Numaligarh Refinery Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Numaligarh Refinery Limited - NRL Tender

Goods
Environmental Service
Eprocure
Opening Date5 Mar 2024
Closing Date10 May 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Supply Of Ambient Air Quality Monitoring System (aaqms) For Numaligarh Refinery Expansion Project

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
NITROGEN (NO-NO2-NOx) ANALYSER (Chemiluminescence principle, Rack mounted, Sample handling units,online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/Guarantee.)

1

-

-

... More
NH3 ANALYSER (Chemiluminescence principle, Rack mounted, Sample handling units,online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/Guarantee.)

1

-

-

... More
CARBON MONOXIDE (CO) ANALYSER (Non-Dispersive Infra-Red (NDIR) principle, Rack mounted, Sample handling units, online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT,Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
OZONE (O3) ANALYSER (UV Photometric / Chemiluminescence principle, Rack mounted, Sample handling units, online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
CARBON DI OXIDE (CO2) ANALYSER (Non-Dispersive Infra-Red (NDIR) principle, Rack mounted, Sample handling units,online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
TOTAL HYDROCARBON ANALYSER (Flame ionization detection (FID) principle, Rack mounted, Sample handling units,online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
BTEX ANALYSER / MARKAPTAN ANALYSER (Gas Chromatographic separation and Photo Ionization Detector (PID) principle, Rack mounted, Sample handling units,online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
CONTINUOUS PM2.5 MONITORING ANALYSER (β-ray attenuation principle, Rack mounted, Sample handling units,online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
CONTINUOUS PM10 MONITORING ANALYSER (β-ray attenuation principle, Rack mounted, Sample handling units,online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
MULTI POINT GAS CALIBRATION SYSTEM (Auto calibration for calibration of SO2, H2S, NO-NO2-NOx, NH3, CO, CO2, O3, THC and BTEX analyser, Markaptan Analyzer, Titration/ Dilution principle, Rack mounted, Sample handling units, online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
ZERO AIR GENERATOR (Ultra high purity zero air generator unit including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
AIR COMPRESSOR UNIT Air compressor unit(Tank mount type) with drier system for shelter air requirements

1

-

-

... More
METEOROLOGICAL SYSTEM (Wind speed, Wind direction, vertical wind direction, Ambient temperature, Relative humidity, Solar radiation, Solar shield, Pressure sensor, Rainfall, tower mounted, online calibration features, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
TELESCOPIC CRANK – UP METEOROLOGICAL TOWER (10 M extendable tower, grounding, lightning kit and warning lights and other requirement including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
AAQMS SHELTER (Prefabricated Shelter, split AC, safety items, furniture, tools kits, safety system with F&G Devices, Junction boxes, utilities, Fibre optic patch cords other accessories and complete with installation of tubing/ fittings as required including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
OPERATING/ ENGINEERING WORKSTATION Operating /Engineering work station present inside the shelter shall act as central monitoring station ((with Single screen display) ) inside the AAQMS shelter along with console Printer table with drawers, Chair-non revolving, chamber file cabinet for Document & other Storage, Tool kit bags with all required tools for maintenance, First aid box with first aid kits, Fire extinguisher, Industrial grade vacuum cleaner, Indoor temperature & humidity monitor

1

-

-

... More
DAS SYSTEM (Data Acquisition with required software/ hardware including Packing & Forwarding, Start- up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
REMOTE CONSOLE / HMI (Remote Console / HMI(with Double screen display) with required software/ hardware at Security Building, including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
NETWORK CABINET (Network cabinets with networking devices etc including Ethernet/FO hardware and software for connecting with CPBA and PCBA and for connecting with HMI/server in security building including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
PDB CABINET PDB Cabinet 3 phase power input, with necessary terminal sizes and suitable cable glands, Lightening surge protector of suitable type and rating for all incoming power lines

1

-

-

... More
WIRELESS NETWORK PROVIDER Wireless network provider shall be provided to transfer data to entry gate and other is to existing shelter(including engineering, configuration, supply of transmitter and receiver, hardware, accessories for complete transfer of data). Any coordination between wireless network as per philosophy to be taken care.

2

-

-

... More
FIREWALL AND TUNNELLER (Firewall and tunneller, hardware for wireless connection etc,. for required places including Packing & Forwarding, Start-up and commissioning Spares, Documentation, FAT, Inspection and Testing, Special tools and Warranty/ Guarantee.)

1

-

-

... More
SERVER Server shall be provided at admin building to store, retrieve and transfer data to other stations

1

-

-

... More
Mandatory Spares as per MR TP-1ZZZA-IC-RFQ-0028 in Lumsum

1

-

-

... More
Calibration and carrier gases (Calibration gases are required for six months of normal operation. Calibration cylinder design shall be considered for 1 year operation) (Lumpsum)

1

-

-

... More
TPI Charges (excluding GST) for all the items including mandatory spares

1

-

-

... More
Transportation Charges (excluding GST) for all the items including mandatory spares

1

-

-

... More
Training 2 batch x10 people at site Per Analyser (1 engineer batch + 1 technician batch) (Lumpsum)

1

-

-

... More
Training 2 NRL engineers for 5 days at OEM’s Works. . (Lumpsum)

1

-

-

... More
Post commissioning operation/ maintenance support during warranty period (Periodic visits (3 visits (Mandatory) of the expert of OEM /1 no. Engineer + 1 no Technical assistant required for 3 days of each visit /OEM’s representative shall be considered for healthiness checking/ troubleshooting/Supervisory advice etc. during Warranty Period)

1

-

-

... More
Supervision charges for Erection, Testing & commissioning. Per-diem rate 1 Man day of Supervision Charges on normal working days as per MR (Per Diem)

21

-

-

... More
Total in Figures

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.