National Highways And Infrastructure Development Corporation Limited Tender

... More
The NHIDCL has issued a formal invitation for competitive bids for the National Highways And Infrastructure Development Corporation Limited project, for NHIDCL/DPR/Guwahati-Jorabat bypass/Assam /2018 in Kamrup Metro, Assam. The bid opening date for this tender is 08-05-2018 and the last date for bid submission is 05-06-2018. Interested bidders for National Highways And Infrastructure Development Corporation Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Services
Other Consultancy Services
Consultancy Services
Eprocure
Opening Date8 May 2018
Closing Date5 Jun 2018
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

NHIDCL/DPR/Guwahati-Jorabat bypass/Assam /2018

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Position

1

-

-

... More
Typist

300

-

-

... More
Environment Specialist

3

-

-

... More
Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost)

1

-

-

... More
The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.

300

-

-

... More
LA & Clearances II Report

6

-

-

... More
Land Acquisition Studies

1

-

-

... More
Sub-grade Investigation

1

-

-

... More
Moblization and Demoblization-Inland Travel in Home country (Fixed Costs)

1

-

-

... More
Detailed topographic surveys using mobile/ aerial LiDAR or equivalent technology

25

-

-

... More
Position

1

-

-

... More
Traffic Survey

1

-

-

... More
Support Staff (inclusive of per diem allowance) Note: To be assessed by consultant as per requirement of assignment

-

-

-

... More
Position

1

-

-

... More
Land Acquisition Expert

10

-

-

... More
Draft Feasibility Report

4

-

-

... More
Senior Bridge Engineer

5

-

-

... More
Senior Survey Engineer

7

-

-

... More
Reports and Document Printing

-

-

-

... More
Draft Environmental Assessment report& RAP

4

-

-

... More
Office Boy

300

-

-

... More
Final LA and Clearances I Report

4

-

-

... More
Transportation (Fixed Costs)

-

-

-

... More
Position

1

-

-

... More
Road and Bridge Inventory

1

-

-

... More
Sub-Soil Investigation (Boring) (Rate/m)

-

-

-

... More
Traffic and Safety Expert

4

-

-

... More
Office Furniture and Equipment (Rental)

-

-

-

... More
Environment and Social Impact Screening Report

4

-

-

... More
Highway cum Pavement Engineer

5

-

-

... More
Monthly Report (3 copies per month)

30

-

-

... More
Sub-surface utilities detection using Ground Penetrating Radar, Induction Locator or better technologies

1

-

-

... More
Material Survey and Investigation

1

-

-

... More
Position

1

-

-

... More
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.

-

-

-

... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval

1

-

-

... More
Office Manager

300

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs)

-

-

-

... More
Position

1

-

-

... More
Quantity Surveyor/Documentation Expert

6

-

-

... More
Survey/Investigation using Network Survey Vehicle as per TOR

25

-

-

... More
Position

1

-

-

... More
Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each)

9

-

-

... More
Position

1

-

-

... More
Survey and Investigation A. Topographical Survey (Fixed Rate)

-

-

-

... More
Final Environmental Assessment report& RAP

6

-

-

... More
Remuneration for Local Staff (inclusive of per diem allowance)

-

-

-

... More
Position

1

-

-

10

-

-

... More
a) In soil other than hard rock

1500

-

-

... More
Office Furniture and Equipment

300

-

-

... More
Position

1

-

-

... More
Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.

25

-

-

... More
Utility Expert

4

-

-

... More
Moblization and Demoblization- International Airfares (Fixed Costs) (To be filled by bidders in below columns)

-

-

-

... More
Investigation (Fixed cost)(lumpsum)

-

-

-

... More
Draft LA and Clearances I Report

4

-

-

... More
Position

1

-

-

... More
Estimate of ExpatriateConsultants (Name and position to be filled in below columns by the bidder)

-

-

-

... More
Material cum GeoTechnical Engineer cum Geologist

6

-

-

... More
Sub Professional Staff (To be assessed by consultant as per requirement of assignment)

-

-

-

... More
Socio-economic & Census Survey/Studies

1

-

-

... More
Team Leader cum Sr. Highway Engineer

9

-

-

... More
b) In hard rock

200

-

-

... More
Computer Running Costs

300

-

-

... More
Position

1

-

-

... More
BBD Test and Pavement Evaluation

1

-

-

... More
Drafting Supplies

300

-

-

... More
Fixing Boundary Pillars

-

-

-

... More
Draft Bidding Documents

4

-

-

... More
Axle Load Survey

1

-

-

... More
Office Supplies

300

-

-

... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP

6

-

-

... More
Position

1

-

-

... More
Strip Plan with L.A. Reports

6

-

-

... More
Domestic and International Communication

300

-

-

... More
Final Feasibility Report

6

-

-

... More
Draft Detailed Design Report & Drawings etc. Draft EMP

4

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Final Bidding Documents

6

-

-

... More
Renumeration of Expatriate Staff including per diem allowances

-

-

-

... More
Office Rent

300

-

-

... More
Night Watchman

300

-

-

... More
Inception Report & QAP

3

-

-

... More
Roughness Survey

1

-

-

... More
Position

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.