Project Implementation Unit Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Project Implementation Unit Tender
Other Consultancy Services
Consultancy Services
Eprocure
Opening Date22 Aug 2023
Closing Date26 Sep 2023
Tender Amount₹ 20,00,00,000 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 40,00,000Document Cost
₹ 20,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UADEA_32159_1Bid Award Id
ViewTender No
GWSP/LCB/C-9/2023-24/05Tender Authority
Project Implementation Unit ViewPurchaser Address
-Website
http://assamtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Historian server (Rack Mountable NAS Server)-Redundant configuration
1
-
-
Rack cabinet inclusive of Rack monitoring system complete with 22"LCD Monitor & computer
1
-
-
Engineering & Operating stations with 32" Dual LED Monitor +SCADA client software +latest windows OS+MS Office networked with SCADA server stations
2
-
-
Desktop Work Stations( with 29"Monitor ) for control center operating staff +latest windows OS+MS Office+Adobe PDF reader
3
-
-
LCD Videowall system and its interface with centralized SCADA
1
-
-
Multifunction Laser printers (Scan,copy, & PrintA3 & A4 size)
1
-
-
SITC OF Software along with documentation for review and approval
-
-
-
SCADA software with 50K tags version with Water demand forecasting & mathematical analysis tool modules for water distribution network to predict water consumption and demand,leak detection and real time integration with Google earth software,GIS software ,for real time view and analysis of the entire network.Note:The demand forecasting & mathematical analysis tool modules shall be from the same OEM.
1
-
-
Google earth license software and integration with SCADA server in real time
1
-
-
Historian software with tags similar to SCADA software Note for Consideration for CWMC- SCADA: The scope of work shall include integration of existing data,Screen dumps from WTP,WPS,reservoirs shall be replicated by the CSC contractor and realtime data integrated in the system.Based on the data,(from Flowmeter in the distribution network,pressure monitoring equipment,the SCADA software shall be able to analyze the water consumption , forecast the water demand and leak detection in the transmission and distribution network.
1
-
-
SITC OF Common Ancillaries to be provided at Centralized SCADA Center-along with documentation for review and approval
-
-
-
REDUNDANT Wireless communication Module to receive and transmit data from/to various remote locations at the CSC Water SCADA server
1
-
-
Routers for Internet access in the control center area
1
-
-
Bio-Metric Access Control system(complete with finger print ,PIN & EM proximity card reader/software,required hardware)-Consider minimum 10 Nos
1
-
-
Industrial Managed Ethernet (24 port) Switches (redundant configuration )
1
-
-
EPABX system for Control center -10 Points
1
-
-
Hotline wired & wireless communication system between control center and various remote sites to alert remote stationed staff in any emergency on any immediate action to be taken (like stopping of pumps,etc)-Consider 10 Locations
1
-
-
16" Industrial Grade Laptops loaded with runtime SCADA licences ,RTU programe
2
-
-
Hi speed broadband leased line to control center for receiving data from various remote stations
1
-
-
Antivirus software-Enterprise version(with 20 client licenses)
1
-
-
Hardware based Firewall & software firewalls for the centralized SCADA center.Fully scalable without any limitations on the number of clients.
1
-
-
Cyber security of the centralized SCADA center as per specifications, Software firewall & hardware firewall details,design,levels of security,configuration,web security audit documentation,procedure,etc to acheive complete security for the SCADA center
1
-
-
Supply of Industrial type Control system consoles for main control room area of SCADA control center ,Ergonomic chairs,Work desks,tables,furniture to augument control room design,presentation room facilities,cabinets etc as per requirements
1
-
-
Precision airconditioning for control room Server room area
1
-
-
UPS System - 2x 20 KVA, Parallel Redundant ,Standalone,Online,microprocessor based UPS System with SMF batteries for 120 minutes backup with all required cabling,required accessories.
1
-
-
Supply, Installation and commissiining of DG set with AMF Panel 20kVA-25kVA + AMF Panel
1
-
-
SITC OF Other Software to be provided under this contract
-
-
-
Development & Impementation of Andriod app for accessing the Water data and real time alerts on alarm situations in the water transmission network,distribution network,water quality,pressure drop in pipeline,etc.
1
-
-
SITC OF Control Center Ancillaries
-
-
-
Interior design works to the approval of the Engineer,presentation room facilities,Glass partitions,fire rated glass partitions for server room and control room area,false ceiling,flooring , Logo stickers etc.. as per requirements and to the approval of the Engineer. Approximate area- 4500Sq Ft
1
-
-
SITC OF Field Instrumentation & Automation at Various Location in Water Transmisison and Distribution Network
-
-
-
Mains powered Datalogger with wireless communication network,inclusive of Sim card to transmit the data (flow & pressure )in real time from the water distribution network to the CWMC.On a minimum 4 times data transfer per day to be considered,which shall be configurable from the CWMC for sequential data polling or on demand from CWMC.The entire system shall be housed in a lockable IP-65 rated enclosure. with Required cabling,conduiting,other required accessories for interfacing and integration with existing equipment
127
-
-
Battery powered Datalogger with wireless communication network,inclusive of Sim card to transmit the data ( pressure )in real time from the water distribution network to the CWMC.The Data logger shall be equipped with battery pack with battery life of minimum 5 years( 4 times data transfer per day to be considered).The entire system shall be housed in a lockable IP-65 rated enclosure. with Required cabling,conduiting,other required accessories for interfacing and integration with existing equipment
250
-
-
Supply, Installation, Testing and Commission of Pressure Transmitter(0-16 Bar) (at inlet & outlet of each DMA in the water distribution network) with integration with datalogger transmission unit for real time data transfer for subsequent data transmission to CWMC-Centralized SCADA center.
377
-
-
Pressure Transmitter(0-16 Bar) with integration with datalogger transmission unit for real time data transfer for subsequent data transmission to CWMC-Centralized SCADA center.To be installed in the water transmission network
1
-
-
Associated required minor civil work for installation of panel
30
-
-
Actuated Valve Monitoring & Control in water transmission network:
-
-
-
Supply, Installation, Testing and Commission of RTU with wireless communication module,Sim card along the transmission main to monitor and operate the actuated valves in the water transmission network with all required accesories,cabling,conduitls,cable trays ,etc .The entire system shall consist of required lockable IP-65 rated enclosure to house the RTU,wireless communication modules.The enclosure shall be equipped with limit switch contact for door(on opening of the same,the signal shall be initiated as door Open/Close)with wireless communication to centralized SCADA center.Solar Power panels shall be mounted on top of panel for providing backup power to RTU and wireless communication equipment. The Panel shall be equipped with Rotating beacon light to indicate any fault in the instrument.The RTU shall be integrated with the CWMC-Centralized SCADA center in real time and the actuated valve shall be operated to Open/Close the valve based on requirment and Pressure events(High/Low).
20
-
-
Supply, Installation, Testing and Commission of Pressure Transmitter(0-16 Bar) (at inlet & outlet of each DMA) with integration with datalogger transmission unit for real time data transfer for subsequent data transmission to CWMC-Centralized SCADA center.To be installed in the water transmission network
20
-
-
Supply, Installation, Testing and Commission of Solar power panel for powering all instrument (pressure),RTU equipment & wireless communication devices,with required pole mast for mounting the solar panel and all required accesscories ,cabling,conduits,etc
20
-
-
Required power cabling,conduiting,other required accessories from nearest power source to power the RTU(Consider minimum 25 mtrs of length)
20
-
-
Minor civil works for installation of panel ,etc as required at each location
20
-
-
Reservoir -Instrumentation & Automation & Integration with Centralized SCADA Center
-
-
-
Supply, Installation, Testing and Commission of 16"color touch HMI Panel with SCADA runtime licenses installed along with RTU at Reservoirs locations to monitor & control status (Open/Close) of the Valves of the transmision network.Note: Based on site conditions,the valves shall be controlled either by CWMC or the Reservoirs locations.
9
-
-
IP-65 rated panel enclosure to house the HMI panel(mounted in front of panel),Water quality equipment,etc.Panel to be equipped with buzzer to alert operators on any Alarm condition in the transmisison network.
9
-
-
Supply, Installation, Testing and Commission of On-line Real Time Water Quality Multi Parameters Instrument for measuring Residual Chlorine, pH, TDS, Turbidity ( as a singlemultiple parameter unit) all the parameters at individual ground level reservoirs mounted in IP-65 rated enclosure.Inclusive of required piping for sampling of the testing media.Data communication to Centralized SCADA center.
9
-
-
Wireless communication modules to transmit & receive data to CWMC- Centralized SCADA center
9
-
-
Supply, Installation, Testing and Commission of 3 KVA UPS with battery backup of 60 Mins on Full Load-UPS with AC Distribution Board.
9
-
-
Installation accessories inclusive of (Instrument & power cable ,cable trays,surge protection devices,earthing,etc)
9
-
-
SITC OF On-line Real Time Water Quality Multi Parameters Instrument In Water Distribution Network at strategic location's (Key Water Contamination areas/Inlet to DMA ) & data Transmission to CWMC-Centralized SCADA Center
-
-
-
Supply, Installation, Testing and Commission of On-line Real Time Water Quality Multi Parameters Instrument for measuring Residual Chlorine, pH, TDS, Turbidity ( as a single multiple parameter unit) at various locations,Inclusive of required piping for sampling of the testing media.Data communication to Centralized SCADA center.
30
-
-
IP-65 rated enclosure to house the water quality Multi parameters instrument,UPS,wireless communication modules.The enclosure shall be equipped with locking facility,limit switch contact for door(on opening of the same,the signal shall be initiated as door Open/Close)with wireless GPRS communication to centralized SCADA center.Solar Power panels shall be mounted on top of panel for providing power to equipment. The Panel shall be equipped with Rotating beacon light to indicate any fault in the instrument.
30
-
-
Supply, Installation, Testing and Commission of Solar power panel for powering the water quality equipment,wireless communication devices
30
-
-
Rigid wrought iron fence with painting & inbuilt locking facility ,the size shall be suited to encircle the enclosure/panel completely to prevent vandalism
30
-
-
Pavement/Road restoration cost at each location( as applicable)
30
-
-
Comprehensive Operation & Maintenance for a period of Five Years(5)
-
-
-
Comprehensive operation & maintenance of the CWMC-Centralized SCADA center along with all equipment installed under this contract package for a period of Five years,along with required manpower(3 Shifts) to run the centralized SCADA center,maintain all remote sites ,security staff(3 shifts-8 Hour each) for control center,data transmission cost from remote sites to central SCADA center ,leased line costs,internet cost-Operation & Maintenance of complete supplied system including regular Licensed software & hardware updates,Cyber security , maintenance of control center & associated hardware,operation of control center 24 x 7 wireless communication costs,maintenance of all electrical equipment installed under this contract,control center consumables, insurance,other supporting systems components, Precision Air conditioning systems, manpower engagement on 24x7 basis etc.Addition of New & existing facilities during the O&M period.
1
-
-
1st Year of Comprehensive O&M (Including defect Liability period) Includes the cost of Training of end user personnel for operating & managing the control center for a period of 30 days during the 1st month of 1st year O&M
1
-
-
2nd Year of Comprehensive O&M
1
-
-
3rd Year of Comprehensive O&M
1
-
-
4th Year of Comprehensive O&M
1
-
-
5th Year of Comprehensive O&M -Note: Consider replacement of key IT hardware (SCADA servers,Operator & engineering workstation,Historian station) at Control center,SCADA software to be upgraded to latest version, UPS batteries,etc,along with the above scope of work
1
-
-
fixed provisional Sum of INR
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements