Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Northeast Frontier Railway

  • Tender Amount

    Not specified

  • EMD

    ₹ 23,000

  • Opening Date

    20 Mar 2019

  • Closing Date

    02 Apr 2019

Tender
Summary

Description :coat Hook, Swivel Type. Icf Drawing No: Icf-std-6-4- 010, Col.- 1, Alt - P/2 , Specification No. :as Per Drg.

Documents

No Documents Available

PCMM acting for and on behalf of The President of India invites E-Tenders against Tender No 30190309 Closing Date/Time 02/04/2019 11:30 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. 1. NIT HEADER Bidding type Normal Tender Template Normal Contract type Goods Contract Category Expenditure Tender No 30190309 Tender Type Limited - Indigenous Evaluation Criteria Itemwise/Consigneewise Bidding System Single Packet Pre-Bid Conference Required No Pre-Bid Conference Date Time Not Applicable Tendering Section 30 Inspection Agency CONSIGNEE Publishing Date / Time 20/03/2019 16:29 Procure From Approved Sources No Approving Agency Not Applicable Closing Date Time 02/04/2019 11:30 Validity of Offer ( Days) 60 Ranking Order for Bids Lowest to Highest Tender Doc. Cost (INR) 0.00 Earnest Money (INR) 23000.00 Tender Title Coat Hook, Swivel Type. etc. 2. ITEM DETAILS S.No. PL Code (Group) Item Type GST(Y/N) Stock / NonStock Ordering Consider For Eval Approving Agency Inspection Agency Currency Allowed Estimated Rate 1 30646480 Goods (Y) Stock --- Yes CONSIGNEE INR Description :Coat Hook, Swivel Type. ICF Drawing No: ICF-STD-6-4- 010, col.- 1, Alt - p/2 , Specification No. :As per drg. Consignee DBRT WORKSHOP DEPOT Assam 5000.00 Numbers NBQ WORKSHOP DEPOT Assam 3000.00 Numbers 3. T AND C F.O.R Description Destination Delivery Period Description Delivery /Completion Rate of Supply For all items Commencement : Within 0 Days of issue of Contract, Completion : Within 60 Days thereafter --- Payment Terms S.No Description Payment Terms Page 1 of 3 Run Date/Time: 20/03/2019 16:30:54 STORES/N F RLY TENDER DOCUMENT Tender No: 30190309 Closing Date/Time: 02/04/2019 11:30 1 As per Railway Standard Payment system. Payment will be released through NEFT, firm to upload details of their Bank Account regarding Name of the Bank, Branch Name and Code, Bank Account Number, MICR Code and IFSC code. Statutory Variation Clause S.No Description 1 Applicable. Standard Governing Conditions S.No Description 1 IRS Conditions of Contract: The contract shall be governed by latest version (along with all correction slips) of IRS conditions of contract, and all other terms and conditions incorporated in the tender documents. 4. ELIGIBILITY CONDITIONS Special Eligibility Criteria S.No. Description Confirmation Required Remarks Allowed Documents Uploading 1 Capacity cum capability criteria explained in Para 3.2.1 of attached unified tender documents. Yes Yes Not Allowed 2 Offers without EMD will be summarily rejected ONLY Micro and small enterprises i.e. MSEs registered for the tendered item in terms of railway board letter no. (Available on railway boards website) 2010/RS(G)/363/1 dated 05-July-2012 , other railway and government departments, Indian ordinance factories, PSUs owned by owned by ministry of railways and PSUs for the group of items that are manufactured by them are exempted from EMD. In case, the MSEs exempted from submission of EMD fail to submit SD in stipulated time, damages shall be levied, for failure to it as per offer with regard to condition relating to SD, equal to EMD amount, as would have been applicable if the offer was from a non-MSE vendor. These damages shall be treated as recoveries outstanding against the vendor and dealt with accordingly. No No Not Allowed 3 Security Deposit clause- Firm shall deposit 5% of the total contract value towards security deposit ie 5% of the contract value rounded off to nearest 10. SD shall remain valid for a period of 60 days beyond the date of completion of all contractual obligations. ONLY other railway and government departments, Indian ordinance factories, PSUs owned by ministry of railways and PSUs for the group of items that are manufactured by them are exempted from SD. No No Not Allowed 4 Delivery at single point is not acceptable. In case tenderer quo

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.