints i) Br. No. 14/1 on Assam Nagaland Border

1521.09

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.(i) Including Edge block/ Edge restraints ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

433.26

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.(i) Including Edge block/ Edge restraints iii) Br. No. 1/1 on Hemali Bozar Road

769.07

-

-

... More
Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. i) Br. No. 14/1 on Assam Nagaland Border

8

-

-

... More
Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

8

-

-

... More
Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. iii) Br. No. 1/1 on Hemali Bozar Road

8

-

-

... More
Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) i) Br. No. 14/1 on Assam Nagaland Border

15

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309 i) Br. No. 14/1 on Assam Nagaland Border

3489.8

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309 ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

3489.8

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309 iii) Br. No. 1/1 on Hemali Bozar Road

3489.8

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (i) 600mm equilateral triangle i) Br. No. 14/1 on Assam Nagaland Border

8

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (i) 600mm equilateral triangle ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

8

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (i) 600mm equilateral triangle iii) Br. No. 1/1 on Hemali Bozar Road

8

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (ii) 800mm x 600mm rectangular i) Br. No. 14/1 on Assam Nagaland Border

16

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (ii) 800mm x 600mm rectangular ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

16

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (ii) 800mm x 600mm rectangular iii) Br. No. 1/1 on Hemali Bozar Road

16

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (iii) 600mm circular i) Br. No. 14/1 on Assam Nagaland Border

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (iii) 600mm circular ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. (iii) 600mm circular iii) Br. No. 1/1 on Hemali Bozar Road

4

-

-

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) i) Br. No. 14/1 on Assam Nagaland Border

100

-

-

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

100

-

-

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) iii) Br. No. 1/1 on Hemali Bozar Road

100

-

-

... More
Providing Gauge marking on abutments indicating the danger level and the highest flood level of the river. i) Br. No. 14/1 on Assam Nagaland Border

1

-

-

... More
Providing Gauge marking on abutments indicating the danger level and the highest flood level of the river. ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

1

-

-

... More
Providing Gauge marking on abutments indicating the danger level and the highest flood level of the river. iii) Br. No. 1/1 on Hemali Bozar Road

1

-

-

... More
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting) i) Br. No. 14/1 on Assam Nagaland Border

8

-

-

... More
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

8

-

-

... More
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting) iii) Br. No. 1/1 on Hemali Bozar Road

8

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department i) Br. No. 14/1 on Assam Nagaland Border

15

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

15

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department iii) Br. No. 1/1 on Hemali Bozar Road

15

-

-

... More
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for one year.side trackway with earth topping complete as per direction of the department i) Br. No. 14/1 on Assam Nagaland Border

12

-

-

... More
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for one year.side trackway with earth topping complete as per direction of the department ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

12

-

-

... More
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for one year.side trackway with earth topping complete as per direction of the department iii) Br. No. 1/1 on Hemali Bozar Road

12

-

-

... More
Half Brick Circular Tree Guard, in 2nd class Brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre below ground bottom two course laid dry, and top tree courses in cement mortar 1:6 (1cement 6 sand) and the intermediate coursees being in dry honey comb masonry, as per design complete. (Half brick circular tree guard, in 2nd class brick, internal diametre 1.25 metres, and height 1.2 meter.) i) Br. No. 14/1 on Assam Nagaland Border

12

-

-

... More
Half Brick Circular Tree Guard, in 2nd class Brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre below ground bottom two course laid dry, and top tree courses in cement mortar 1:6 (1cement 6 sand) and the intermediate coursees being in dry honey comb masonry, as per design complete. (Half brick circular tree guard, in 2nd class brick, internal diametre 1.25 metres, and height 1.2 meter.) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

12

-

-

... More
Half Brick Circular Tree Guard, in 2nd class Brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre below ground bottom two course laid dry, and top tree courses in cement mortar 1:6 (1cement 6 sand) and the intermediate coursees being in dry honey comb masonry, as per design complete. (Half brick circular tree guard, in 2nd class brick, internal diametre 1.25 metres, and height 1.2 meter.) iii) Br. No. 1/1 on Hemali Bozar Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) i) Br. No. 14/1 on Assam Nagaland Border

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Air quality monitoring at 3 locations for 2 seasons for 2 consecutive years (Construction Stage) iii) Br. No. 1/1 on Hemali Bozar Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Air quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 14/1 on Assam Nagaland Border

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Air quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Air quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) iii) Br. No. 1/1 on Hemali Bozar Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 14/1 on Assam Nagaland Border

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. No. 1/1 on Hemali Bozar Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Water quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 14/1 on Assam Nagaland Border

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Water quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Water quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) iii) Br. No. 1/1 on Hemali Bozar Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 14/1 on Assam Nagaland Border

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Noise quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. No. 1/1 on Hemali Bozar Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 14/1 on Assam Nagaland Border

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) iii) Br. No. 1/1 on Hemali Bozar Road

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 14/1 on Assam Nagaland Border

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. No. 1/1 on Hemali Bozar Road

12

-

-

... More
Implementation of Enviromental and Social Management Plan - Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 14/1 on Assam Nagaland Border

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 4/1 on Chuk Br.No. 10 to to Seleng TE

6

-

-

... More
Implementation of Enviromental and Social Management Plan - Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) iii) Br. No. 1/1 on Hemali Bozar Road

6

-

-

... More
A Provisional Sum (Fixed Amount) for the items of utility shifting of Rs. 60,000.00 (not to be changed by the bidder in BOQ) i) Br. No. 14/1 on Assam Nagaland Border

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.