Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Civil And Construction
Bridge Construction
Eprocure
Opening Date18 Jul 2023
Closing Date17 Aug 2023
Tender Amount₹ 4,62,66,000 
Notes
Download

Costs

Summary

Construction Of Bridges In Barpeta District(i)br.no 1/2 On Ghelangpara Bogapara Road(ii)br. No 2/1 On Bongaon Kashkuri Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) (ii) Br. No 2/1 on Bongaon Kashkuri Road

22

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. (i) Br. No. 1/2 on Ghelangpara Bogapara Road

30

-

-

... More
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. (ii) Br. No 2/1 on Bongaon Kashkuri Road

30

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) Depth upto 3 m (i) Br. No. 1/2 on Ghelangpara Bogapara Road

400.02

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) Depth upto 3 m (ii) Br. No 2/1 on Bongaon Kashkuri Road

392.89

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (ii) Depth 3 m to 6m (i) Br. No. 1/2 on Ghelangpara Bogapara Road

95.14

-

-

... More
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

197.39

-

-

... More
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) (ii) Br. No 2/1 on Bongaon Kashkuri Road

252.58

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. Without plasticiser, PCC Grade M15 for Pile Cap (i) Br. No. 1/2 on Ghelangpara Bogapara Road

11.34

-

-

... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. Without plasticiser, PCC Grade M15 for Pile Cap (ii) Br. No 2/1 on Bongaon Kashkuri Road

11.34

-

-

... More
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump (i) Br. No. 1/2 on Ghelangpara Bogapara Road

192.78

-

-

... More
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump (ii) Br. No 2/1 on Bongaon Kashkuri Road

192.78

-

-

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

40.07

-

-

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) (ii) Br. No 2/1 on Bongaon Kashkuri Road

53.37

-

-

... More
Integrity testing of pile using low strain / sonic integrity test / Sonic echo test method in accordance with is 14893 including surface preparartion of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results. all complete as per direction of Engineer - in - Charge. Note : The inclusion of the above them to the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. (i) Br. No. 1/2 on Ghelangpara Bogapara Road

4

-

-

... More
Integrity testing of pile using low strain / sonic integrity test / Sonic echo test method in accordance with is 14893 including surface preparartion of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results. all complete as per direction of Engineer - in - Charge. Note : The inclusion of the above them to the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. (ii) Br. No 2/1 on Bongaon Kashkuri Road

4

-

-

... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, Without plasticiser, RCC Grade M35, With Batching Plant, Transit Mixer and Concrete Pump Height upto 5m (i) Br. No. 1/2 on Ghelangpara Bogapara Road

93.57

-

-

... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, Without plasticiser, RCC Grade M35, With Batching Plant, Transit Mixer and Concrete Pump Height upto 5m (ii) Br. No 2/1 on Bongaon Kashkuri Road

92.06

-

-

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

12.1

-

-

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) (ii) Br. No 2/1 on Bongaon Kashkuri Road

10.31

-

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. (i) Br. No. 1/2 on Ghelangpara Bogapara Road

117245.95

-

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. (ii) Br. No 2/1 on Bongaon Kashkuri Road

117245.95

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification (i) Br. No. 1/2 on Ghelangpara Bogapara Road

70.86

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification (ii) Br. No 2/1 on Bongaon Kashkuri Road

72.14

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification b) Sandy material (i) Br. No. 1/2 on Ghelangpara Bogapara Road

122.28

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification b) Sandy material (ii) Br. No 2/1 on Bongaon Kashkuri Road

124.48

-

-

... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall /return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. (i) Br. No. 1/2 on Ghelangpara Bogapara Road

36

-

-

... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall /return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. (ii) Br. No 2/1 on Bongaon Kashkuri Road

48

-

-

... More
Furnishing and Placing Reinforced /Prestressed cement concrete in super-structure Without plasticiser, RCC Grade M35, as per drawing and Technical Specification' including steel shuttering formwork. Using Batching Plant, Transit Mixer and Concrete Pump (i) Br. No. 1/2 on Ghelangpara Bogapara Road

164.62

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure Without plasticiser, RCC Grade M35, as per drawing and Technical Specification' including steel shuttering formwork. Using Batching Plant, Transit Mixer and Concrete Pump (ii) Br. No 2/1 on Bongaon Kashkuri Road

164.62

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA / SAIL / Esser Steel / Jindal panther steel/ Shyam steel or equivalent) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

24.45

-

-

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA / SAIL / Esser Steel / Jindal panther steel/ Shyam steel or equivalent) (ii) Br. No 2/1 on Bongaon Kashkuri Road

24.45

-

-

... More
Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC / Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. completeas required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/ loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span ( Extra for every increase of 100.00mt. or part there for in the span load capacity up to 800.00 mt.) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

1

-

-

... More
Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC / Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. completeas required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/ loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span ( Extra for every increase of 100.00mt. or part there for in the span load capacity up to 800.00 mt.) (ii) Br. No 2/1 on Bongaon Kashkuri Road

1

-

-

... More
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 a) With crushed stone Nominal mix (1:2.5:5) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

5.61

-

-

... More
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 a) With crushed stone Nominal mix (1:2.5:5) (ii) Br. No. 2/1 on Bongaon Kashkuri Road

5.61

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

17.85

-

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) (ii) Br. No 2/1 on Bongaon Kashkuri Road

17.85

-

-

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation). (i) Br. No. 1/2 on Ghelangpara Bogapara Road

17

-

-

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation). (ii) Br. No 2/1 on Bongaon Kashkuri Road

17

-

-

... More
Drainage Spouts complete as per drawing and Technical specification (i) Br. No. 1/2 on Ghelangpara Bogapara Road

8

-

-

... More
Drainage Spouts complete as per drawing and Technical specification (ii) Br. No 2/1 on Bongaon Kashkuri Road

8

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications (i) Br. No. 1/2 on Ghelangpara Bogapara Road

18.34

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications (ii) Br. No 2/1 on Bongaon Kashkuri Road

18.34

-

-

... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. (i) Br. No. 1/2 on Ghelangpara Bogapara Road

65.2

-

-

... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. (ii) Br. No. 2/1 on Bongaon Kashkuri Road

65.2

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface (i) Br. No. 1/2 on Ghelangpara Bogapara Road

127.14

-

-

... More
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface (ii) Br. No 2/1 on Bongaon Kashkuri Road

127.14

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) Depth upto 3 m (i) Br. No. 1/2 on Ghelangpara Bogapara Road

24.26

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) Depth upto 3 m (ii) Br. No 2/1 on Bongaon Kashkuri Road

24.91

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 (i) Br. No. 1/2 on Ghelangpara Bogapara Road

367.93

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 (ii) Br. No 2/1 on Bongaon Kashkuri Road

438.33

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 i) Stone / Boulder (i) Br. No. 1/2 on Ghelangpara Bogapara Road

501.3

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 i) Stone / Boulder (ii) Br. No 2/1 on Bongaon Kashkuri Road

554.79

-

-

... More
Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 Cement concrete grade M 10 in case of concrete block pitching Nominal mix 1:3:6 (i) Br. No. 1/2 on Ghelangpara Bogapara Road

16.83

-

-

... More
Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 Cement concrete grade M 10 in case of concrete block pitching Nominal mix 1:3:6 (ii) Br. No 2/1 on Bongaon Kashkuri Road

17.29

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 (i) Br. No. 1/2 on Ghelangpara Bogapara Road

0.25

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 (ii) Br. No 2/1 on Bongaon Kashkuri Road

0.31

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and comp g actin to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Br. No. 1/2 on Ghelangpara Bogapara Road

2550.15

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and comp g actin to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (ii) Br. No 2/1 on Bongaon Kashkuri Road

4383.88

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land (i) Br. No. 1/2 on Ghelangpara Bogapara Road

477.9

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land (ii) Br. No 2/1 on Bongaon Kashkuri Road

573.48

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 . (i) Br. No. 1/2 on Ghelangpara Bogapara Road

228.83

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 . (ii) Br. No 2/1 on Bongaon Kashkuri Road

274.59

-

-

... More
WBM Grading 2 , Using stone screening Type-B 11.2 mm for Gr.II - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. A. By Manual Means (i) Br. No. 1/2 on Ghelangpara Bogapara Road

84.38

-

-

... More
WBM Grading 2 , Using stone screening Type-B 11.2 mm for Gr.II - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. A. By Manual Means (ii) Br. No 2/1 on Bongaon Kashkuri Road

101.25

-

-

... More
WBM Grading 3 , Using stone screening Type-B 11.2 mm for Gr.III - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. A. By Manual Means (i) Br. No. 1/2 on Ghelangpara Bogapara Road

84.38

-

-

... More
WBM Grading 3 , Using stone screening Type-B 11.2 mm for Gr.III - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. A. By Manual Means (ii) Br. No 2/1 on Bongaon Kashkuri Road

101.25

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. a) Including Edge block/ Edge restraints (i) Br. No. 1/2 on Ghelangpara Bogapara Road

1065

-

-

... More
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. a) Including Edge block/ Edge restraints (ii) Br. No 2/1 on Bongaon Kashkuri Road

1278

-

-

... More
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) (i) Br. No 2/1 on Bongaon Kashkuri Road

120

-

-

... More
Soil/ Sub-Grade stabilisation using non-woven Geo-Textiles/ Geo- Grids Providing and laying one layer of Non-Woven geotextile of minimum mass per unit area of 280gms/sqm.having minimum roll width of 5.0m treated with carbon black with physical properties as given in clause no 702.2.3. over 25mm thick compacted sand layer on a prepared subgrade as a filter media with necessary overlaps as per drawing and technical specification and as directed by the Engineer in charge complete. (i) Br. No. 1/2 on Ghelangpara Bogapara Road

1223.5

-

-

... More
Soil/ Sub-Grade stabilisation using non-woven Geo-Textiles/ Geo- Grids Providing and laying one layer of Non-Woven geotextile of minimum mass per unit area of 280gms/sqm.having minimum roll width of 5.0m treated with carbon black with physical properties as given in clause no 702.2.3. over 25mm thick compacted sand layer on a prepared subgrade as a filter media with necessary overlaps as per drawing and technical specification and as directed by the Engineer in charge complete. (ii) Br. No. 2/1 on Bongaon Kashkuri Road

1559.38

-

-

... More
Providing approved variety of vetiver plantation certified by The Vetiver Network International (TVNI) or its affiliate in India including pouching of tiller with selected soil for agricultural use mixed with farmyard manure in 8”x 6” poly pouch, maintaining the pouched plants for at least 1(one) month with application of growth promoter, fertilizer, watering, weeding etc., dressing of the area of plantation, planting the pouched plants as per design approved by The Vetiver Network International (TVNI) or its affiliate in India. (Excluding jungle clearance, earth work in trimming, cutting, filling etc.) and Maintenance of the vetiver plants by watering, pruning, weeding, mulching, application of manure, fertilizer, growth promoter etc. for 4 (four) months after completion of plantation. (i) Br. No. 1/2 on Ghelangpara Bogapara Road

1223.5

-

-

... More
Providing approved variety of vetiver plantation certified by The Vetiver Network International (TVNI) or its affiliate in India including pouching of tiller with selected soil for agricultural use mixed with farmyard manure in 8”x 6” poly pouch, maintaining the pouched plants for at least 1(one) month with application of growth promoter, fertilizer, watering, weeding etc., dressing of the area of plantation, planting the pouched plants as per design approved by The Vetiver Network International (TVNI) or its affiliate in India. (Excluding jungle clearance, earth work in trimming, cutting, filling etc.) and Maintenance of the vetiver plants by watering, pruning, weeding, mulching, application of manure, fertilizer, growth promoter etc. for 4 (four) months after completion of plantation. (ii) Br. No 2/1 on Bongaon Kashkuri Road

1559.38

-

-

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 (i) Br. No. 1/2 on Ghelangpara Bogapara Road

1

-

-

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 (ii) Br. No 2/1 on Bongaon Kashkuri Road

1

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 900mm equilateral triangle (i)Br. No. 1/2 on Ghelangpara Bogapara Road

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 900mm equilateral triangle (ii) Br. No 2/1 on Bongaon Kashkuri Road

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 600mm x 600mm square (i) Br. No. 1/2 on Ghelangpara Bogapara Road

4

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 600mm x 600mm square (ii) Br. No 2/1 on Bongaon Kashkuri Road

4

-

-

... More
Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. (i) Br. No. 1/2 on Ghelangpara Bogapara Road

50

-

-

... More
Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. (ii) Br. No 2/1 on Bongaon Kashkuri Road

60

-

-

... More
Implementation of Environmental and Social Management Plan-Ambient Air quality Monitoring for 2 years(Construction phase) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

12

-

-

... More
Implementation of Environmental and Social Management Plan-Ambient Air quality Monitoring for 2 years(Construction phase) (ii) Br. No 2/1 on Bongaon Kashkuri Road

12

-

-

... More
Implementation of Environmental and Social Management Plan-Ambient Air quality Monitoring for 1 years(operational phase) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

6

-

-

... More
Implementation of Environmental and Social Management Plan-Ambient Air quality Monitoring for 1 years(operational phase) (ii) Br. No 2/1 on Bongaon Kashkuri Road

6

-

-

... More
Implementation of Environmental and Social Management Plan-water quality Monitoring for 2 years(Construction phase) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

12

-

-

... More
Implementation of Environmental and Social Management Plan-water quality Monitoring for 2 years(Construction phase) (ii) Br. No 2/1 on Bongaon Kashkuri Road

12

-

-

... More
Implementation of Environmental and Social Management Plan-Water quality Monitoring for 1 years(operational phase) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

6

-

-

... More
Implementation of Environmental and Social Management Plan-Water quality Monitoring for 1 years(operational phase) (ii) Br. No 2/1 on Bongaon Kashkuri Road

6

-

-

... More
Implementation of Environmental and Social Management Plan-Noise quality Monitoring for 2 years(Construction phase) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

12

-

-

... More
Implementation of Environmental and Social Management Plan-Noise quality Monitoring for 2 years(Construction phase) (ii) Br. No 2/1 on Bongaon Kashkuri Road

12

-

-

... More
Implementation of Environmental and Social Management Plan-Noise quality Monitoring for 1 years(operational phase) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

6

-

-

... More
Implementation of Environmental and Social Management Plan-Noise quality Monitoring for 1 years(operational phase) (ii) Br. No 2/1 on Bongaon Kashkuri Road

6

-

-

... More
Implementation of Environmental and Social Management Plan-Soil Analysis for 2 years(Construction phase) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

12

-

-

... More
Implementation of Environmental and Social Management Plan-Soil analysis for 2 years(Construction phase) (ii) Br. No 2/1 on Bongaon Kashkuri Road

12

-

-

... More
Implementation of Environmental and Social Management Plan-Soil Analysis for 1 years(operational phase) (i) Br. No. 1/2 on Ghelangpara Bogapara Road

6

-

-

... More
Implementation of Environmental and Social Management Plan-Soil Analysis for 1 years(operational phase) (ii) Br. No 2/1 on Bongaon Kashkuri Road

6

-

-

... More
A Provisional Sum (Fixed Amount) for the items of utility shifting and tree felling/plantation of Rs. 5,70,805.40 (not to be changed by the bidder in BOQ) (ii) Br. No 2/1 on Bongaon Kashkuri Road

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.