Numaligarh Refinery Limited Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NRL_628324_1Bid Award Id
ViewTender No
OC19000313/MKDTender Authority
Numaligarh Refinery Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply and application of approved brand of PHENOLIC BITUMEN BLACK HB PAINT (B1) TWO COATS paints, including steel scaffolding , preparation of surfaces as specified including rub down and touch up of shop/field primer or scrapping of shop/field primer wherever required for all heights, labour, materials, tools and tackles, consumables,supervision, etc. to complete the work in all respects as per specifications, NRL painting Manual and direction of Engineer in Charge
1500
-
-
Supply and application of approved brand of GRAPHITE BASED BITUMINOUS PAINT (B3) TWO COATS paints including steel scaffolding as specified including rub down and touch up of shop/field primer or scrapping of shop/field primer wherever required for all heights, labour, materials, tools and tackles, consumables,supervision, etc. to complete the work in all respects as per specifications, NRL painting Manual and direction of Engineer in Charge
500
-
-
Supply and application of approved brand of COAL TAR EPOXY (C1) ONE COAT paints,including steel scaffolding , preparation of surfaces, as specified including rub down and touch up of shop/field primer or scrapping of shop/field primer wherever required for all heights, labour, materials, tools and tackles, consumables, supervision, etc. to complete the work in all respects as per specifications, NRL painting Manual and direction of Engineer in Charge
1500
-
-
Supply and application of approved brand TWO PACK ALIPHATIC ACRYLIC POLYURETHANE FINISH PAINT (F1) TWO COATS including steel scaffolding , as specified including rub down and touch up of shop/field primer or scrapping of shop/field primer wherever required for all heights, labour, materials, tools and tackles, consumables,supervision, etc. to complete the work in all respects as per specifications, NRL painting Manual and direction of Engineer in Charge.
35000
-
-
Supply and application of approved brand SYTHETIC ENAMEL PAINT (F2) TWO COATS including steel scaffolding , as specified including rub down and touch up of shop/field primer or scrapping of shop/field primer wherever required for all heights, labour, materials, tools and tackles, consumables,supervision, etc. to complete the work in all respects as per specifications, NRL painting Manual and direction of Engineer in Charge.
1500
-
-
Supply and application of approved brand of TWO PACK EPOXY POLYAMIDE MIO UNDERCOAT (U1) ONE COAT.including steel scaffolding , preparation of surfaces as specified including rub down and touch up of shop/field primer or scrapping of shop/field primer wherever required for all heights, labour, materials, tools and tackles, consumables, supervision, etc. to complete the work in all respects as per specifications, NRL painting Manual and direction of Engineer in Charge.
15000
-
-
Supply and application of approved brand of HEAT RESISTANT PAINT (H1) TWO COATS.including steel scaffolding , preparation of surfaces, as specified including rub down and touch up of shop/field primer or scrapping of shop/field primer wherever required for all heights, labour, materials, tools and tackles, consumables,supervision, etc. to complete the work in all respects as per specifications, NRL painting Manual and direction of Engineer in Charge.
4000
-
-
Supply and application of approved brand of HIGH TEMPERATURE SILICONE COATING (H2) TWO COATS including steel scaffolding , preparation of surfaces, as specified including rub down and touch up of shop/field primer or scrapping of shop/field primer wherever required for all heights, labour, materials, tools and tackles, consumables,supervision, etc. to complete the work in all respects as per specifications, NRL painting Manual and direction of Engineer in Charge.
500
-
-
Lettering/colour coding/painting symbols/signs/Band making on piping/identifications/numbering etc on pipes/equipment/tanks/structures or any other locations as and when required using appropriate paints,colour ,font size as per NRL painting manual ,relevent IS codes ,SCC etc including steel scaffolding, preparation of surfaces, for all heights, labour, materials, tools and tackles, consumables,supervision, etc. to complete the work in all respects as per specifications and direction of Engineer in Charge.(Cost of background base paint will be paid separately)
100
-
-
Finishing walls with water proofing cement paint of required shade : Old work (one or more coats applied @ 2.20 kg/10 sqm)over priming coat of primer
applied @ 0.80 litrs/10 sqm complete including cost of Priming coat including steel scaffolding for all heights, labour, materials, tools and tackles, consumables, sundries etc to complete the work in all respects as per specifications, IS codes and direction of Engineer in charge
5000
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements