Public Works Roads Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Civil And Construction
Eprocure
Opening Date11 Dec 2018
Closing Date17 Dec 2018
Tender Amount₹ 3,42,32,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
WBM Grading-3 :Using stone screening Type-B 11.2 mm for Gr.III Providing, laying, spreading and compacting stone aggregates of specific sizes to watter bound macadam specification including spreading in uniform thichness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screenings to fill up the interstices of course aggregates, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 A. By Manual Means

563.16

-

-

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (i) With bitumen emulsion-CSS-1h

3754.37

-

-

... More
Tack Coat:Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) (I)With Bitumen emulsion CSS-1h (b) dry & hungry bituminous surface

3754.37

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5% of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.508. complete in all respect. A. With hydrated lime/cement as filler ( refer table 500-9 of MoRT&H specification) (I)with 60/70 or VG-30 grade bitumen for GradingII(10 mm nominal size)

93.86

-

-

... More
Providing and laying of hot applied tharmoplastic compound 2.5 mm thick including reflectorising glass heads @ 250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass bead as per IRC:35 the finishedsurface to be level, uniform and free from streaks and holes and conforming to the MORT&H specifications.

199

-

-

... More
Providing reflective pavement marker with Micro prismatic lens in both direction having tharmoplastic body adhering to the specification and guidelines of MORT&H fixed to the road surface using the adhesives and the procedures recommended by the manufactures with three months replacement warranty and free maintenance.

400

-

-

... More
Providing Sparkle Solar Road Stud manufactures by Tata BP Solar India Ltdof size (125mmx 125mm),90mm height(from bottom of shank to the top of stud) with detachable battery, m6LED on each side for Bi-directional studs/ 3LED on one side for unidirectional studs, ultra bright LED in amber and red colour, weight per stud 700+25gms, flush rate of 50-65 times per minute completely water resistant and weather proof with replacement warrently and free maintenance from one year from the date of installation of stud on road (installation should be made using adhesive and procedures recommended by manufacturer under the supervision of their competent technician) a) Bi-directional stud.

8

-

-

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5m thick supported on a mild mild steel angle iron post 75mm x 75mm x6mm firmly fixed to tthe ground by means of properly designed foundation with M15 grade cement concrete 450mm x 450mm x 600mm, 600mm below ground level as per drawings and tTechnical specification Clause 801. (ii) 600mm equilateral triangle

6

-

-

... More
(ii) Road from Sarbananda Das road :Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

3649.57

-

-

... More
WBM Grading-3 :Using stone screening Type-B 11.2 mm for Gr.III Providing, laying, spreading and compacting stone aggregates of specific sizes to watter bound macadam specification including spreading in uniform thichness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screenings to fill up the interstices of course aggregates, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 A. By Manual Means

115.31

-

-

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (i) With bitumen emulsion-CSS-1h

2220.36

-

-

... More
Tack Coat:Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) (I)With Bitumen emulsion CSS-1h (b) dry & hungry bituminous surface

6236.25

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5% of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.508. complete in all respect. A. With hydrated lime/cement as filler ( refer table 500-9 of MoRT&H specification) (I)with 60/70 or VG-30 grade bitumen for GradingII(10 mm nominal size)

171.5

-

-

... More
Providing and laying of hot applied tharmoplastic compound 2.5 mm thick including reflectorising glass heads @ 250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass bead as per IRC:35 the finishedsurface to be level, uniform and free from streaks and holes and conforming to the MORT&H specifications.

325

-

-

... More
Providing reflective pavement marker with Micro prismatic lens in both direction having tharmoplastic body adhering to the specification and guidelines of MORT&H fixed to the road surface using the adhesives and the procedures recommended by the manufactures with three months replacement warranty and free maintenance.

300

-

-

... More
Providing Sparkle Solar Road Stud manufactures by Tata BP Solar India Ltdof size (125mmx 125mm),90mm height(from bottom of shank to the top of stud) with detachable battery, m6LED on each side for Bi-directional studs/ 3LED on one side for unidirectional studs, ultra bright LED in amber and red colour, weight per stud 700+25gms, flush rate of 50-65 times per minute completely water resistant and weather proof with replacement warrently and free maintenance from one year from the date of installation of stud on road (installation should be made using adhesive and procedures recommended by manufacturer under the supervision of their competent technician) a) Bi-directional stud.

6

-

-

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5m thick supported on a mild mild steel angle iron post 75mm x 75mm x6mm firmly fixed to tthe ground by means of properly designed foundation with M15 grade cement concrete 450mm x 450mm x 600mm, 600mm below ground level as per drawings and tTechnical specification Clause 801. (ii) 600mm equilateral triangle

6

-

-

... More
(iii)VIP Road : Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

2341

-

-

... More
WBM Grading-3 :Using stone screening Type-B 11.2 mm for Gr.III Providing, laying, spreading and compacting stone aggregates of specific sizes to watter bound macadam specification including spreading in uniform thichness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screenings to fill up the interstices of course aggregates, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 A. By Manual Means

95.54

-

-

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (i) With bitumen emulsion-CSS-1h

3986.25

-

-

... More
Tack Coat:Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) (I)With Bitumen emulsion CSS-1h (b) dry & hungry bituminous surface

7972.5

-

-

... More
Bituminous Macadam : Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.

328.87

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5% of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.508. complete in all respect. A. With hydrated lime/cement as filler ( refer table 500-9 of MoRT&H specification) (I)with 60/70 or VG-30 grade bitumen for GradingII(10 mm nominal size)

99.66

-

-

... More
Providing and laying interlocking concrete block pavement (ICBP) conforming to IS: 15658:2006 including all lead and lift complete as per technical specification and as directed (a) 80 mm thick interlocking precast blocks having compressive strength of 40N/sqmm

385

-

-

... More
Providing and layingM40 grade cement concrete Edge block/edge restrints complete as per Technical specification clause 1504

9.66

-

-

... More
Providing and laying of hot applied tharmoplastic compound 2.5 mm thick including reflectorising glass heads @ 250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass bead as per IRC:35 the finishedsurface to be level, uniform and free from streaks and holes and conforming to the MORT&H specifications.

350

-

-

... More
Providing reflective pavement marker with Micro prismatic lens in both direction having tharmoplastic body adhering to the specification and guidelines of MORT&H fixed to the road surface using the adhesives and the procedures recommended by the manufactures with three months replacement warranty and free maintenance.

350

-

-

... More
Providing Sparkle Solar Road Stud manufactures by Tata BP Solar India Ltdof size (125mmx 125mm),90mm height(from bottom of shank to the top of stud) with detachable battery, m6LED on each side for Bi-directional studs/ 3LED on one side for unidirectional studs, ultra bright LED in amber and red colour, weight per stud 700+25gms, flush rate of 50-65 times per minute completely water resistant and weather proof with replacement warrently and free maintenance from one year from the date of installation of stud on road (installation should be made using adhesive and procedures recommended by manufacturer under the supervision of their competent technician) a) Bi-directional stud.

14

-

-

... More
Direction and Place Identification signs upto 0.9 sqm size boardA. Retro-reflectorised Traffic Signs:Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron of 25mmx25mmx4 mm supported on a mild steel iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 Hazard marking (HM)

12.96

-

-

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5m thick supported on a mild mild steel angle iron post 75mm x 75mm x6mm firmly fixed to tthe ground by means of properly designed foundation with M15 grade cement concrete 450mm x 450mm x 600mm, 600mm below ground level as per drawings and tTechnical specification Clause 801. (ii) 900mm equilateral triangle

6

-

-

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5m thick supported on a mild mild steel angle iron post 75mm x 75mm x6mm firmly fixed to tthe ground by means of properly designed foundation with M15 grade cement concrete 450mm x 450mm x 600mm, 600mm below ground level as per drawings and tTechnical specification Clause 801. (ii) 600mm x600 mm square

10

-

-

... More
(iv) Dakhin Hati Smakhan Approach Road Construction of embankment with approved material obtained from borrow pits with a lift upto 1.50m transporting to site spreading grading to required slope, and compacting to meet requirement of table 300.1 & 3001.2 with a lead updto 1000m as per technical specification clause 301.5(i) private Land .

7234.5

-

-

... More
Construction of Sub-grade & Earthen Shoulders obtained from borrow pits with all lift and lead transporting to site spreading grading to required slope, and compacting to meet requirement of table 3001.2 with a lead updto 1000m as per technical specification clause 303.1(i) private Land

1962.68

-

-

... More
Construction of granular sub-base by providing course graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401..(ii) For grading II material

330.47

-

-

... More
WBM Grading-3 :Using stone screening Type-B 11.2 mm for Gr.III Providing, laying, spreading and compacting stone aggregates of specific sizes to watter bound macadam specification including spreading in uniform thichness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screenings to fill up the interstices of course aggregates, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 A. By Manual Means

396.56

-

-

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (i) With bitumen emulsion-CSS-1h

2643.75

-

-

... More
Tack Coat:Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) (I)With Bitumen emulsion CSS-1h (b) dry & hungry bituminous surface

2643.75

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5% of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.508. complete in all respect. A. With hydrated lime/cement as filler ( refer table 500-9 of MoRT&H specification) (I)with 60/70 or VG-30 grade bitumen for GradingII(10 mm nominal size)

66.09

-

-

... More
Providing and laying of hot applied tharmoplastic compound 2.5 mm thick including reflectorising glass heads @ 250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass bead as per IRC:35 the finishedsurface to be level, uniform and free from streaks and holes and conforming to the MORT&H specifications.

90

-

-

... More
Providing reflective pavement marker with Micro prismatic lens in both direction having tharmoplastic body adhering to the specification and guidelines of MORT&H fixed to the road surface using the adhesives and the procedures recommended by the manufactures with three months replacement warranty and free maintenance.

200

-

-

... More
Providing Sparkle Solar Road Stud manufactures by Tata BP Solar India Ltdof size (125mmx 125mm),90mm height(from bottom of shank to the top of stud) with detachable battery, m6LED on each side for Bi-directional studs/ 3LED on one side for unidirectional studs, ultra bright LED in amber and red colour, weight per stud 700+25gms, flush rate of 50-65 times per minute completely water resistant and weather proof with replacement warrently and free maintenance from one year from the date of installation of stud on road (installation should be made using adhesive and procedures recommended by manufacturer under the supervision of their competent technician) a) Bi-directional stud.

4

-

-

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5m thick supported on a mild mild steel angle iron post 75mm x 75mm x6mm firmly fixed to tthe ground by means of properly designed foundation with M15 grade cement concrete 450mm x 450mm x 600mm, 600mm below ground level as per drawings and tTechnical specification Clause 801. (ii) 600mm equilateral triangle

4

-

-

... More
(v) Kahibari Dongra Palhaji Road : Maintenance of Earthen shoulder (filling with fresh selected soil) . Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

7087.5

-

-

... More
Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means: Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

9968.75

-

-

... More
Construction of granular sub-base by providing course graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401..(ii) For grading II material

206.45

-

-

... More
WBM Grading-2 : Using stone screening Type-B 11.2 mm for Gr.II: Providing, laying, spreading and compacting stone aggregates of specific sizes to watter bound macadam specification including spreading in uniform thichness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screenings to fill up the interstices of course aggregates, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 A. By Manual Means

120.94

-

-

... More
WBM Grading-3 :Using stone screening Type-B 11.2 mm for Gr.III Providing, laying, spreading and compacting stone aggregates of specific sizes to watter bound macadam specification including spreading in uniform thichness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screenings to fill up the interstices of course aggregates, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 A. By Manual Means

788.94

-

-

... More
Prime Coat: (i) Low Porosity : Providing and applying prime Coat with bitumen emulsion (CSS-1) on prepared surface of granular base /WB/WMM including of road surface and spraying of primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502.

12125

-

-

... More
Tack Coat: Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30-to 0.35 kg/sqm on the prepared non bituminous surface (including cost of testing of materials at sit and laboratory as directed by the deptt.

12125

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5% of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.508. complete in all respect. A. With hydrated lime/cement as filler ( refer table 500-9 of MoRT&H specification) (I)with 60/70 or VG-30 grade bitumen for GradingII(10 mm nominal size)

298.44

-

-

... More
Providing and laying of hot applied tharmoplastic compound 2.5 mm thick including reflectorising glass heads @ 250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass bead as per IRC:35 the finishedsurface to be level, uniform and free from streaks and holes and conforming to the MORT&H specifications.

200

-

-

... More
Providing reflective pavement marker with Micro prismatic lens in both direction having tharmoplastic body adhering to the specification and guidelines of MORT&H fixed to the road surface using the adhesives and the procedures recommended by the manufactures with three months replacement warranty and free maintenance.

170

-

-

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5m thick supported on a mild mild steel angle iron post 75mm x 75mm x6mm firmly fixed to tthe ground by means of properly designed foundation with M15 grade cement concrete 450mm x 450mm x 600mm, 600mm below ground level as per drawings and tTechnical specification Clause 801. (ii) 600mm equilateral triangle

6

-

-

... More
Single pipe HP Culvert 1000mm dia (10m wide) of Kahibari Dongra Palhaji Road : Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth

39.43

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

2.48

-

-

... More
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203

11.79

-

-

... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204

4.95

-

-

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.

10

-

-

... More
Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification

25.54

-

-

... More
(vi) K.K road to Ketekibari : Maintenance of Earthen shoulder (filling with fresh selected soil) . Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

557

-

-

... More
WBM Grading-3 :Using stone screening Type-B 11.2 mm for Gr.III Providing, laying, spreading and compacting stone aggregates of specific sizes to watter bound macadam specification including spreading in uniform thichness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screenings to fill up the interstices of course aggregates, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 A. By Manual Means

9.4

-

-

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (i) With bitumen emulsion-CSS-1h

106.56

-

-

... More
Tack Coat:Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) (I)With Bitumen emulsion CSS-1h (b) dry & hungry bituminous surface

808.5

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5% of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.508. complete in all respect. A. With hydrated lime/cement as filler ( refer table 500-9 of MoRT&H specification) (I)with 60/70 or VG-30 grade bitumen for GradingII(10 mm nominal size)

20.21

-

-

... More
Providing and laying of hot applied tharmoplastic compound 2.5 mm thick including reflectorising glass heads @ 250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass bead as per IRC:35 the finishedsurface to be level, uniform and free from streaks and holes and conforming to the MORT&H specifications.

39.6

-

-

... More
Providing reflective pavement marker with Micro prismatic lens in both direction having tharmoplastic body adhering to the specification and guidelines of MORT&H fixed to the road surface using the adhesives and the procedures recommended by the manufactures with three months replacement warranty and free maintenance.

87

-

-

... More
Providing Sparkle Solar Road Stud manufactures by Tata BP Solar India Ltdof size (125mmx 125mm),90mm height(from bottom of shank to the top of stud) with detachable battery, m6LED on each side for Bi-directional studs/ 3LED on one side for unidirectional studs, ultra bright LED in amber and red colour, weight per stud 700+25gms, flush rate of 50-65 times per minute completely water resistant and weather proof with replacement warrently and free maintenance from one year from the date of installation of stud on road (installation should be made using adhesive and procedures recommended by manufacturer under the supervision of their competent technician) a) Bi-directional stud.

2

-

-

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5m thick supported on a mild mild steel angle iron post 75mm x 75mm x6mm firmly fixed to tthe ground by means of properly designed foundation with M15 grade cement concrete 450mm x 450mm x 600mm, 600mm below ground level as per drawings and tTechnical specification Clause 801. (ii) 900mm equilateral triangle

4

-

-

... More
(vii) B.B Road to K.K road (1No. Galia Hati) : Maintenance of Earthen shoulder (filling with fresh selected soil) . Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

1012.5

-

-

... More
WBM Grading-3 :Using stone screening Type-B 11.2 mm for Gr.III Providing, laying, spreading and compacting stone aggregates of specific sizes to watter bound macadam specification including spreading in uniform thichness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screenings to fill up the interstices of course aggregates, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 A. By Manual Means

43.75

-

-

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (i) With bitumen emulsion-CSS-1h

641.65

-

-

... More
Tack Coat:Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) (I)With Bitumen emulsion CSS-1h (b) dry & hungry bituminous surface

1910

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5% of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.508. complete in all respect. A. With hydrated lime/cement as filler ( refer table 500-9 of MoRT&H specification) (I)with 60/70 or VG-30 grade bitumen for GradingII(10 mm nominal size)

52.53

-

-

... More
Providing and laying of hot applied tharmoplastic compound 2.5 mm thick including reflectorising glass heads @ 250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass bead as per IRC:35 the finishedsurface to be level, uniform and free from streaks and holes and conforming to the MORT&H specifications.

91

-

-

... More
Providing reflective pavement marker with Micro prismatic lens in both direction having tharmoplastic body adhering to the specification and guidelines of MORT&H fixed to the road surface using the adhesives and the procedures recommended by the manufactures with three months replacement warranty and free maintenance.

138

-

-

... More
Providing Sparkle Solar Road Stud manufactures by Tata BP Solar India Ltdof size (125mmx 125mm),90mm height(from bottom of shank to the top of stud) with detachable battery, m6LED on each side for Bi-directional studs/ 3LED on one side for unidirectional studs, ultra bright LED in amber and red colour, weight per stud 700+25gms, flush rate of 50-65 times per minute completely water resistant and weather proof with replacement warrently and free maintenance from one year from the date of installation of stud on road (installation should be made using adhesive and procedures recommended by manufacturer under the supervision of their competent technician) a) Bi-directional stud.

4

-

-

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5m thick supported on a mild mild steel angle iron post 75mm x 75mm x6mm firmly fixed to tthe ground by means of properly designed foundation with M15 grade cement concrete 450mm x 450mm x 600mm, 600mm below ground level as per drawings and tTechnical specification Clause 801. (ii) 600mm equilateral triangle

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.