Oil And Natural Gas Corporation Limited Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 64,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ONGC_208860_1Bid Award Id
ViewTender No
RD1RC24006Tender Authority
Oil And Natural Gas Corporation Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Exchange of 1.5TR cut compressor with new compressor of makes Carrier/ Kirloskar/Sriram-Tecumseh/ Voltas/ Blue star /Copeland USA Fedder Lloyd including installation, commissioning and testing.
3
-
-
Exchange of 1.5TR uncut compressor with new compressor of make Carrier/Kirloskar/Sriram-Tecumseh/ Voltas/ Blue star /Copeland USA Fedder Lloyd, including installation, commissioning and testing.
10
-
-
Exchange of 1.5 TR Rotary compressor carrier/ Kirloskar/ Sriram-Tecumseh / Voltas / Blue star / Copeland USA / Fedder Lloyd, including installation, commissioning and testing.
3
-
-
Supply and replacement of condenser coil of 1.5 TR AC.
20
-
-
Gas charging of 1.5 TR AC by supplying gas R22 including leak test and flushing (Gas charging shall be done through drier only).
110
-
-
Supply and Replacement of thermostat of makes Danfoss/BCH.
80
-
-
Supply and Replacement of air filter. (Type Plastic/ jute)
25
-
-
Supply and Replacement of running Capacitor of make Vertex/Uptron / Usha
220
-
-
Supply and Replacement of starting Capacitor of make Vertex/ Uptron/ Usha
20
-
-
Supply and Replacement of thermal over load relay(make Sriram/ Rautaon)
20
-
-
Rewinding of blower motor including installation, testing and commissioning
40
-
-
Supply ,installation, testing and commissioning of new blower motor for 1.5 TR AC(Make GE/ Universal/ CG)
25
-
-
Supply ,installation, testing and commissioning of starting relay.(make: Sriram/Rautaon)
30
-
-
Supply & Replacement of front grill of 1.5 TR AC unit.
15
-
-
Supply and Replacement of outer cover of 1.5 TR window AC unit.
15
-
-
Supply ,installation, testing and commissioning of new cooling coil of 1.5 TR window AC unit
15
-
-
Painting of complete AC unit (inner and outer surface)
10
-
-
Installation of new/shifted window AC unit including supply and fixing of wooden/ metal frame, associated cement work, electrical control gears, wiring, and complete installation of AC unit.
50
-
-
Supply and installation of new blower fan for 1.5 TR window AC
30
-
-
Supply and installation of condenser fan for 1.5 TR window AC
30
-
-
Control unit with remote controller of 1.5 TR window AC
40
-
-
Supply & installation of new 1.5 ton (TR) compressor of makes Kirloskar/ Voltas/ Sriram-Tecumseh/ Carrier/ Feeders Lloyd/Blue Star after removing the existing compressor (the existing compressor shall be retained by ONGC)
18
-
-
Supply & installation of new 1.5 ton (TR) Rotary compressor of makes Kirloskar/ Voltas/Sriram-Tecumseh/ Carrier/ Feeders Lloyd/Blue Star after removing the existing compressor (the existing compressor shall be retained by ONGC)
3
-
-
Supply & installation of new 1.5 TR window AC front grill
15
-
-
2.0 TR WINDOW AC (2 nos)
-
-
-
Dismantling & re-installation of 1.5 / 2.0 TR window AC unit during rig movement.
350
-
-
1.5 TR SPLIT TYPE AC (162 nos.)
-
-
-
Servicing of 1.5 TR split AC as per scope of work
972
-
-
Installation of new/shifted Split AC unit including supply and fixing of following: foundation for condenser unit, associated cement work, electrical control gears, wiring(1.5T split AC)
78
-
-
Painting of the air conditioner as and when required. (Requisition shall be issued by the EIC.) Painting of the metal parts of Air conditioner to be done after thoroughly cleaning the surfaces with emery paper. One coat of metal primer and finishing of matching shade of original colour to be applied. Paint must be of approved make only.(1.5T s/AC)
6
-
-
Exchange of 1.5 ton (TR.) compressor with new compressor of makes Kirloskar/ Voltas/Sriram-Tecumseh / Carrier/ Feeders Lloyd/Blue Star including installation of new compressor.
6
-
-
Supply & replacements Thermistor / Thermostat Assembly. (1.5 TR split AC)
12
-
-
Supply & Replacement of Capillary and strainer. (1.5 TR split AC)
12
-
-
Supply & Installation of starting capacitor of make Vertex / Uptron / Usha. (1.5 TR split AC)
12
-
-
Supply & Installation of running capacitor of make Vertex / Uptron / Usha.(1.5 TR split AC)
100
-
-
Supply & installation of starting relay of Sriram / Rautaon make.(1.5 TR split AC)
8
-
-
Supply & Installation of new Air Filter. (1.5 TR split AC)
8
-
-
Repair of Control PCB for outdoor unit. (1.5 TR split AC)
8
-
-
Supply and installation of thermal O/L relay. (1.5 TR split AC)
8
-
-
Supply and installation of Evaporator Fan Motor.(1.5 TR split AC)
15
-
-
Supply and installation of Evaporator Fan.(1.5 TR split AC)
8
-
-
Repair of Control PCB for indoor unit.(1.5 TR split AC)
18
-
-
Supply & Installation of new Remote controller Assembly. (1.5 TR split AC)
30
-
-
Supply & Installation of new Swing motor.(1.5 TR split AC)
8
-
-
Supply & Installation of new condenser fan motor (Make GE/ Universal/CG).(1.5 TR split AC)
10
-
-
Supply & Installation of new Condenser fan. (1.5 TR split AC)
8
-
-
Supply & Installation of new Suction valve (1.5 TR split AC)
8
-
-
Supply & Installation of new Discharge valve (1.5 TR split AC)
8
-
-
Gas charging of 1.5 (TR) Split AC by supplying gas including leak test and flushing (Gas charging shall be done through drier only).
150
-
-
Supply & installation of new 1.5 ton (TR) compressor of makes Kirloskar/ Voltas/Sriram-Tecumseh/ Carrier/ Feeders Lloyd/Blue Star after removing the existing compressor (the existing compressor shall be retained by ONGC)
25
-
-
Erection of foundation of condenser unit of 1.5TR Split AC involving civil work with necessary arrangement of foundation bolts etc. for installation of condenser unit.
4
-
-
Supply & installation of new 1.5 TR split AC outdoor condenser coil
8
-
-
Supply & installation of new 1.5 TR split AC outdoor fan motor (the existing fan motor be retained by ONGC)
8
-
-
Supply & installation of new 1.5 TR split AC PCB Remote Controller
8
-
-
Supply & installation of new 1.5 TR split AC Blower wheel
8
-
-
2.0 TR SPLIT TYPE AC (74 nos)
-
-
-
Servicing of 2.0 TR split AC as per scope of work
444
-
-
New installation of Split AC unit including supply and fixing of following: foundation for condenser unit, associated cement work, electrical control gears, wiring (2 TR split AC). This item shall be applicable if model/capacity and make of Split AC is not matching with the existing one.
6
-
-
Supply & replacements Thermistor / Thermostat Assembly (2 TR split AC)
10
-
-
Supply & Replacement of Capillary and strainer (2 TR split AC)
6
-
-
Supply & Installation of starting capacitor of make Vertex / Uptron / Usha (2 TR split AC)
6
-
-
Supply & Installation of running capacitor of make Vertex / Uptron / Usha (2 TR split AC)
60
-
-
Supply & installation of starting relay of Sriram / Rautaon make (2 TR split AC)
6
-
-
Supply & Installation of new Air Filter (2 TR split AC)
6
-
-
Repair of Control PCB for outdoor unit (2 TR split AC)
10
-
-
Supply and installation of thermal O/L relay (2 TR split AC)
6
-
-
Supply and installation of Evaporator Fan Motor (2 TR split AC)
11
-
-
Supply and installation of Evaporator Fan (2 TR split AC)
6
-
-
Repair of Control PCB for indoor unit (2 TR split AC)
6
-
-
Supply & Installation of new Remote controller Assembly (2 TR split AC)
15
-
-
Supply & Installation of new Swing motor (2 TR split AC)
6
-
-
Supply & Installation of new condenser fan motor (Make GE/Universal/CG) (2 TR split AC)
6
-
-
Supply & Installation of new Condenser fan (2 TR split AC)
6
-
-
Supply & Installation of new Suction valve (2 TR split AC)
6
-
-
Supply & Installation of new Discharge valve (2 TR split AC)
6
-
-
Gas charging of 2 TR Split AC by supplying gas including leak test and flushing (Gas charging shall be done through drier only).
100
-
-
Painting of the air conditioner as and when required. (Requisition shall be issued by the EIC.) Painting of the metal parts of Air conditioner to be done after thoroughly cleaning the surfaces with emery paper. One coat of metal primer and finishing of matching shade of original colour to be applied. Paint must be of approved make only (2 TR split AC)
6
-
-
Exchange of 2 ton (TR) compressor with new compressor of makes Kirloskar/ Voltas/Sriram-Tecumseh/ Carrier/ Feeders Lloyd/Blue Star including installation of new compressor
6
-
-
Supply & installation of new 2 ton (TR) compressor of makes Kirloskar/ Voltas/Sriram-Tecumseh/ Carrier/ Feeders Lloyd/Blue Star after removing the existing compressor (the existing compressor shall be retained by ONGC)
12
-
-
Erection of foundation of condenser unit of 2TR Split AC involving civil work with necessary arrangement of foundation bolts etc. For installation of condenser unit.
4
-
-
Supply & installation of new 2.0 TR split AC outdoor condenser coil after removing the existing condenser coil (the existing condenser coil be retained by ONGC)
6
-
-
Supply & installation of new 2.0 TR split AC outdoor fan motor (the existing fan motor be retained by ONGC)
6
-
-
Supply & installation of new 2.0 TR split AC PCB Remote Controller
6
-
-
Supply & installation of new 2.0 TR split AC Blower wheel
6
-
-
Supply & installation of new 1.5 TR/ 2.0 TR split AC outdoor stand
6
-
-
4 TR DUCTABLE SPLIT TYPE (SCADA) (24 nos)
-
-
-
Servicing of 4.0 TR of Haier AC as per scope of work
144
-
-
Supply, installation, testing and commissioning of new Evaporator suitable for 4.0 TR duct-able AC.
1
-
-
Supply , installation , testing and commissioning of new Condenser suitable for 4.0 TR duct-able split AC.
1
-
-
Supply , installation , testing and commissioning of new Condenser fan suitable for 4.0 TR duct-able split AC.
2
-
-
Supply , installation , testing and commissioning of new blower motor suitable for 4.0 TR duct-able AC.
2
-
-
Exchange of defective blower motor with repaired motor having six months warranty (suitable for 4.0 TR). Installation, Testing, and Commissioning of the same.
5
-
-
Supply , installation , testing and commissioning of new fan capacitor suitable for 4.0 TR duct-able AC.
4
-
-
Supply, installation , testing and commissioning of new running capacitor suitable for 4.0 TR duct-able AC.
15
-
-
Supply , installation , testing and commissioning of new starting capacitor suitable for 4.0 TR duct-able AC.
4
-
-
Supply, installation, testing and commissioning of new Strainer filter with capillary suitable for 4.0 TR split AC.
4
-
-
Supply, installation, testing and commissioning of new expansion valve suitable 4.0 TR duct-able AC
4
-
-
Supply, installation, testing and commissioning of new Rotary Compressor suitable for 4.0 TR duct-able AC.
5
-
-
Supply, installation, testing and commissioning of new cooling thermostat (digital) suitable 4.0 TR duct-able split AC
4
-
-
Supply , Installation , Testing , and Commissioning of new Time delay relay, 3 minutes suitable for 4.0 TR duct-able AC.
4
-
-
Supply, installation, testing and commissioning of new high pressure switch make Dan Foss suitable for 4.0 TR duct-able AC.
4
-
-
Supply, installation, testing and commissioning of new low pressure switch make Dan Foss suitable for 4.0 TR duct-able AC.
4
-
-
Supply , Installation , Testing , and Commissioning of new MCB, 63 A, Make : HAVELLS/ STANDARD/ L&T / SIEMENS suitable or 4.0 TR duct-able AC .
4
-
-
Supply, Installation, Testing, and Commissioning of new Evaporator blower fan suitable or 4.0 TR duct-able AC.
4
-
-
Supply, Installation, Testing, and Commissioning of new condenser blower fan suitable or 4.0 TR duct-able AC.
4
-
-
Supply, Installation, Testing, and Commissioning of new magnetic contactor for compressor Make L & T/Siemens/GE suitable or 4.0 TR duct-able AC.
5
-
-
Supply, Installation, Testing, and Commissioning of new magnetic contactor for blower motor Make L & T/Siemens/GE suitable or 4.0 TR duct-able AC.
4
-
-
Supply, Installation, Testing, and Commissioning of sheet metal work (GI) for 4.0 TR duct-able AC.
4
-
-
Supply , Installation , Testing , and Commissioning of new Multi core multi strand PVC insulated & PVC sheathed flexible copper cable of size 4 core x 2.5 sq. mm.
4
-
-
Supply, Installation, Testing, and Commissioning of new Anti-vibration rubber mounting pads suitable for 4.0 TR duct-able AC.
4
-
-
Supply, Installation, Testing, and Commissioning of new Air filter, suitable for 4.0 TR duct-able AC.
4
-
-
Supply , Fixing and Testing of PE Foam 6 mm suitable for 4.0 TR duct-able split AC
4
-
-
Supply, Installation, Testing, and Commissioning of new control knob 2way suitable for 4.0 TR duct-able AC.
4
-
-
Supply, Installation, Testing, and Commissioning of new 32A HRC fuse link base & top make EE/L&T suitable for 4.0 TR duct-able AC.
5
-
-
Supply, Installation, Testing, and Commissioning of new 2A control HRC fuse link base & top make EE/L&T suitable for 4.0 TR duct-able AC.
5
-
-
Supply , Installation , Testing , and Commissioning of new suction line 5/8 inch, suitable for 4.0 TR duct-able AC.
5
-
-
Supply , Installation , Testing , and Commissioning of new Discharge line 3/8 inch, suitable for 4.0 TR duct-able AC.
5
-
-
Supply of new Copper brazing rod (14% silver)
5
-
-
Supply of new Refrigerant Gas R410a and gas charging (full charging for 4.0 ton Compressor) with proper pressure and quantity by using the same.
24
-
-
Painting of complete AC unit (inner and outer surface)
3
-
-
Repair of control PCB for outdoor unit (4 TR duct-able AC)
7
-
-
Repair of control PCB for indoor unit (4 TR duct-able AC)
3
-
-
Supply of new control PCB for outdoor unit (4 TR duct-able AC)
3
-
-
Supply of new control PCB for indoor unit (4 TR duct-able AC)
3
-
-
4 TR FLOOR / TOWER TYPE SPLIT AC (7 nos)
-
-
-
Servicing of 4 TR Floor (Tower) Type Split AC as per scope of work
42
-
-
New installation of Split AC unit including supply and fixing of following: foundation for condenser unit, associated cement work, electrical control gears, wiring (4 TR Floor (Tower) Type Split AC). This item shall be applicable if model/capacity and make of Floor (Tower) Type Split AC is not matching with the existing one.
1
-
-
Supply, installation, testing and commissioning of new Evaporator suitable for 4 TR Floor (Tower) Type Split AC
1
-
-
Supply , installation , testing and commissioning of new Condenser suitable for 4 TR Floor (Tower) Type Split AC
1
-
-
Supply , installation , testing and commissioning of new Condenser fan suitable for 4 TR Floor (Tower) Type Split AC
1
-
-
Supply , installation , testing and commissioning of new Condenser fan motor suitable for 4 TR Floor (Tower) Type Split AC. Bidder to indicate capacity of quoted fan motor.
1
-
-
Supply & replacements Thermistor / Thermostat Assembly (4 TR Floor (Tower) Type Split AC)
1
-
-
Supply & Replacement of Capillary and strainer (4 TR Floor (Tower) Type Split AC)
2
-
-
Supply & Installation of starting capacitor of make Vertex / Uptron / Usha (4 TR Floor (Tower) Type Split AC)
1
-
-
Supply & Installation of running capacitor of make Vertex / Uptron / Usha (4 TR Floor (Tower) Type Split AC)
1
-
-
Supply & installation of starting relay of Sriram / Rautaon make (4 TR Floor (Tower) Type Split AC)
1
-
-
Supply & Installation of new Air Filter (4 TR Floor Tower Type Split AC)
1
-
-
Supply and installation of thermal O/L relay (4 TR Floor (Tower) Type Split AC)
1
-
-
Supply and installation of Evaporator Blower Motor (4 TR Floor (Tower) Type Split AC). Bidder to indicate capacity of quoted blower motor.
1
-
-
Supply and installation of Evaporator Blower (4 TR Floor (Tower)Type Split AC)
1
-
-
Repair of Control PCB for indoor unit (4 TR Floor (Tower)Type Split AC)
1
-
-
Supply & Installation of new Remote controller Assembly (4 TR Floor (Tower)Type Split AC)
2
-
-
Supply & Installation of new Swing motor (4 TR Floor (Tower) Type Split AC)
1
-
-
Supply & Installation of new Suction valve (4 TR Floor (Tower) Type Split AC)
1
-
-
Supply & Installation of new Discharge valve (4 TR Floor (Tower)Type Split AC)
1
-
-
Gas charging of 4 TR Floor (Tower) Type Split AC by supplying gas including leak test and flushing (Gas charging shall be done through drier only).
1
-
-
Supply, Installation, Testing, and Commissioning of new Air filter, suitable for 4 TR Floor (Tower) Type Split AC.
1
-
-
Supply , Installation , Testing , and Commissioning of new suction line 5/8 inch, suitable for 4 TR Floor (Tower) Type Split AC
1
-
-
Supply , Installation , Testing , and Commissioning of new Discharge line 3/8 inch, suitable for 4 TR Floor (Tower) Type Split AC
1
-
-
Supply of new Refrigerant Gas R22 and gas charging (full charging of compressor of 4 TR Floor (Tower) Type Split AC) with proper pressure and quantity by using the same. (Approx. Qty 2.0 Kg)
2
-
-
Painting of the air conditioner as and when required. (Requisition shall be issued by the EIC.) Painting of the metal parts of Air conditioner to be done after thoroughly cleaning the surfaces with emery paper. One coat of metal primer and finishing of matching shade of original colour to be applied. Paint must be of approved make only (4 TR Floor (Tower) Type Split AC)
1
-
-
Exchange of 4 ton (TR) compressor with new compressor of makes Kirloskar/ Voltas/Sriram-Tecumseh/ Carrier/ Feeders Lloyd/Blue Star including installation of new compressor
2
-
-
Supply & installation of new 4 ton (TR) compressor of makes Kirloskar/ Voltas/Sriram-Tecumseh/ Carrier/ Feeders Lloyd/Blue Star after removing the existing compressor (the existing compressor shall be retained by ONGC)
1
-
-
Erection of foundation of condenser unit of 4 TR Floor (Tower) Type Split AC involving civil work with necessary arrangement of foundation bolts etc. For installation of condenser unit.
1
-
-
REFRIGERATORS & DEEP FREEZERS (1nos)
-
-
-
Maintenance/ Servicing of Refrigerator, including any type of repair/replacement of spares required, except cost of replacement of compressor & fan motor and charging of refrigerant R134-a.
6
-
-
Compressor Replacement of Refrigerator (315 LT) of same specification.(Make: LG/ Kirloskar/ Videocon/ Emerson Copeland )
1
-
-
Fan motor Replacement of Refrigerator (315 LT) of same specification for cooling unit.(Make: GE/ CG/ Kirloskar)
1
-
-
Charging of Refrigerant (R134-a) for 315LT Refrigerator with leak test.
1
-
-
Supply of new Refrigerant Gas R32
50
-
-
Supply of new Refrigerant Gas R410a
25
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements