BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Public Works Roads Department - PWRD Tender

Civil Works Roads
Eprocure
Opening Date14 Oct 2020
Closing Date4 Nov 2020
Tender Amount₹ 61,79,52,000 
Notes
Download

Costs

Summary

Construction Of Hamren Umpanai Road (portion From Hamren To Rongchek) Under Central Road Infrastructure Fund (crif) For The Year 2020-21

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including earthwork and dismantling of masonry works as per Technical specification Clause 202. (A) Upto 600 mm dia Hume Pipe

82.5

-

184.19

... More
Excavation in ordinary rock by manual means (a) (Excavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with in all lifts and leads upto 1000 metres )

157783.89

-

288.15

... More
Excavation in Hard Rock (blasting prohibited) (Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections.)

39458.72

-

725.46

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land

52506.23

-

268.94

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land

26540.15

-

327.7

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (A) By Mix in Place Method ii) For Grading II Material

31652.62

-

4207.56

... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )

31652.62

-

4605.32

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity

158263.11

-

33.9

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

316526.21

-

12.43

... More
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) With hydrated lime / cement as filler (refer table 500-9 of MoSRT&H specification) & anti stripping agent as per IS:14982 (Refer Appendix-5 of MoSRT&H specification)(I)'with 60/70 or VG-30 grade bitumen (i) for Grading I ( 13 mm nominal size )

7913.16

-

10853.65

... More
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) With hydrated lime / cement as filler (refer table 500-9 of MoSRT&H specification) & anti stripping agent as per IS:14982 (Refer Appendix-5 of MoSRT&H specification)(I)'with 60/70 or VG-30 grade bitumen Grading-II(13 mm nominal size)

4747.89

-

11689.85

... More
Single Hume Pipe Culvert : Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

1393.66

-

135.6

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open

94.82

-

6377.72

... More
Bedding for pipe (ii) Type B(First Class) Bedding Laying (First Class) bedding on well compacted sand moorum as per Clause 1105(ii) (i) Sand Filling

138.36

-

1636.24

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. II. In 1:4 cement mortar

930.1

-

5003.64

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

1291.5

-

160.46

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (B) 1000 mm dia

262.5

-

7774.97

... More
RCC Box Cell (2m x 2m) : Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

240.24

-

135.6

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

30.24

-

6377.72

... More
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork A. With Crushed Stone RCC Grade M20 for Height upto 5m

209.31

-

8482.91

... More
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (Qty as per DWG ) (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)

15.97

-

88733.25

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

11.25

-

16451.67

... More
Double Hume Pipe Culvert of 1200mm dia : Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

910.63

-

135.6

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

61.84

-

6377.72

... More
Bedding for pipe (ii) Type B(First Class) Bedding Laying (First Class) bedding on well compacted sand moorum as per Clause 1105(ii) (i) Sand Filling

236.75

-

1636.24

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. II. In 1:4 cement mortar

717.06

-

5003.64

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

851.04

-

160.46

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (A) 1200 mm dia

270

-

22364.51

... More
BRIDGE PROPER : Br No. 12/1 : Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. .

25

-

14361.51

... More
Excavation for Structures : (Earth work in excavation for foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides I) In Ordinary Soil i) Up to 3 m depth

62.83

-

283.63

... More
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m.

266.85

-

12948.67

... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). As per technical specification of MORTH section no 1100 a) Initial load test

175

-

372.9

... More
Cement concrete for reinforcement concrete in pile cap complete as per drawing and technical specifications 0f MORTH section no 1100,1500&1700 (N) Without plasticiser A. RCC grade M - 20 Case I : Using concrete mixer

113.52

-

7951.81

... More
Levelling course for Pile cap : Providing and lying of PCC M - 15 levelling course 100 mm thick below the pile cap. as per drawing and technical specifications 0f MORTH section

7.27

-

6633.1

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)

42.14

-

88581.83

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specificationclauses 802,804,805,807,1202 and 1204 A) With crushed stone III) RCC Grade M 30 I) Height up to 5.0 m

81.77

-

9183.51

... More
Supplying, fitting and placing TMT bar reinforcement in substructure complete as per drawing and technical specifications of MoRTH section no 1600, 2200 (a) (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)

14.34

-

88733.25

... More
Supplying, fitting and fixing in position true to line and level elastomer bearing conforming to IRC : (83 pt.II) section IX complete as per drawing and technical specifications clause 1207.1

80640

-

5.8

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. A) With Crushed stones II) RCC M 35 1) Height up to 5.0 m

78

-

11392.66

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)

12.08

-

90481.36

... More
Providing and laying cement concrete wearing coat M 30 grade including reinforcement complete as per drawing and Technical specifications clauses 800 and 1206.3 A) With crushed stone

10.91

-

16451.67

... More
Construction of RCC railing of M 25 grade ,in cast in situ with 20 mm nominal size aggregate, true to line and grade , tolerance of vertical railing post not exceed 1 in 500 , center center spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800,900 and 1208.3

46.8

-

2612.56

... More
Drainage Spouts complete as per approved drawing and technical specifications clause 1209

10

-

10018.58

... More
Burried Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).

15

-

1691.61

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid in dry in front of toe of embankment complete as per drawing and Technical specification

232.16

-

4154.45

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification

77.39

-

4323.95

... More
Providing and laying boulder apron on river bed for protevtion against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.

278.74

-

4154.45

... More
BRIDGE PROPER : Br.No.19/1 : Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. .

30

-

14361.51

... More
Excavation for Structures (Earth work in excavation for foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides I) In Ordinary Soil i) Up to 3 m depth

72.54

-

283.63

... More
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m.

273.25

-

12948.67

... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). As per technical specification of MORTH section no 1100 a) Initial load test

175

-

372.9

... More
Cement concrete for reinforcement concrete in pile cap complete as per drawing and technical specifications 0f MORTH section no 1100,1500&1700 (N) Without plasticiser A. RCC grade M - 20 Case I : Using concrete mixer

113.52

-

7951.81

... More
Levelling course for Pile cap : Providing and lying of PCC M - 15 levelling course 100 mm thick below the pile cap. as per drawing and technical specifications 0f MORTH section

7.27

-

6633.1

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)

50.85

-

88581.83

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specificationclauses 802,804,805,807,1202 and 1204 A) With crushed stone III) RCC Grade M 30 I) Height up to 5.0 m

70.78

-

9183.51

... More
Supplying, fitting and placing TMT bar reinforcement in substructure complete as per drawing and technical specifications of MoRTH section no 1600, 2200 (a) (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)

11.55

-

88733.25

... More
Supplying, fitting and fixing in position true to line and level elastomer bearing conforming to IRC : (83 pt.II) section IX complete as per drawing and technical specifications clause 1207.1

80640

-

5.8

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. A) With Crushed stones II) RCC M 35 1) Height up to 5.0 m

95.5

-

11392.66

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)

14.88

-

90481.36

... More
Providing and laying cement concrete wearing coat M 30 grade including reinforcement complete as per drawing and Technical specifications clauses 800 and 1206.3 A) With crushed stone

12.6

-

16451.67

... More
Construction of RCC railing of M 25 grade ,in cast in situ with 20 mm nominal size aggregate, true to line and grade , tolerance of vertical railing post not exceed 1 in 500 , center center spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800,900 and 1208.3

52.8

-

2612.56

... More
Drainage Spouts complete as per approved drawing and technical specifications clause 1209

11

-

10018.58

... More
Burried Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).

15

-

1691.61

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid in dry in front of toe of embankment complete as per drawing and Technical specification

232.16

-

4154.45

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification

77.39

-

4323.95

... More
Providing and laying boulder apron on river bed for protevtion against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.

278.74

-

4154.45

... More
BRIDGE PROPER : Br.No.25/1 : Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. .

30

-

14361.51

... More
Excavation for Structures : (Earth work in excavation for foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides I) In Ordinary Soil i) Up to 3 m depth

72.54

-

283.63

... More
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m.

308.45

-

12948.67

... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). As per technical specification of MORTH section no 1100

175

-

372.9

... More
Cement concrete for reinforcement concrete in pile cap complete as per drawing and technical specifications 0f MORTH section no 1100,1500&1700 (N) Without plasticiser A. RCC grade M - 20 Case I : Using concrete mixer

113.52

-

7951.81

... More
Levelling course for Pile cap Providing and lying of PCC M - 15 levelling course 100 mm thick below the pile cap. as per drawing and technical specifications 0f MORTH section

7.27

-

6633.1

... More
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)

46.63

-

88581.83

... More
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specificationclauses 802,804,805,807,1202 and 1204 A) With crushed stone III) RCC Grade M 30 I) Height up to 5.0 m

66.23

-

9183.51

... More
Supplying, fitting and placing TMT bar reinforcement in substructure complete as per drawing and technical specifications of MoRTH section no 1600, 2200 (a) (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)

10.57

-

88733.25

... More
Supplying, fitting and fixing in position true to line and level elastomer bearing conforming to IRC : (83 pt.II) section IX complete as per drawing and technical specifications clause 1207.1

80640

-

5.8

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. A) With Crushed stones II) RCC M 35 1) Height up to 5.0 m

95.5

-

11392.66

... More
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)

14.88

-

90481.37

... More
Providing and laying cement concrete wearing coat M 30 grade including reinforcement complete as per drawing and Technical specifications clauses 800 and 1206.3 A) With crushed stone

12.6

-

16451.67

... More
Construction of RCC railing of M 25 grade ,in cast in situ with 20 mm nominal size aggregate, true to line and grade , tolerance of vertical railing post not exceed 1 in 500 , center center spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800,900 and 1208.3

52.8

-

2612.56

... More
Drainage Spouts complete as per approved drawing and technical specifications clause 1209

11

-

10018.58

... More
Burried Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).

15

-

1691.61

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid in dry in front of toe of embankment complete as per drawing and Technical specification

273.18

-

4154.45

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification

91.06

-

4323.95

... More
Providing and laying boulder apron on river bed for protevtion against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.

285.1

-

4154.45

... More
Road Side CC Drain : Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

522

-

135.6

... More
Plain / Reinforced cement concrete in open foundation complete as per drawing and technical specification including steel shuttering formwork. PCC Grade M10

58

-

6377.72

... More
Plain / Reinforced cement concrete in open foundation complete as per drawing and technical specification including steel shuttering formwork. PCC Grade M15

182.7

-

6924.64

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

1218

-

160.46

... More
Kilometer Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 i) 5th Kilometer Stone (Precast)

6

-

4713.21

... More
Kilometer Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 ii) Ordinary Kilometer Stone (Precast)

29

-

2928.96

... More
Kilometer Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 iii) 200 m stone (precast)

112

-

777.44

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

10269.97

-

989.88

... More
Providing reflective pavement marker with a provision of spike at the bottom with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRTH & H's fixed to the road surface using the adhesives and the procedures recommended by the manufacturers with three months replacement warranty and free maintenance.

11200

-

281.37

... More
Supplying, fitting and fixing RCC guard post 150cm long erected 75cm above the ground and 75cm below the ground with M-15 grade (nominal mix 1:2:4 with broken stone aggregate up to 20mm size) of cement concrete and required reinforcement tied in position with annealed black wire including centering, moulding the top, curing including painting concrete surfaces in 23cm strips upto 0.75m from the top alternately in black and white and having 2 nos. reflective band of desired shade etc. complete as per design and as directed. 30 cm dia. RCC guard post with reinforcement of 6nos. 12mm dia TMT main steel bars and 6mm TMT/ MS stirrups at 15cm c/c.

600

-

2493.91

... More
Providing & fixing retro – reflectorised cautionary, mandatory and informatory sign as per IRC:67 made encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and technical specification Clause 801 vi) 60cm x 60cm square

19

-

7019.56

... More
Providing & fixing retro – reflectorised cautionary, mandatory and informatory sign as per IRC:67 made encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and technical specification Clause 801 ii) 60cm equilateral triangle

23

-

4578.76

... More
Providing & fixing retro – reflectorised cautionary, mandatory and informatory sign as per IRC:67 made encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and technical specification Clause 801 iii) 60cm circular

27

-

6098.61

... More
Tree Plantation : Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year.

140

-

745.8

... More
Carrying out Sub Soil investigation (SSI) for all type of soil (except boring in rock) upto depth of 30 m or refusal (N=100) for each foundation location as per IRC 78-2014 and submission of SSI report to the Engineer in charge for approval. Preparation & submission of Design calculation & Drawings of foundation , sub structure,Super structure as relevant IRC Codes and SSI Report , 2 (two) each of Design & Drawing of each bridge to be bmitted for approval and 8 (eight) copies after approval of competent authority.

3

-

60000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.